Terrace construction · Écublens

Terrace Design in Écublens: A Comprehensive Guide for Homeowners

Designing a terrace in Écublens allows you to sustainably increase the value of your property while fully enjoying the Vaud climate. This guide walks you through the technical, administrative, and practical steps to ensure your renovation project is a success.
Terrace construction – Écublens

Worked examples in Écublens

Small project

CHF 4'100 – CHF 13'900

Typical project

CHF 7'000 – CHF 22'700

Large project

CHF 11'500 – CHF 36'700

Computed with our estimator for Écublens (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 6'500 (50 %)
  • Materials : CHF 5'200 (40 %)
  • Other costs : CHF 1'300 (10 %)

Why and when to undertake these works in Écublens

6 °C, Écublens offers an ideal setting for outdoor improvements. Managing sunlight, with a global irradiation of 1371 kWh/m²/year, makes investing in a terrace particularly wise for extending living space during the warmer seasons.

Undertaking these works not only improves thermal comfort and aesthetic appeal but also allows for better utilization of your plot.

5 °C. It is strongly recommended to plan your earthworks and surfacing outside of periods of deep frost.

An installation carried out during temperate seasons guarantees better soil stabilization and optimal material placement, thereby avoiding early cracks caused by freeze-thaw cycles that frequently affect constructions in this geographical area.

Technical choices that influence the project

The success of your terrace depends above all on the quality of the support, whether it is a concrete slab, adjustable pedestals, or a gravel bed. The choice of support must be adapted to the nature of the soil and the chosen covering, whether it be wood, ceramic tiles, or natural stone.

In regions like Écublens, subject to frost, it is imperative to select materials resistant to freezing temperatures. For tiling, prefer models certified for outdoor use, laid with flexible joints to absorb structural micro-movements.

Finish options also influence the durability of the structure. Adding a covered or raised terrace changes not only the look but also the technical requirements in terms of waterproofing and load-bearing capacity.

If you opt for a wooden structure, ensure you use durable wood species with a treatment adapted to the ambient humidity.

Each element must be designed to minimize future maintenance needs while ensuring perfect rainwater drainage, which is crucial to prevent moisture infiltration into your building's structural framework.

Specifics of the local building stock according to construction period

The real estate stock in Écublens is diverse, ranging from older individual houses to recent constructions. For buildings constructed before 1990, it is necessary to remain vigilant during earthworks or drilling regarding the potential presence of asbestos in old coverings or buried pipes.

It is essential to check the state of the networks, especially rainwater drainage pipes which, in older buildings, may be undersized or degraded over time. A study of existing conditions helps avoid weakening foundations when anchoring the terrace.

More recent constructions generally benefit from high-performance perimeter insulation, which should not be drilled without precaution when attaching the terrace structure. Direct anchoring into an insulated facade can create thermal bridges, reducing the overall energy efficiency of your home.

It is therefore recommended to use thermal-break fixing systems or to design a self-supporting structure. A rigorous analysis of the original construction plans will help you locate technical conduits hidden under your future terrace surface before starting work.

Permits, rules, and heritage in Écublens

In the canton of Vaud, the construction of a terrace is subject to certain administrative rules that every owner must anticipate. Although many developments can benefit from a simplified procedure or an exemption from a building permit, it is imperative to consult the municipality before starting work.

This step is crucial, especially if your project involves a change in exterior appearance, an elevation, or the creation of a covered terrace. The municipality or the prefect are the competent authorities to validate the compliance of your project with current local regulations.

Although no specific heritage constraints are mentioned for Écublens, caution remains advisable. If your building is located in a protected area, specific requirements may apply, particularly regarding the choice of materials or the coloring of elements.

It is also necessary to be attentive to potential noise disturbances if the project includes technical elements, such as heat pumps, for which a simplified procedure is also applicable.

Never assume that no permit is required : a simple call or email to the local urban planning department will clarify the specific requirements for your plot and avoid costly retroactive steps.

Financial aid and taxation

It is important to note that there are currently no specific public grants for simple terrace construction. Financial aid, when available at the cantonal or federal level, mainly focuses on comprehensive energy efficiency works, such as thermal insulation or the switch to renewable energy.

If your terrace project is linked to a broader energy renovation, it may be useful to check if these elements are eligible for grants. However, for a standard terrace, the costs are fully borne by the owner.

Regarding taxation, maintenance costs for a building can be deducted from your taxable income. These are generally works that serve to maintain the value of your property.

Conversely, renovation or improvement works that increase the value of the building, such as creating a new terrace where there was none before, are generally not deductible as maintenance costs.

It is strongly advised to keep all receipts for your expenses and consult your tax administration or a financial advisor before starting work to clarify the nature of the works and their impact on your tax return.

Schedule: Typical workflow of the construction site

The workflow of a terrace construction project is divided into several key stages. Everything starts with planning and applying for a permit from the municipality if necessary. Once permits are obtained, the first phase consists of preparing the ground: earthworks, leveling, and installing the drainage system.

