Solar water heating · Confignon

Solar water heating in Confignon

Indicative price, tips, grants and companies for your project in Confignon (Geneva).
Solar water heating – Confignon

At a glance

Typical budget
CHF 13'000 – CHF 30'200
Midpoint
CHF 20'900
Grants found
1
Nearby companies
4

Worked examples in Confignon

Small project

CHF 10'100 – CHF 23'600

Typical project

CHF 13'000 – CHF 30'200

Large project

CHF 17'800 – CHF 41'000

ProjectQuantityLowHigh
Small project3 m²CHF 10'100CHF 23'600
Typical project6 m²CHF 13'000CHF 30'200
Large project11 m²CHF 17'800CHF 41'000

Computed with our estimator for Confignon (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'400 (40 %)
  • Materials : CHF 10'500 (50 %)
  • Other costs : CHF 2'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Collectors, controls, standard connection and tank according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Roof refurbishment and replacement of main heating

Tips before you start

  • Solar thermal collectors usually cover much of summer hot water.
  • Combining collectors with a heat pump needs a sizing study.
  • Several cantons subsidise collectors per m² or per installation.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar thermal — Geneva

Depending on system sizing.

Geneva support for solar hot water production.

www.ge.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Confignon's housing stock in figures

The federal building register lists 802 residential buildings with 1'853 dwellings in Confignon. 50% were built before 1980, before serious insulation standards, and 69% are still heated with oil or gas.

Only 10.6% of residential buildings in Confignon report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

50 %built before 1980
69 %heated by oil or gas
7.4 %electric hot water
10.6 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–19455 %
  • 1946–19607 %
  • 1961–197017 %
  • 1971–198011 %
  • 1981–199014 %
  • 1991–200014 %
  • 2001–201013 %
  • Since 201110 %

Main heating energy

  • Gas39 %
  • Heating oil30 %
  • Heat pump18 %
  • District heating7 %
  • Electricity3 %
  • Wood2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas39 %34.7 %
Heating oil30 %28.6 %
District heating7 %6.5 %
Heat pump18 %3 %
Electricity3 %7.4 %
Wood2 %1.7 %
Solar thermal0 %10.1 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)63.3 %
  • Heat pump18 %
  • Heat exchanger (district)7.4 %
  • Condensing boiler3.9 %
  • Standard boiler3.7 %
  • Direct electric heaters1.7 %
  • Central electric heating1.5 %
  • Stove0.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses74.2 %
  • Two-dwelling houses4.2 %
  • Apartment buildings (3+)21.6 %

5.6 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
116 m²
median dwelling area
110 m²

Renovations, heritage and volumes

For homeowners planning renovations in Confignon, please be aware that current data coverage from the official building register is partial. With 802 total buildings recorded, key metrics such as the renovation year, heritage protection status, and building volumes based on the SIA 416 standard are currently unavailable or not measured. Because these official figures are missing, we strongly advise you to contact the municipality directly before starting any major energy efficiency or structural work. Consulting local authorities early will help you clarify specific property requirements and ensure your renovation project proceeds smoothly despite the current data limitations.

0
buildings flagged as protected
status known for 24 of 802 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

SERVICES PLUS ENERGIES SA

1233 Bernex · about 1.6 km

Geneva-based company specializing in heating, ventilation, and air conditioning, active in energy renovation, solar thermal, and 24/7 maintenance.

spenergies.ch

Alliance Energie Sàrl

1258 Perly · about 1.9 km

Alliance Energie Sàrl, based in Perly, specializes in the installation, renovation, and repair of sanitary, heating, and ventilation systems.

alliance-energie-sarl.ch

DEM technologies SA

1213 Petit-Lancy · about 2.4 km

DEM Technologies SA in Petit-Lancy installs and maintains plumbing, electrical, heating, ventilation and air-conditioning systems, as well as heat pumps, solar photovoltaic and solar thermal systems.

dem-technologies.ch

Delta Echafaudages SA

1228 Plan-les-Ouates · about 2.5 km

Delta Échafaudages specializes in the rental, assembly, and dismantling of tubular scaffolding for building, renovation, and special works.

delta-echafaudages.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève

Other works in Confignon

Solar water heating in nearby towns