Solar water heating · Renens

Optimizing your heating: Solar thermal energy in Renens

The city of Renens, firmly committed to carbon neutrality by 2050, encourages homeowners to enhance their properties with sustainable solutions. Installing solar thermal systems is a concrete opportunity to reduce your energy consumption and meet the goals of the municipal Climate Plan.
Solar water heating – Renens

Worked examples in Renens

Small project

CHF 10'100 – CHF 23'600

Typical project

CHF 13'000 – CHF 30'200

Large project

CHF 17'800 – CHF 41'000

Computed with our estimator for Renens (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'400 (40 %)
  • Materials : CHF 10'500 (50 %)
  • Other costs : CHF 2'100 (10 %)

Why and when to undertake these works in Renens

With an altitude of 420 meters and a favorable global irradiation of 1371 kWh/m²/year, the Renens area benefits from sunshine suitable for solar installations.

The decision to undertake thermal renovation fits perfectly with the municipality's strategy, which holds the 'Energy City Gold' label, aiming for a drastic reduction in greenhouse gas emissions and an increased share of local renewable energy.

Heating needs, illustrated by 2758 degree-days, demonstrate the importance of improving the building's energy efficiency.

The ideal time to install a solar thermal system is when replacing your boiler or during a comprehensive roof renovation. By planning these works, you anticipate future energy requirements while contributing to the goals of the municipal Climate Plan.

Taking action now helps limit costs by bundling interventions and allows you to enjoy increased thermal comfort during the frost periods, which total an average of 48 days per year in Renens.

Technical choices that influence the project

Sizing a solar thermal installation depends on your domestic hot water consumption and heating requirements. Solar thermal collectors generally cover a large part of the hot water demand in summer, making the investment particularly relevant as a complement to a conventional system.

The choice between flat-plate and vacuum-tube collectors is crucial: the former are robust and suitable for most roofs, while the latter offer higher efficiency in cold or diffuse weather conditions.

Integrating a solar system with a heat pump requires a rigorous sizing study. This hybrid approach optimizes energy production based on external conditions. In addition, the choice of the storage tank, its capacity, and its thermal insulation are determining factors for overall performance.

Talking to a professional helps define the ideal configuration that best suits your building's typology while ensuring optimal longevity for your energy installation.

Specifics of the local building stock and typical risks

Renens has a varied building stock, ranging from old constructions to more recent buildings. For any renovation involving the roof, it is essential to check the condition of the framework and insulation before considering the installation of collectors.

Buildings dating from before 1990 may present risks related to the presence of asbestos in building materials. A preliminary diagnosis makes it possible to identify these substances and secure the site appropriately, guaranteeing the health of occupants and workers.

Furthermore, the match between the existing heat distribution network and the solar installation is a major point of vigilance. An aging hydraulic system might require an overhaul before integrating a high-performance solar solution.

Assessing the overall thermal insulation of your home remains an essential step so that solar energy is not lost through thermal bridges or excessive heat loss. A professional can audit your installation to ensure that the project is technically consistent with the structure of your building in Renens.

Authorizations, rules and heritage in Renens

Regarding authorizations, the Canton of Vaud greatly simplifies the procedures. For the installation of solar panels, you are generally subject to the simplified building permit procedure (exemption from building permit).

This rule applies widely, unless your building is protected, located in a protected zone, or if the work results in a major change in the external appearance or dimensions. However, it is recommended to always contact the technical services of the municipality of Renens to confirm the specific situation of your plot.

In case of doubt, or if your home is located in an area of heritage importance, the municipal authorities can guide you through the necessary steps to respect local aesthetic constraints. Although the procedure is simplified, a prior administrative check is a safety guarantee to avoid any future litigation.

Do not forget that the municipality's objective is to promote the energy transition while preserving the architectural quality of the urban fabric, in accordance with its Climate Plan.

Financial aid and taxation

To reduce the cost of your work, the Building Program (VD) offers grants for solar thermal installations, intended for domestic hot water or heating support. The contribution can be a flat rate or calculated per square meter of installed collectors.

It is mandatory to submit your grant application before starting work, as no project started can receive aid retrospectively. Check the official website for technical details and current criteria.

Tax-wise, the canton allows the deduction of investments intended to save energy. The deduction rate for these expenses is 100%. If the costs cannot be fully taken into account in the year of the investment, the balance can be carried forward to the two following tax periods.

You must choose between deducting effective costs or a flat rate for each property. Note that if you receive public grants, only the portion remaining at your expense is deductible. These incentives facilitate the realization of high-performance projects in Renens.

Calendar: typical flow of the project

The implementation of a solar thermal project in Renens follows a structured process to guarantee the quality of the work. The first phase consists of the feasibility study, including the analysis of sunshine and the audit of the existing heating system.

Once the quotes are validated and the grant applications submitted, materials can be ordered. It is better to prefer milder seasons, although frost is not a major obstacle once the roof work is secured.

The installation itself takes place in several stages : setting up anchors, installing solar collectors, hydraulic connection to the technical room, and integration into the storage system. A testing and commissioning phase is then necessary to verify tightness and correct heat transfer.

Good site monitoring, carried out by competent professionals, ensures execution in accordance with standards. By anticipating administrative deadlines, you ensure a smooth deployment of your project before the cold season.

