Heat pump installation · Baden

Heat pump installation in Baden

Indicative price, tips, grants and companies for your project in Baden (Aargau).
Heat pump installation – Baden

At a glance

Typical budget
CHF 37'800 – CHF 70'500
Midpoint
CHF 52'900
Grants found
0
Nearby companies
4

Worked examples in Baden

Small project

CHF 30'000 – CHF 54'800

Typical project

CHF 37'800 – CHF 70'500

Large project

CHF 49'600 – CHF 93'900

ProjectQuantityLowHigh
Small project80 m²CHF 30'000CHF 54'800
Typical project160 m²CHF 37'800CHF 70'500
Large project280 m²CHF 49'600CHF 93'900

Computed with our estimator for Baden (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'200 (40 %)
  • Materials : CHF 26'500 (50 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Baden's housing stock in figures

In Baden, the federal building register lists 3'478 residential buildings and 12'141 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

59 %built before 1980
63 %heated by oil or gas
31.1 %electric hot water
1.7 %with declared solar thermal

Age of residential buildings

59 % built before 1980

  • Before 191911 %
  • 1919–194517 %
  • 1946–196011 %
  • 1961–19708 %
  • 1971–198012 %
  • 1981–199015 %
  • 1991–200010 %
  • 2001–201010 %
  • Since 20116 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

42 % · Gas

  • Gas42 %
  • Heating oil21 %
  • Heat pump18 %
  • District heating15 %
  • Electricity3 %
  • Wood1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas42 %30 %
Heating oil21 %17.1 %
District heating15 %11.8 %
Heat pump18 %7.2 %
Electricity3 %31.1 %
Wood1 %0.8 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)63.4 %
  • Heat pump18.4 %
  • Heat exchanger (district)15 %
  • Central electric heating2.4 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For renovation planning in Baden, official building register data reveals that 631 out of 3478 buildings are under heritage protection. If your property is classified, contact municipal authorities early, as specific permits will be required. Regarding the scale of heating or insulation work, the median volume for 2064 residential buildings is 849 m3. Please note that data coverage is partial, as this volume represents standard SIA 416 measurements for only 3 properties, while the vast majority of buildings are recorded under other or unknown standards. This information is essential to assess the scope of your future renovation project accurately.

631
buildings flagged as protected
status known for 3'478 of 3'478 buildings; check with the municipality
849 m³
median house volume (SIA 416)
measured for 3 of 2'064 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

F. Imeri Sàrl

2829 Vermes · about 63 km

The website presented under the name Imeri Chauffage et Sanitaire Sàrl offers plumbing, heating and solar thermal work, while F. Imeri Sàrl’s registered purpose refers to a scrap metal business.

imeri-sarl.ch

Buchwalder Sàrl

2824 Vicques · about 66.4 km

Buchwalder Sàrl in Vicques has specialized in the installation, repair, and renovation of heating and sanitary systems since 1966.

buchwalder-sarl.ch

Sanit & Bilat Fils S.A.

2824 Vicques · about 66.4 km

Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.

sanit.ch

Gyger Haustechnik

2824 Vicques · about 66.4 km

Gyger Haustechnik specializes in sanitary installations, heating systems, bathroom renovations, and tiling work.

gyger-co.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Baden

Other works in Baden

Heat pump installation in nearby towns