Riedo clima SA Guin, succursale de Neuchâtel
2000 Neuchâtel · about 0 km
Riedo Clima AG provides comprehensive building services including heating, ventilation, and renewable energy systems.
riedoclima.chHome solar battery · Neuchâtel

Small project
CHF 4'000 – CHF 9'100
Typical project
CHF 7'200 – CHF 15'400
Large project
CHF 12'400 – CHF 25'400
Computed with our estimator for Neuchâtel (regional factor included), standard finish. Only the project size changes.
The city of Neuchâtel, certified as a 'Cité de l'énergie Gold', actively supports the local energy transition. With significant annual global solar radiation, installing a battery becomes relevant once your photovoltaic production consistently exceeds your daytime consumption.
By storing the surplus during the day, you limit your reliance on the power grid and make use of your system even after sunset.3 °C and a winter period where heating needs, measured at 2,866 Kj/year, remain substantial.
Planning this project helps smooth out household consumption throughout the year, particularly during the 51 average frost days recorded annually.
Timing is strategic : ideally, it is better to pair the addition of a battery with the initial installation of panels or during a comprehensive energy renovation. If you already have a system, check the technical compatibility of your inverter.
A battery is particularly useful if your consumption profile peaks in the evening, when solar production is zero. By investing in storage, you improve the profitability of your installation, especially as smart energy flow management becomes the standard for high-performance buildings in the canton.
The market offers various battery technologies, mainly based on lithium-iron-phosphate (LFP), known for its longevity and safety. Sizing is crucial: it should not be dictated by the power of your solar panels, but exclusively by your electricity consumption during hours without sun.
A battery that is too large will never be fully charged, unnecessarily increasing your initial investment without a proportional gain in return.
It is imperative to check compatibility with your current inverter: some models require hybrid inverters capable of managing solar input and battery charging/discharging simultaneously.
Modern systems offer smart management options that allow for controlling consumption based on weather forecasts or grid tariffs. Some high-end components include backup functions in case of power outages, ensuring continuity of domestic power supply for essential appliances.
When selecting, prioritize manufacturers that offer a performance guarantee over the lifespan of charge cycles. Remember that available space and thermal conditions in your utility room (ideally frost-free) will also influence the model choice, as temperature affects the chemical efficiency of storage cells.
Installing a battery in Neuchâtel takes place in a diverse real estate context, ranging from old buildings to recent constructions.
For buildings constructed before 1990, special vigilance is required during drilling or utility room setup: the presence of asbestos in adhesives or insulation is a possibility that must be assessed before any intervention.
The electrical network of older houses may also require a compliance check before connecting a modern storage system to handle charge and discharge flows.
Thermal insulation plays a key role in the durability of your system.5 °C. Installing the battery in a temperate room, protected from frost and strong temperature fluctuations, is essential. If your home is very old, ensure that existing wiring is in good condition and sized for the addition of electrical components.
For new builds, the challenge is often the aesthetic and ergonomic integration of the system into living spaces. In case of doubt about the structure or compliance, consult a qualified electrician who knows the cantonal standards and the specifics of local buildings to secure your installation for the long term.
In Neuchâtel, the procedure for solar installations and their associated systems is simplified. The notification procedure replaces the traditional building permit for installations on roofs in the building zone, provided they are sufficiently adapted and located outside protected zones.
You only need to make a simple notification to the competent municipal or cantonal authority, ideally about twenty days before the start of work. This timeframe is indicative, but ensures good coordination with local services.
If your building is listed or located in a protected zone, requirements may vary; always contact your municipality to confirm if your project requires additional specific steps.
The fact that the city holds the 'Cité de l'énergie Gold' label shows a political willingness to favor solar deployment, which generally facilitates the processing of applications. It is your responsibility to ensure that the installed equipment meets Swiss electrical safety standards.
In case of doubt, a quick verification with the municipal authority will avoid unnecessary administrative complications. Remember that this notification is a mandatory step before starting work, even if the procedure is lighter compared to a traditional building permit.
