Garattoni ascenseurs Sàrl
1214 Vernier · about 2.1 km
Garattoni ascenseurs Sàrl, based in Vernier, sells, installs, modernizes, maintains and repairs elevators according to its registered corporate purpose.
profil-emploi.comElevator installation or upgrade · Meyrin

Small project
CHF 51'000 – CHF 126'000
Typical project
CHF 63'800 – CHF 157'500
Large project
CHF 89'300 – CHF 220'600
Computed with our estimator for Meyrin (regional factor included), standard finish. Only the project size changes.
The installation or modernization of an elevator in Meyrin often meets a need for increased accessibility, which is essential in a climate where managing indoor thermal comfort is paramount.
At an altitude of 440 meters and with about 54 frost days per year, the local real estate stock is subject to significant thermal constraints. Anticipating this work allows for the integration of less energy-intensive technologies, consistent with the municipality's environmental performance efforts.
Choosing the right time is strategic to minimize inconvenience. Undertaking a modernization before breakdowns become frequent is an intelligent preventive approach.9 °C. Careful planning, outside of the harsh winter months, ensures greater efficiency of interventions on existing shafts and structures.
The configuration of your project depends primarily on available space and usage. The number of stops and the potential creation of a shaft are the main cost factors. For existing buildings, the option of a self-supporting shaft can be considered if interior space is limited.
The materials used for the cabin, the type of motorization, and the desired security level also influence the project's overall technical complexity.
Modernization options vary according to the desired level of comfort. You can opt for a simple compliance upgrade or a complete renewal of mechanical and electronic components.
Adding communication systems, touch controls, or specific aesthetic finishes allows you to adapt the equipment to the standard of your building. Do not forget to include the annual maintenance contract in your comparison of offers, as it is an essential component for the long-term sustainability of your installation.
The typology of the building stock in Meyrin strongly influences technical feasibility. Buildings constructed before 1990 require special attention regarding the potential presence of hazardous materials. A prior diagnosis is essential to secure the construction site.
The load-bearing structure of older buildings must be rigorously assessed before any installation, as the weight of a new elevator imposes significant static loads on existing foundations.
Newer buildings often offer more adapted configurations but may present challenges related to sound insulation.6 °C, the thermal behavior of shaft materials is a factor to watch.
It is crucial to adapt anchoring techniques to the building materials encountered, whether they are reinforced concrete, hollow bricks, or metal structures. A thorough analysis helps prevent structural damage and ensures perfect integration of the equipment into the building volume.
Any project to install an elevator in an existing building strictly requires a building permit. The competent cantonal authorities, through the Office of Urban Planning in Geneva, are responsible for validating the conformity of your project.
It is recommended to consult the municipal services of Meyrin as early as the sketching phase to understand any local constraints related to land use planning and landscape integration.
Although the sources do not indicate specific heritage protection perimeters in the center of Meyrin, any modification impacting the exterior appearance of the building, such as creating an elevator shaft on the facade, may be subject to thorough review.
If your building has heritage value, strict aesthetic requirements may be imposed by the authorities. It is advisable to check whether your plot is included in a protected zone before finalizing your plans to adjust the design of the installation and avoid a costly administrative rejection.
Regarding financial aid in Meyrin, it is essential to inquire directly with the municipality about possible local grants related to energy, climate, or accessibility funds. The golden rule for any subsidy application is to submit your file before starting work.
An application submitted after the project has started is systematically rejected. It is therefore advisable to prepare your administrative file in advance.
In terms of taxation, installation or modernization work on an elevator in a rental or condominium building can often be deducted as maintenance or value-preserving expenses according to current Geneva legislation.
It is highly recommended to consult a tax advisor or your cantonal tax administration to confirm the eligibility of your investments. Keep all invoices and details of the work safe, as they will be required to justify your tax returns.
The schedule for an elevator installation is divided into several phases. The first step consists of technical design and obtaining the building permit, a phase that can last several months depending on the complexity of the file.
Once the permit is obtained, site preparation includes ordering the custom equipment, which often requires a manufacturing lead time before on-site delivery.
The execution of the work itself depends on seasonality and weather conditions, especially if external or roof-related interventions are planned.
Although the construction site is mainly indoors, temperature management, especially in winter with 54 frost days, is taken into account for certain masonry or sealing work related to the creation of the shaft.
Assembly, adjustment of safety systems, and technical inspections constitute the final phase before commissioning. Regular communication with the site manager allows monitoring the overall progress.
Avoid the common mistake of neglecting the initial structural diagnosis. Systematically check the strength of the load-bearing slabs before imagining a precise layout. Remember that the building permit is essential and that you should never start work without prior approval from the Office of Urban Planning.
Make sure to include induced costs, such as restoration work on landings or electrical network modifications.
Before requesting quotes, prepare your checklist : check accessibility for assemblers, list the exact number of stops desired, and specify your needs regarding cabin dimensions. Systematically request several comparative offers based on an identical technical description.
Verify that maintenance is included in the final offer to avoid hidden costs after installation. Finally, ensure that the chosen materials comply with current safety standards and are adapted to the standard of your building in Meyrin.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1214 Vernier · about 2.1 km
Garattoni ascenseurs Sàrl, based in Vernier, sells, installs, modernizes, maintains and repairs elevators according to its registered corporate purpose.
profil-emploi.com1220 Les Avanchets · about 2.8 km
Lana Rénovation is a Geneva-based company specializing in complete renovation, professional cleaning, janitorial services, and moving assistance.
lana-renovation.ch1242 Satigny · about 3.8 km
Losinger Marazzi is a general contractor specializing in the development of sustainable districts, renovation, and the construction of complex real estate projects in Switzerland.
losinger-marazzi.ch1205 Genève · about 6.4 km
Geneva-based specialist in scaffolding, elevation systems, construction elevators, and engineering solutions for the building industry.
marssal.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, any structural modification or significant change of equipment requires a building permit. You must contact the Office of Urban Planning in Geneva to validate your file.
Meyrin offers municipal grants through its energy, climate, and biodiversity funds. It is advisable to check the eligibility criteria before work begins.
Yes, the number of stops is one of the main cost factors. Each additional level requires technical adaptation specific to the structure.
The local climate, with its frost days, can impact exterior or masonry work. Planning outside the period of extreme cold is recommended.
Although not cited as a specific law here, it is essential for safety and sustainability. It should be compared when studying quotes.
Yes, in buildings built before 1990, the presence of hazardous materials is possible. A prior diagnosis is necessary before any drilling.
This is a common option for existing buildings. This modification requires a building permit and attention to landscape integration.
Source : ge.ch
Source : Guide Installations Solaires et Thermopompes - Canton de Genève