The success of a kitchen renovation depends on rigorous scheduling of the steps. The schedule begins with the design phase and the validation of quotes.
It is preferable to avoid scheduling the heaviest work, especially those requiring opening windows or laying materials sensitive to humidity, during periods of extreme cold.
With about 57 frost days per year in Porrentruy, planning the main construction outside these periods reduces the risks related to freezing temperatures. Coordination between different trades, from plumber to electrician, is the key factor to minimize disruptions in your daily life.
Work usually begins with the removal of the old kitchen, followed by network modifications if necessary. Once these installations are verified, new cabinets are installed, followed by worktops and appliances. Finally, finishes, painting, and adjustments are carried out.
The total duration of the construction site will depend on the scale of the work. It is essential to anticipate lead times for ordering materials. Careful preparation upfront limits the period of unavailability of your kitchen, thus avoiding unnecessary inconvenience during your daily life.