Tax-wise, the installation of a battery, as an investment aimed at saving energy, is tax-deductible. The fundamental rule is: expenses can be deducted during the invoicing year (year N). If this deduction results in a negative net income, the balance can be carried forward to the two following tax years (N+1 and N+2).
This carry-forward possibility is valuable for optimizing your tax burden over the medium term. It is crucial to note that these costs must be declared in full during the year they are invoiced to be eligible for carry-forward.
Be mindful of the choice between deducting actual costs and the flat-rate deduction (10% or 20% of the rental value depending on the building's age). If you choose to deduct actual costs to include your energy investment, you cannot apply the flat-rate deduction for the same property during that period.
The tax office will determine the carry-forward expenses automatically. We advise you to carefully keep all detailed invoices. Finally, if you own a commercial property, the rules differ.
Ensure you discuss with your fiduciary before starting work to guarantee that your energy investment is fully valued from a tax perspective.
A typical work schedule starts with a feasibility study and needs validation. Once the equipment is chosen and the quote accepted, the administrative step consists of submitting your notification to the competent authority about 20 days before the planned start of work.
Once the notification is processed, planning can be finalized. It is better to avoid periods of extreme cold, although installation indoors (garage or utility room) is technically possible all year round.
The 51 days of annual frost do not block the site, but an intervention during a milder period facilitates logistical work and connection.
The installation itself is relatively quick. It includes preparation of the support, battery installation, wiring to the existing or new inverter, and finally the software configuration of the management system.
After physical installation, a test phase is essential to check communication between the meter, inverter, and battery. A final commissioning allows for the configuration of optimized charge and discharge profiles.
Plan your work in consultation with your installer to ensure smooth coordination, especially if you need to coordinate multiple service providers on the house electrical network.
Avoid common mistakes by following this checklist before confirming your project: scrupulously check the technical compatibility between your current inverter and the future battery, as incompatibility can multiply costs unnecessarily.
Ensure your storage capacity is sized based on your nightly consumption habits and not the total power of your photovoltaic panels. Have the condition of your home's electrical network checked by a professional to ensure existing installations can support the load.
Do not forget to formally notify your project to local authorities at least twenty days before work begins to avoid any administrative stoppage. Ensure the battery's location is frost-free and well-ventilated to maximize cell lifespan.
Demand a clear demonstration of the monitoring system to manage your energy flows after commissioning. Finally, systematically ask for detailed invoices to facilitate your tax return and any potential energy deduction carry-forwards. These simple steps guarantee a serene and durable installation over time.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2000 Neuchâtel · about 0 km
Riedo Clima AG provides comprehensive building services including heating, ventilation, and renewable energy systems.
riedoclima.ch2000 Neuchâtel · about 0 km
JENOSA SA is a Swiss company that finances, acquires, and operates photovoltaic power plants, battery storage systems, and heat production facilities.
jenosa.ch2000 Neuchâtel · about 0 km
Based in Neuchatel, Capner Switzerland installs renewable energy solutions including photovoltaics, heat pumps, and battery storage systems.
capner.ch2000 Neuchâtel · about 0 km
ACCOM électricité-télématique Sàrl is a company specializing in electrical installations, telecommunication solutions, and photovoltaic projects.
accom-electro.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Most current lithium batteries last between 10 and 15 years. Their performance gradually decreases after several thousand charge cycles.
The electrical installation must be performed by a qualified professional. This ensures compliance with Swiss safety standards and validates manufacturer warranties.
This depends on the chosen model; only certain systems equipped with backup functions allow for powering your devices during a grid outage.
Maintenance is minimal, limited to checking the monitoring system and connections once a year. The systems are generally autonomous and self-managed.
If the battery is installed in a protected and temperate location, it will suffer no damage. You must absolutely avoid direct installation in a frost-exposed room.
No, no aid is automatic. Tax deduction is obtained via your tax return, based on your invoices and your individual tax situation.
The ideal capacity corresponds to your nightly electricity consumption. An installer can analyze your consumption data to avoid unnecessary oversizing.
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · estimate
Source : Ville de Neuchâtel
Source : SCCO_I772_Notice4_PP.pdf