Eco6therm Sàrl
2832 Rebeuvelier · about 49.1 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Aarau

At a glance
Small project
CHF 4'000 – CHF 9'100
Typical project
CHF 7'200 – CHF 15'400
Large project
CHF 12'400 – CHF 25'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'000 | CHF 9'100 | CHF 1'200 |
| Typical project | 10 kWh | CHF 7'200 | CHF 15'400 | CHF 1'100 |
| Large project | 18 kWh | CHF 12'400 | CHF 25'400 | CHF 1'000 |
Computed with our estimator for Aarau (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Aarau, the federal building register lists 3'585 residential buildings and 11'819 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
71 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
43 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 43 % | 22.7 % |
| Heating oil | 20 % | 10.3 % |
| District heating | 6 % | 2.9 % |
| Heat pump | 27 % | 18 % |
| Electricity | 2 % | 44.2 % |
| Wood | 2 % | 0.9 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
12.4 % of buildings mix housing with shops or offices.
For your renovation plans in Aarau, federal building register figures are vital. With 467 buildings under heritage protection, it is crucial to contact the municipality early to address permit requirements. The median house volume is 800 m3, which serves as a key indicator for scaling insulation or heating upgrades. Please note that data coverage regarding volume is partial, as only 20 houses were measured according to the SIA 416 standard. We recommend verifying the precise dimensions of your specific property before starting any works to ensure your renovation budget remains accurate and effective for your project.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 49.1 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 61.2 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2718 Lajoux JU · about 70.4 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.ch2605 Sonceboz-Sombeval · about 70.4 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.