Drainage is a crucial step, especially given local weather conditions, to prevent water stagnation. Then, the support is put in place, whether it is a dried concrete slab or a structure on pedestals. Finally, the final covering is laid, followed by finishing touches and site cleanup.

The best season to carry out these works is during periods when temperatures are stable and mild. Ideally, choose late spring or early autumn. It is essential to avoid months when frost is likely to occur, as concrete and setting mortars require optimal conditions for their setting and hardening.

Working outside of frost days guarantees the longevity of your structure and avoids costly rework related to material deformations caused by temperature variations during the drying phase.

Common errors and checklist

A classic mistake is neglecting water drainage, which leads to infiltration into the building's foundations over time. Absolutely avoid attaching heavy structures to facade insulation without protection against thermal bridges.

Never underestimate the importance of the support, because even the most expensive covering will deteriorate if the base is unstable or poorly drained. Ensure you have clearly clarified your expectations with the craftsman when requesting a quote to avoid budget or schedule surprises.

Checklist before requesting quotes : 1. Check if a permit application is necessary with the municipality of Écublens. 2. Precisely define the surface and desired materials. 3. Identify the type of support suitable for your land (concrete, gravel, pedestals). 4. Plan for drainage and water evacuation. 5.

List any necessary technical connections (lighting, sockets, water). 6. Request detailed quotes allowing for comparison of services. 7. Verify the warranties offered by the companies solicited. 8. Ensure that the craftsman incorporates climatic constraints into his quote. 9. Plan the work outside of frost periods. 10.

Document the state of your facade before the start of the work.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Philippe Boissenot

1024 Ecublens VD · about 0 km

Philippe Boissenot provides chimney lining services, installation of stoves and barbecues, and dry stone wall construction.

phboissenot.ch

Home-construction Sàrl

1024 Ecublens VD · about 0 km

General contractor in Ecublens specializing in full renovation, new construction, interior design, and technical building expertise.

home-construction.ch

Medana Etanchéité S.A.

1024 Ecublens VD · about 0 km

Medana Etanchéité S.A., based in Ecublens, provides flat roof waterproofing, thermal insulation, greening and maintenance, as well as waterproofing for terraces and civil engineering structures.

medana.ch

R & C Rénovation Carrelage Sàrl

1022 Chavannes-près-Renens · about 1.3 km

R.C.R. Sàrl is a renovation company based in Gland specializing in tiling, masonry, and interior and exterior renovation projects.

renovcarrelage-rcr.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

Do I need a permit for a terrace in Écublens?

The need for a permit depends on the scale of the work. Please contact the municipality to validate if your project falls under a simplified procedure or is exempt.

Which materials are preferred to resist frost?

Choose ceramic tiles certified for outdoor use or durable natural woods. Ensure the support is draining to avoid water accumulation.

What is the best time of the year for the work?

Late spring or early autumn are ideal periods. It is crucial to avoid frost days to ensure proper setting of concrete and mortars.

Can I deduct the cost of my terrace from taxes?

Creation works increasing the property value are generally not deductible. Consult your tax administration to confirm according to your situation.

How to avoid thermal bridges with my facade?

Use thermal-break fixing systems or design a self-supporting structure. Avoid drilling directly into high-performance insulation.

Why is the support as important as the covering?

A stable and well-drained support prevents subsidence and water infiltration. Without a solid base, even a high-quality covering will deteriorate quickly.

What are the risks linked to older houses?

Houses built before 1990 may contain asbestos or have fragile buried networks. A prior inspection is essential before any excavation.

Useful local data

Altitude — 426 m

Source : swisstopo – service d'altitude (MNT)

Heating degree days — 2'759 Kj/an (20/12 °C)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Frost days — 48 jours/an

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Solar irradiation — 1'371 kWh/m²/an (horizontal)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Winter design temperature — -4.5 °C (1er percentile des minimales)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Mean temperature — 11.6 °C

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

PermitsCanton

  • Competent authority : municipalité ou préfet
  • Solar panels : Soumis à la procédure simplifiée ou dispense de permis de construire
  • Heat pump : Soumis à la procédure simplifiée ou dispense de permis de construire. Pour les pompes à chaleur air-eau ou air-air, les nuisances sonores sont prises en compte.
  • Procedure : procédure simplifiée de permis de construire (dispense de permis de construire)
  • Windows and facades : Soumis à la procédure simplifiée ou dispense de permis de construire, sauf si le bâtiment est protégé ou situé dans une zone protégée, ou si les travaux entraînent un changement d'affectation, d'aspect extérieur ou de gabarit important.

Source : Canton de Fribourg: Permis de construire (example, this is Fribourg) · estimate

Housing stock

  • Note : Les sources fournies sont des pages générales sur les statistiques de la construction et du logement pour le canton de Vaud (S0) et la Suisse (S1), ainsi que des informations sur les propriétaires de bâtiments dans le canton de Genève (S2). Aucune donnée spécifique n'est disponible pour la commune d'Écublens permettant de remplir les champs demandés.

Other works in Écublens

Terrace construction in nearby towns