Heat pump installation · Baar

Heat pump installation in Baar

Indicative price, tips, grants and companies for your project in Baar (Zug).
Heat pump installation – Baar

At a glance

Typical budget
CHF 36'700 – CHF 68'300
Midpoint
CHF 51'300
Grants found
0
Nearby companies
4

Worked examples in Baar

Small project

CHF 29'100 – CHF 53'200

Typical project

CHF 36'700 – CHF 68'300

Large project

CHF 48'100 – CHF 91'100

ProjectQuantityLowHigh
Small project80 m²CHF 29'100CHF 53'200
Typical project160 m²CHF 36'700CHF 68'300
Large project280 m²CHF 48'100CHF 91'100

Computed with our estimator for Baar (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 20'500 (40 %)
  • Materials : CHF 25'700 (50 %)
  • Other costs : CHF 5'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Baar's housing stock in figures

In Baar, the federal building register lists 2'570 residential buildings and 11'662 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

49 %built before 1980
69 %heated by oil or gas
26.1 %electric hot water
3.2 %with declared solar thermal

Age of residential buildings

49 % built before 1980

  • Before 191910 %
  • 1919–19456 %
  • 1946–19608 %
  • 1961–197013 %
  • 1971–198012 %
  • 1981–199011 %
  • 1991–200012 %
  • 2001–201013 %
  • Since 201114 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

41 % · Heating oil

  • Heating oil41 %
  • Gas28 %
  • Heat pump21 %
  • Wood6 %
  • Electricity3 %
  • District heating1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas28 %20.8 %
Heating oil41 %35.6 %
District heating1 %0.4 %
Heat pump21 %10.3 %
Electricity3 %26.1 %
Wood6 %4 %
Solar thermal0 %2.3 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)73.1 %
  • Heat pump21.2 %
  • Central electric heating2.1 %
  • Condensing boiler1.3 %
  • Stove0.9 %
  • Direct electric heaters0.7 %
  • Heat exchanger (district)0.5 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For renovation projects in Baar, the official building register provides essential insights. Regarding heritage protection, 808 buildings are classified as protected out of 939 known cases, making early consultation with municipal authorities vital for your permit process. The median house volume is 1719 m3, which helps determine the scale for heating and insulation upgrades. Please be aware that these volume figures are based on only 10 units measured via the SIA 416 standard. Consequently, the data coverage is partial, and homeowners should consider these limitations when planning renovation budgets or assessing technical requirements for their specific property.

808
buildings flagged as protected
status known for 939 of 2'570 buildings; check with the municipality
1'719 m³
median house volume (SIA 416)
measured for 10 of 946 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Hallenbarter & Russi Gebäudetechnik AG

3988 Obergoms · about 80.8 km

Obergoms-based company specializing in sanitary installations, heating systems, roofing, and tinsmith work for new builds and renovations.

hallenbarter-russi.ch

F. Imeri Sàrl

2829 Vermes · about 81.5 km

The website presented under the name Imeri Chauffage et Sanitaire Sàrl offers plumbing, heating and solar thermal work, while F. Imeri Sàrl’s registered purpose refers to a scrap metal business.

imeri-sarl.ch

Sanit & Bilat Fils S.A.

2824 Vicques · about 86.4 km

Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.

sanit.ch

Buchwalder Sàrl

2824 Vicques · about 86.4 km

Buchwalder Sàrl in Vicques has specialized in the installation, repair, and renovation of heating and sanitary systems since 1966.

buchwalder-sarl.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Baar

Other works in Baar

Heat pump installation in nearby towns