Marssal SA
1205 Genève · about 0.8 km
Geneva-based specialist in scaffolding, elevation systems, construction elevators, and engineering solutions for the building industry.
marssal.chElevator installation or upgrade · Genève

Small project
CHF 51'000 – CHF 126'000
Typical project
CHF 63'800 – CHF 157'500
Large project
CHF 89'300 – CHF 220'600
Computed with our estimator for Genève (regional factor included), standard finish. Only the project size changes.
The decision to install or modernize an elevator often responds to comfort and real estate appreciation requirements.7°C and an altitude of 374 meters, the building stock faces varied climatic conditions including about 50 frost days per year.
These thermal variations stress infrastructure, including exterior elevators or systems located in non-insulated shafts.
Anticipating the work ensures the building's durability.7°C, equipment reliability becomes essential for residents.
Modernizing an obsolete elevator not only reduces frequent breakdowns but also adapts the building to changing occupant needs, thus ensuring the preservation of the property's value in the demanding Genève market.
The elevator project relies on structuring technical choices. The number of stops and the potential creation of a shaft are the main cost factors. First, the stairwell configuration or the feasibility of installing a self-supporting facade structure must be evaluated.
Finishing materials, from standard steel cabins to custom designs with mirrors and LED lighting, also influence the final budget.
The chosen technology, hydraulic or electric, depends on the building's geometry and usage. Cab speed, door type (swing or sliding), and emergency system presence are options to define with your installer.
It is crucial to compare offers by mandatorily including the annual maintenance contract, which ensures the machine's technical monitoring. A well-dimensioned project from the start avoids extra costs due to unforeseen adaptations during implementation.
The building stock in Genève is diverse, ranging from old buildings in the city center to more recent constructions. For buildings constructed before 1990, particular vigilance is required regarding the potential presence of asbestos in old shaft linings or insulation.
Before any drilling or breakthrough for a new installation, an asbestos diagnostic is often necessary to guarantee the safety of workers and occupants.
The building's load-bearing structure is another critical point. In historical buildings or older masonry, integrating an elevator may require structural reinforcement to support new mechanical loads. It is recommended to consult original plans to identify existing pipe networks.
If the building is in a protected zone, the shaft integration must respect a sober aesthetic to avoid distorting the original architecture. Each project must therefore undergo a rigorous technical analysis adapted to the building's constructive reality.
In Genève, any structural change aimed at the installation or modernization of an elevator, particularly if it involves creating a shaft, requires a building permit. This procedure is under the supervision of the Office de l'urbanisme.
In protected sectors, such as those subject to heritage inventories or located in historical zones, aesthetic requirements are stricter. You must ensure that exterior changes do not alter the building's visual or historical appearance.
For buildings registered in the inventory or located in sensitive perimeters, it is essential to contact the Office de l'urbanisme before submitting the file. Compliance with zoning laws is a mandatory prerequisite.
If your building is located in the Old Town or in the southern sector of the former fortifications, expect a detailed review of your project. Always take the time to check with your municipality for additional local specificities that might apply to your street or neighborhood.
There is no systematic public aid for private elevator installation in Genève. Nevertheless, it is advisable to inquire with your municipality to see if specific local accessibility support programs exist.
Regarding taxation, renovation and transformation works may, under certain conditions, be deductible from your taxable income. It is recommended to consult a tax advisor to precisely evaluate the impact of these works on your tax return.
The golden rule for any aid application remains anticipation : the request must mandatorily be submitted and validated before the work begins. No retroactive aid is granted for construction sites already underway.
Carefully keep all payment receipts and detailed invoices, as they form the basis for your requests for potential tax benefits. Transparency in preparing the file is the guarantee of a quick review by the concerned authorities.
An elevator project follows a precise chronology, from design to commissioning. The preliminary phase includes technical studies and submitting the building permit application to the competent authorities. Once the authorization is obtained, ordering components, often custom-made, takes place.
The construction phase begins with site preparation, including structural work if a new shaft is created.
7°C. Internal implementation is less sensitive to external conditions, but logistics remain crucial. Final steps include mechanical installation, electrical connection, and mandatory safety tests before acceptance.
Expect a significant total duration including review times and equipment manufacturing, while ensuring smooth coordination between the different trades involved in the project.
To avoid disappointment, ensure you have precisely defined your needs regarding the number of stops and load capacity. Never neglect including the annual maintenance contract in your comparison of offers.
An elevator added to an existing building requires a building permit; never start work without this precious document. Check the condition of your stairwell and the potential presence of hazardous materials like asbestos before soliciting companies.
Here is a checklist to prepare your quotes : - Gather your building's plans showing potential locations. - Check if your building is subject to heritage protection rules. - List your specific needs in terms of accessibility for people with reduced mobility.
- Request at least three comparable offers including installation and maintenance. - Ensure each offer clearly details the required structural work. - Verify the reputation of local installers and their after-sales service capacity. - Establish a budget including a margin for technical unforeseen events.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1205 Genève · about 0.8 km
Geneva-based specialist in scaffolding, elevation systems, construction elevators, and engineering solutions for the building industry.
marssal.ch1220 Les Avanchets · about 3.5 km
Lana Rénovation is a Geneva-based company specializing in complete renovation, professional cleaning, janitorial services, and moving assistance.
lana-renovation.ch1226 Thônex · about 4.6 km
Geneva-based waterproofing specialist focused on leak detection, balcony renovation, bituminous roofing, and resin tanking for underground structures.
systemetanche.ch1228 Plan-les-Ouates · about 4.7 km
Specialist in leasing and installing goods lifts, construction elevators, and work platforms for building and renovation projects.
elevatex.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
It is possible in most cases, but requires a thorough structural study. The building's configuration often dictates technical feasibility.
Deadlines depend on the project's complexity and the area concerned. It is advisable to plan for several months before the site starts.
Modernization improves safety, reduces energy consumption, and increases your building's value. It also extends equipment lifespan.
Yes, the maintenance contract is mandatory and essential to ensure proper operation. It must be compared during your quote requests.
If the modernization affects structure or safety, authorization is required. Contact the Office de l'urbanisme to confirm your need.
The presence of asbestos imposes strict safety measures but does not necessarily block the project. Specialized treatment will simply be integrated into the construction.
Yes, it is a common solution, especially if interior space is limited. This option remains subject to strict building permits.
Source : ge.ch
Source : Guide Installations Solaires et Thermopompes - Canton de Genève