Common errors to avoid and checklist

Avoid at all costs neglecting the structural condition of your roof before planning an installation. Never start work before receiving a positive response or at least submitting your grant application.

It is also risky to underestimate the importance of a comprehensive thermal study, as an oversized or undersized installation loses efficiency.

Before requesting quotes, check the following : Is my heating system compatible with a solar extension? Is the roof free of asbestos or materials requiring asbestos removal? Have municipal authorizations been checked with the competent service? Have I identified a certified company for installation?

Have I consulted the Building Program conditions? Rigorous preparation is the key to success. Make sure the installer offers a maintenance contract to ensure the durability of your thermal system in the long term.

Grants and subsidies

Canton

Solar thermal — Buildings Programme (VD)

Flat contribution or per m² of collectors.

Grants for solar thermal systems (hot water, heating support).

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Companies in the area

Chauffage-tech, Mustieles

1020 Renens VD · about 0 km

Chauffage-tech is a company specializing in the installation of heating, ventilation, air conditioning systems, and solar solutions.

technibat-chauffage.ch

Roger Gremper SA

1004 Lausanne · about 2.3 km

Lausanne specialist in sanitary installations, roofing, tinsmithing, and skylight installation for building renovations since 1934.

grempersa.ch

IPSA Isolations SA

1024 Ecublens VD · about 2.5 km

Specialist in technical insulation for heating, plumbing, and ventilation systems, providing thermal, acoustic, and fire protection solutions.

ipsa-isolations.ch

Garcia Sanitaires-chauffage Sàrl

1023 Crissier · about 2.6 km

Garcia Sanitaires-chauffage Sàrl designs, installs and maintains plumbing, heating and ventilation systems, including heat pumps and solar thermal installations.

garcia-sarl.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

What is the average lifespan of an installation?

A well-maintained solar thermal installation can operate for 20 to 25 years. Regular maintenance is essential to ensure this longevity.

Does the system work in winter?

Yes, the system captures radiation even in winter, although its yield is lower. It then serves as a supplement to the main heating system.

Can I install panels myself?

It is highly recommended to hire a qualified professional. This ensures safety, efficiency, and eligibility for grants.

Do I need a building permit in Renens?

The simplified procedure is the norm, unless the building is protected. It is best to check with the municipality to confirm.

Can grants be combined?

Grants depend on the Building Program (VD). It is advisable to check each specific program for cumulation conditions.

What is the 100% tax deduction?

This allows you to deduct the entire investment costs for energy-saving measures from your taxable income.

Is the installation noisy?

No, a solar thermal installation is completely silent. Only the circulation pumps may emit a very slight hum.

Useful local data

Estimated solar yield — 1'206 kWh/kWc/an (toit ~30° sud, PR 0.8, estimation)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · estimate

Altitude — 420 m

Source : swisstopo – service d'altitude (MNT)

Heating degree days — 2'758 Kj/an (20/12 °C)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Frost days — 48 jours/an

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Solar irradiation — 1'371 kWh/m²/an (horizontal)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Winter design temperature — -4.5 °C (1er percentile des minimales)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Mean temperature — 11.6 °C

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Energy policy

  • Note : La commune vise la neutralité carbone à l'horizon 2050 pour les émissions produites sur son territoire. Le Plan Climat est un instrument stratégique, transversal et opérationnel, composé d'une stratégie (vision et objectifs jusqu'à 2050) et d'un plan d'actions (projets 2023-2027), structuré en 8 thématiques avec plus de 170 actions. Le Plan Climat sera revu tous les 5 ans. Réaudit Cité de l'énergie Gold prévu en été 2023.
  • Targets : Neutralité carbone des émissions territoriales à l’horizon 2050. Adapter le territoire aux effets des changements climatiques. Réduction au maximum des émissions extraterritoriales. Réduire drastiquement les émissions de gaz à effet de serre. Objectifs spécifiques pour la chaleur (ex: 30% de consommation d'énergie finale par habitant d'ici 2035 par rapport à 2015, +51% de part d'énergie renouvelable locale dans l'approvisionnement en chaleur d'ici à 2035), électricité (ex: -14% de consommation d'électricité par habitant d'ici 2035 par rapport à 2015, +21% de part d'énergie renouvelable locale), et mobilité (ex: 61% de distances parcourues en transport individuel motorisé en 2030, 50% de véhicules nouvellement immatriculés sont électriques ou hybrides rechargeables en 2025).
  • Climate plan : Plan Climat communal
  • Label : Cité de l'énergie Gold

Source : Alliance pour le climat Suisse - Profil Renens 2023

PermitsCanton

  • Competent authority : municipalité ou préfet
  • Solar panels : Soumis à la procédure simplifiée ou dispense de permis de construire
  • Heat pump : Soumis à la procédure simplifiée ou dispense de permis de construire. Pour les pompes à chaleur air-eau ou air-air, les nuisances sonores sont prises en compte.
  • Procedure : procédure simplifiée de permis de construire (dispense de permis de construire)
  • Windows and facades : Soumis à la procédure simplifiée ou dispense de permis de construire, sauf si le bâtiment est protégé ou situé dans une zone protégée, ou si les travaux entraînent un changement d'affectation, d'aspect extérieur ou de gabarit important.

Source : Canton de Fribourg: Permis de construire (example, this is Fribourg) · estimate

Tax deductionsCanton

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Renens

Solar water heating in nearby towns