Groupe Thermo is a Swiss company specializing in the installation and maintenance of heating, plumbing, ventilation, and air conditioning systems.
groupe-thermo.chBathroom renovation · Monthey

Small project
CHF 12'700 – CHF 35'200
Typical project
CHF 17'200 – CHF 46'100
Large project
CHF 24'700 – CHF 64'400
Computed with our estimator for Monthey (regional factor included), standard finish. Only the project size changes.
In Monthey, located at 407 meters above sea level, the climate imposes specific constraints on housing.7 °C and about 64 frost days per year, sanitary installations are subject to significant thermal fluctuations.
A renovation becomes sensible when the room's thermal insulation is no longer sufficient, causing energy losses, or when wear and tear on seals and pipes threatens the building's integrity against moisture.
The timing for starting such work is crucial to minimize inconvenience. It is strongly recommended to avoid periods of extreme cold to ensure effective frost protection while pipes are exposed.
By planning your work during temperate seasons, you benefit from better conditions for drying sealing materials and optimal ventilation of the site, thus ensuring increased durability for your new sanitary equipment while preserving indoor thermal comfort.
The success of a bathroom renovation depends on the quality of the technical choices made. The water supplied by the commune of Monthey may have hardness characteristics impacting the choice of taps and surfaces. Favor limestone-resistant and easy-to-clean materials to avoid rapid degradation of your installations.
Installing a walk-in shower is a popular option, but it requires a prior check of the available drainage slope, a step often complex in older buildings.
There are different levels of quality that influence not only the design but also durability. Materials such as porcelain stoneware for floors and wall coverings offer high moisture resistance and low porosity, ideal for wet rooms.
Lighting and ventilation options must be considered beforehand: effective ventilation is essential to extract moisture generated by showers, thus avoiding mold growth.
It is essential to seek advice from local professionals to adapt these technical choices to the specifics of your home and ensure a long-lasting installation.
Monthey has a varied housing stock, whose technical requirements differ according to the construction era. For buildings dating from before 1990, particular vigilance is required regarding the potential presence of asbestos in tile adhesives, old floor tiles, or certain seals.
It is imperative to perform sampling before any demolition. The floor structure, often composed of wooden floors or thin screeds in older homes, requires expertise to support the weight of new equipment or ceramic shower trays.
In addition, piping networks must be systematically inspected during heavy renovation. In older buildings, drains may be made of cast iron, a material sensitive to corrosion that must be replaced with modern PVC to ensure tightness and prevent leaks.
Thermal insulation of cold walls facing the exterior must also be reinforced to avoid thermal bridges. By consulting original plans or carrying out soundings with professionals, you can anticipate risks linked to the obsolescence of hidden installations, thus ensuring the safety and durability of your renovation work.
Renovating a bathroom in Monthey is generally considered routine maintenance work, but it may require permits if the project modifies the structure, facades, or if it is a listed building.
Before any intervention, it is essential to inquire with the technical department of the commune of Monthey about local administrative procedures.
Urban planning rules may impose specific constraints depending on the zones, particularly if the exterior appearance is modified by the addition of windows or through-ventilation.
As part of your project, make sure to check if your home is subject to heritage protection rules. Even if no source confirms a particular status, caution dictates that you ask the commune to avoid any litigation. Compliance with electrical safety standards in wet rooms is also a strict legal obligation.
Ensure that every modification respects the safety volumes imposed for wet zones. A prior application allows for validating the compliance of your plans with communal requirements and avoids costly modifications after the start of work.
7 (170%). Although bathroom renovation is essentially an investment for personal comfort, it is important to note that certain maintenance work may be deductible from your taxable income.
However, rules vary, and it is advisable to consult a tax advisor or refer to the cantonal guidelines of Valais to confirm the eligibility of incurred costs.
Regarding financial aid, there are no universal specific subsidies for aesthetic bathroom renovation. If your project includes comprehensive energy efficiency measures (such as replacing heating or improving the building envelope's thermal insulation), support programs may be accessible under certain conditions.
The order of steps is imperative : you must absolutely submit your aid applications before starting the work. No aid will be granted for projects already completed. Keep all invoices and certificates of conformity carefully for your future tax declarations.
Bathroom renovation follows a rigorous sequential logic to ensure the quality of the final result. Generally, the work begins with the access protection phase and demolition, followed by the refurbishment of plumbing and electrical networks. These invisible steps are crucial in older buildings in Monthey.
The ideal period for this work is outside peak frost times, although indoor heating can compensate for outdoor temperatures. Generally, count on 2 to 4 weeks of construction without a usable bathroom, a duration that may vary depending on the complexity of your project and unforeseen issues encountered.
Once the networks are validated, the phase of installing partitions, tiling, and sanitary equipment can begin. The drying of screeds and liquid seals is a critical step that should not be rushed to avoid future infiltrations. The schedule must therefore incorporate these necessary drying times.
Coordinate the different trades, such as plumbers and electricians, to avoid unnecessary waiting times on the site. Precise planning with your contractor helps to optimize these deadlines and get your bathroom operational as quickly as possible.
To avoid disappointment, start by checking the condition of your existing plumbing before choosing your new equipment. Ensure that the drainage slope is sufficient if you plan to replace a bathtub with a walk-in shower. Never neglect the installation of controlled mechanical ventilation to limit ambient humidity.
Have several detailed comparative quotes drawn up by local companies before committing yourself. Check that each quote explicitly includes the management of construction waste and the protection of adjacent areas. Never start the work without having clarified the necessary communal authorizations.
Ensure that the schedule provides for realistic drying times for joints and screeds. Finally, always provide a financial margin for structural unforeseen issues inherent in old buildings.
Checklist : Have you checked for the absence of asbestos in old coverings? Is the electrical power sufficient for your new appliances? Are the water inlets accessible for future maintenance? Have you validated the tax coefficient and possible aid with your commune?
Do the craftsmen possess the necessary liability insurance?
No specific grant listed for this work. Maintenance tax deductions may still apply.
1870 Monthey · about 0 km
Groupe Thermo is a Swiss company specializing in the installation and maintenance of heating, plumbing, ventilation, and air conditioning systems.
groupe-thermo.ch1870 Monthey · about 0 km
RABO SA is a general contractor active in plastering, painting, tiling, and insulation works.
rabosa.ch1870 Monthey · about 0 km
ND Carrelage Sàrl is a Valais-based company specializing in the installation of tiles, earthenware, and the renovation of walk-in showers.
nd-carrelage.ch1870 Monthey · about 0 km
Valais-based company specializing in plumbing, roofing, tinsmithing, and heating systems including solar thermal and heat pumps.
parchet.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Generally, count on 2 to 4 weeks of construction without a usable bathroom. This duration varies depending on the complexity of the renovation and technical unforeseen issues.
Most interior renovations are free, but you must consult the technical services if you modify the structure or facades. Contact the commune to validate your specific case.
In Monthey, hard water requires choosing taps and walls that are easy to maintain. Favor smooth surfaces and equipment treated with anti-limescale coatings.
There is no aid for aesthetics alone, but programs may exist for energy efficiency. Submit any application before starting work.
Buildings before 1990 may contain asbestos in adhesives or tiles. It is advised to perform sampling and inspect cast iron drains.
This depends on the drainage slope available under your current floor. A technical check is essential to validate feasibility.
It is better to avoid extreme cold peaks to ensure frost protection of networks. Favor temperate seasons to facilitate work and drying.
Source : Informations sur l'eau potable, monthey.ch · estimate