The implementation of a heat pump project in Écublens follows several key stages. It all starts with a feasibility study and the choice of equipment, followed by the grant application to the Buildings Program, an imperative step before validating any quote.
Once the principal agreement is obtained and municipal authorizations are verified, installation planning can begin. It is best to avoid the winter period, marked by 48 frost days, so as not to interrupt your home's heating during the works.
Once the period is chosen, installers proceed with the removal of the old boiler, the preparation of the technical room, and, if necessary, the connection to the distribution network.
The installation of the outdoor unit, requiring a stable base and compliance with distances to the neighborhood to limit noise, is a central phase. Finally, the system is commissioned with precise settings to optimize efficiency.
The total duration of the site will depend on the complexity of the adaptations on your internal heating network, while remaining an operation that can be planned outside the most rigorous months.