Eco6therm Sàrl
2832 Rebeuvelier · about 26.5 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Binningen

At a glance
Small project
CHF 4'200 – CHF 9'500
Typical project
CHF 7'600 – CHF 16'100
Large project
CHF 13'000 – CHF 26'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'200 | CHF 9'500 | CHF 1'300 |
| Typical project | 10 kWh | CHF 7'600 | CHF 16'100 | CHF 1'100 |
| Large project | 18 kWh | CHF 13'000 | CHF 26'700 | CHF 1'000 |
Computed with our estimator for Binningen (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Binningen, the federal building register lists 2'859 residential buildings and 8'579 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
67 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
57 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 57 % | 49.1 % |
| Heating oil | 18 % | 10.4 % |
| District heating | 9 % | 9.1 % |
| Heat pump | 14 % | 12.7 % |
| Electricity | 1 % | 11.7 % |
| Wood | 1 % | 0.4 % |
| Solar thermal | 0 % | 6.4 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
6.9 % of buildings mix housing with shops or offices.
For homeowners in Binningen, official records show that 859 buildings are subject to heritage protection, making it essential to contact the municipality early to navigate permit requirements. Regarding house volume, data coverage is currently partial, with only 52 of 1790 houses measured according to the SIA 416 standard, showing a median volume of 1023 m3. These figures are vital for planning the scale of potential insulation or heating system upgrades. Since no renovation year data is recorded for the properties, a professional on-site assessment remains the most reliable way to accurately determine your specific project requirements.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 26.5 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 39.1 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2718 Lajoux JU · about 42.7 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.ch2605 Sonceboz-Sombeval · about 48.5 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.