Home solar battery · Binningen

Home solar battery in Binningen

Indicative price, tips, grants and companies for your project in Binningen (Basel-Country).
Home solar battery – Binningen

At a glance

Typical budget
CHF 7'600 – CHF 16'100
Midpoint
CHF 11'000
Grants found
0
Nearby companies
4

Worked examples in Binningen

Small project

CHF 4'200 – CHF 9'500

Typical project

CHF 7'600 – CHF 16'100

Large project

CHF 13'000 – CHF 26'700

ProjectQuantityLowHigh
Small project5 kWhCHF 4'200CHF 9'500
Typical project10 kWhCHF 7'600CHF 16'100
Large project18 kWhCHF 13'000CHF 26'700

Computed with our estimator for Binningen (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'200 (20 %)
  • Materials : CHF 7'700 (70 %)
  • Other costs : CHF 1'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Binningen's housing stock in figures

In Binningen, the federal building register lists 2'859 residential buildings and 8'579 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

67 %built before 1980
75 %heated by oil or gas
11.7 %electric hot water
6.4 %with declared solar thermal

Age of residential buildings

67 % built before 1980

  • Before 191911 %
  • 1919–194513 %
  • 1946–196016 %
  • 1961–197013 %
  • 1971–198014 %
  • 1981–19908 %
  • 1991–20006 %
  • 2001–20108 %
  • Since 201111 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

57 % · Gas

  • Gas57 %
  • Heating oil18 %
  • Heat pump14 %
  • District heating9 %
  • Electricity1 %
  • Wood1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas57 %49.1 %
Heating oil18 %10.4 %
District heating9 %9.1 %
Heat pump14 %12.7 %
Electricity1 %11.7 %
Wood1 %0.4 %
Solar thermal0 %6.4 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)76.2 %
  • Heat pump13.7 %
  • Heat exchanger (district)9.4 %
  • Central electric heating0.7 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses62.6 %
  • Two-dwelling houses6.8 %
  • Apartment buildings (3+)30.6 %

6.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
127 m²
median dwelling area
90 m²

Renovations, heritage and volumes

For homeowners in Binningen, official records show that 859 buildings are subject to heritage protection, making it essential to contact the municipality early to navigate permit requirements. Regarding house volume, data coverage is currently partial, with only 52 of 1790 houses measured according to the SIA 416 standard, showing a median volume of 1023 m3. These figures are vital for planning the scale of potential insulation or heating system upgrades. Since no renovation year data is recorded for the properties, a professional on-site assessment remains the most reliable way to accurately determine your specific project requirements.

859
buildings flagged as protected
status known for 2'859 of 2'859 buildings; check with the municipality
1'023 m³
median house volume (SIA 416)
measured for 52 of 1'790 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Eco6therm Sàrl

2832 Rebeuvelier · about 26.5 km

Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.

eco6therm.ch

TELEC Renggli S.A. (Télécommunications, Electricité et Commerce)

2735 Malleray · about 39.1 km

Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.

telecrengglisa.ch

HyperSolaire Sàrl

2718 Lajoux JU · about 42.7 km

Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.

hypersolaire.ch

Solar conseil Sàrl

2605 Sonceboz-Sombeval · about 48.5 km

Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.

solarconseil.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Binningen

Other works in Binningen

Home solar battery in nearby towns