In the canton of Vaud, installing a heat pump is generally subject to the simplified building permit procedure, also known as a permit exemption. This administrative formality is essential to ensure the project's compliance with current regulations.
The competent authority, the municipality or the prefect, examines in particular the management of noise pollution, a critical point for air-water or air-air heat pumps.
It is your responsibility to provide a complete file demonstrating that the noise level emitted complies with the authorized limits for surrounding residential areas.
Regarding heritage aspects, if your building is protected or located in a protected area, stricter rules apply. Although the procedure is often simplified, any change in external appearance or building volume requires special attention.
For additional solar installations, an announcement form, a location plan, a cadastral excerpt, and a photo of the building are required.
We strongly recommend consulting the town planning department of the municipality of Montreux before signing any contract, to check the constraints specific to your plot and obtain the necessary authorizations.