Heat pump grant — Jura
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chHeat pump installation · Delémont

Small project
CHF 30'000 – CHF 54'800
Typical project
CHF 37'800 – CHF 70'500
Large project
CHF 49'600 – CHF 93'900
Computed with our estimator for Delémont (regional factor included), standard finish. Only the project size changes.
In Delémont, located at an altitude of 418 meters, winters are marked by 62 days of frost per year. With heating needs represented by 2931 Kj/year (20/12 °C), replacing your aging fossil fuel system becomes a necessity for energy efficiency.
The city's revised energy master plan actively encourages the switch to individual renewable solutions.
9 °C. By taking advantage of renovation opportunities, you align your home with municipal goals while securing your thermal autonomy against the fluctuations of fossil fuel prices.
It is recommended to first check if your neighborhood is connectable to a priority district heating system, such as the Cras-des-Fourches network operated by the Services industriels de Delémont, before validating your individual heat pump project.
The choice of the heat pump system must precisely meet the thermal needs of your home. The local design temperature determines the power of the heat pump, ensuring constant comfort even on the coldest days.
Current models offer a wide range of options, from common air-to-water systems to geothermal heat pumps, which are more efficient but require specific drilling.
Among the options, coupling with photovoltaic panels is particularly relevant in Delémont, where global solar irradiation reaches 1270 kWh/m²/year. An estimated yield of 1118 kWh/kWp/year on a well-oriented roof allows for self-consumption of a portion of the electricity needed to run your heat pump.
Also, remember that outdoor air-to-water heat pumps must respect noise limits towards neighbors; thoughtful placement and the choice of silent units are essential quality criteria to avoid future disputes and ensure harmonious integration into the urban landscape.
The building stock in Delémont presents varied characteristics that require a rigorous analysis before installing a heat pump. For houses built before 1990, it is imperative to check for the potential presence of asbestos in old insulation or piping materials before any work begins.
The condition of your current distribution network, especially if you have traditional radiators, must be evaluated to ensure it allows for efficient temperature rise with a heat pump.
The overall performance of the building envelope directly influences the sizing of the unit. A poorly insulated house will impose a higher workload on the pump. As part of the revised energy master plan, efficiency is paramount.
Before replacing your heating system, consider insulation improvement measures to reduce your actual energy needs. This approach ensures maximum durability of your new equipment and optimizes your long-term operating costs, taking into account the particularly demanding Jura climate in winter.
The installation of a heat pump in Delémont may be subject to an authorization procedure, especially if geothermal drilling is planned or if your building is listed. It is essential to consult the municipal planning department before any commitment.
This department will specify if your project requires a building permit or a simple prior declaration.
Regarding the replacement of gas boilers, note that a regulatory change enters into force on April 1st, 2026.
According to the Energy Ordinance (EnV), replacement with a new gas boiler is authorized under a condition: you must cover at least 20% of the energy needs for heating and domestic hot water with biomethane or certified renewable gas, sourced from installations in the Canton of Jura.
This rule underscores the cantonal commitment to greening the energy mix. Ensure that any replacement meets these legal requirements to avoid rejection of your application by local authorities.
The Canton of Jura actively supports homeowners in their energy transition through specific subsidies. The 'Heat pump subsidy — Jura' supports the replacement of fossil fuel heating with more efficient systems, with amounts calculated according to the current cantonal scale.
A golden rule must be followed : your grant application must be submitted and approved before work begins. Any intervention started without prior agreement may lead to exclusion from aid benefits.
Tax-wise, deductions are provided to encourage sustainable investments. Expenses for energy conservation are deductible as effective costs from your taxable income. For maintenance, you can choose between a flat deduction of 10% of gross yield (or 20% if the building is over 10 years old) or deducting actual costs.
These measures help reduce the overall financial burden of your project. Consult the Buildings Program website for details on application procedures.
The implementation of a heat pump follows a logical sequence to ensure performance. The first phase consists of an in-depth thermal study to size the equipment based on your building's heat losses. Once authorizations are obtained and grants validated, installation can begin.
It is preferable to avoid periods of extreme cold for this work, although the climate of Delémont requires flexible planning, especially due to the 62 frost days per year.
The work begins with the dismantling of the old boiler and preparation of the room. Then, the outdoor unit is positioned and connected, followed by the installation of the indoor unit and hydraulic lines. Finally, commissioning is performed by qualified technicians who adjust the heating and hot water temperatures.
This step is crucial to ensure thermal comfort and system durability. Once the system is tested and instructions provided, you can officially switch to your new heating mode, thereby optimizing your annual energy consumption.
Before requesting quotes for your heat pump, take the time to structure your project to avoid common pitfalls. First, check if your neighborhood is connectable to a priority district heating system, which could change your strategy.
Ensure you have a clear estimation of your insulation status, as a heat pump cannot compensate for major thermal leaks in an old building. It is essential that outdoor air-to-water heat pumps comply with noise limits towards neighbors to avoid conflict.
Request detailed quotes and compare the technical solutions offered by several providers.9 °C. Never neglect the subsidy step: submit your grant application before signing any contract. Finally, provide sufficient space for technical installation and maintenance access.
By following these simple tips, you secure your long-term investment while respecting the regulatory framework of the Canton of Jura.
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
2800 Delémont · about 0 km
Construction and renovation company in Delémont, specializing in masonry, sanitary facilities, heating, and turnkey projects in the Jura region.
adsconstruction.ch2800 Delémont · about 0 km
Technical insulation specialist since 1973, ISSA SA provides solutions for thermal insulation, heating, ventilation, and acoustic protection.
issajura.ch2800 Delémont · about 0 km
Swissclim Sàrl in Delémont specializes in the installation of air conditioning, refrigeration, dehumidification systems, and wine cellars.
swissclim.ch2800 Delémont · about 0 km
Jura-based company specializing in sanitary installations, heating, and general indoor and outdoor building renovation.
skm-tc.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
You can benefit from cantonal subsidies in Jura for replacing fossil fuel heating. The application must be made via the Buildings Program before starting the work.
No, but from April 1st, 2026, replacement with a new gas boiler requires the use of at least 20% certified renewable gas. This rule aims to reduce the carbon footprint of installations.
It is highly recommended to improve insulation. Better energy efficiency reduces heating needs and optimizes the lifespan of your heat pump.
Air-to-water heat pumps produce sound. It is essential to place the outdoor unit away from living areas and choose a silent model to comply with legal limits.
Yes, check if your home is connectable to the Cras-des-Fourches network. It is often a very efficient and advantageous solution for served areas in Delémont.
Absolutely. With a local irradiation of 1270 kWh/m²/year, installing photovoltaic panels allows you to power your heat pump and make significant savings.
This is the design temperature in Delémont. Your installer must refer to it to ensure that your heat pump will heat correctly during the coldest days.
Source : swisstopo – service d'altitude (MNT)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · estimate
Source : Ville de Delémont
Source : edj.ch
Source : Ville de Delémont
Source : S0