Solar thermal — Buildings Programme (VD)
Flat contribution or per m² of collectors.
Grants for solar thermal systems (hot water, heating support).
www.leprogrammebatiments.chSolar water heating · Montreux

Small project
CHF 10'100 – CHF 23'600
Typical project
CHF 13'000 – CHF 30'200
Large project
CHF 17'800 – CHF 41'000
Computed with our estimator for Montreux (regional factor included), standard finish. Only the project size changes.
Montreux enjoys a privileged geographic position with attractive annual global irradiation. Undertaking a thermal renovation now supports the goals of the municipal Climate Plan, which aims for a drastic reduction in CO2 emissions by 2040.
The Montreux real estate stock, with a heating demand of 2560 heating degree days, benefits significantly from this technology.
The transition to renewable systems becomes crucial as aging equipment reaches the end of its lifespan. By combining this with a roof renovation or the renewal of your domestic hot water production, you optimize installation costs and overall building performance in line with Montreux's 'Energy City Gold' status.
Sizing is key to a successful solar thermal project. Flat plate collectors are often favored for their robustness and aesthetic integration, while vacuum tube collectors offer higher efficiency in winter conditions.
Since thermal collectors generally cover a large part of the summer hot water demand, the choice of storage volume is critical to avoid overheating during peak sun hours.
It is strongly advised to conduct a sizing study if you plan to combine your installation with a heat pump. This combination requires precise synchronization for optimal performance.
The quality of materials, particularly the durability of heat exchangers and the insulation performance of the storage tank, represents a lasting investment that will impact your equipment's lifespan.
Montreux has a varied real estate stock, from old villas to more recent condominiums. Before any installation, it is essential to assess the roof's condition, especially for buildings constructed before 1990 where asbestos could be present.
A prior inspection of the load-bearing structure verifies if reinforcements are necessary to support the weight of the solar thermal panels.
Furthermore, the building's overall thermal insulation directly influences the efficiency of your solar heating support. A poorly insulated building will see its energy needs limit the system's effectiveness.
Also ensure that the internal plumbing is compatible with operating temperatures and that pipe routes to the technical room do not require complex penetrations affecting the building's airtightness.
In the canton of Vaud, the building permit procedure for solar thermal installations is simplified, provided the building is not listed or located in a strict protection zone.
It is necessary to provide an announcement form accompanied by a site plan, a cadastral extract, as well as photographs of the proposed installation on the building.
Although the procedure is facilitated, verification with the municipality is always recommended. If your property is in a sensitive area, landscape integration constraints may apply.
These steps aim to harmonize interventions while allowing for massive territorial equipment, a pillar of the Montreux Climate Plan to achieve the 2040 energy targets.
The Buildings Program (VD) offers grants for solar thermal installations. It is imperative to submit your application before starting work to be eligible. This aid, provided as a flat contribution or per square meter of installed collectors, is a major financial lever for your energy transition.
Tax-wise, investments aimed at saving energy are fully deductible. If the cost of the work exceeds your taxable net income for the year, the carry-forward rule allows you to deduct the remainder over the next two fiscal years.
Note that if you receive a public grant, only the portion you personally pay is tax-deductible. This lasting tax incentive encourages Montreux homeowners to invest sustainably in their properties.
A solar thermal project follows a rigorous logic, starting with a feasibility study and the preliminary grant application. Once financing is secured and the municipal notification processed, the choice of installer follows.1 °C.
Installation ideally takes place during the warmer season to avoid constraints related to freezing. The project itself includes mounting the supports, hydraulic connection, pipe insulation, and integration into the buffer tank.
Thorough commissioning is necessary to verify the circuit's tightness and heat exchange performance, ensuring your system functions correctly year-round.
The main error is under-sizing or over-sizing the system, which drastically reduces profitability. Before requesting quotes, know the age of your current installation and the nature of your roof. Require your installers to provide a thermal calculation note consistent with your actual consumption.
Never start work before obtaining written confirmation of your eligibility for grants.
Checklist : Check if your roof needs future repair. Confirm there is sufficient space in your utility room for the solar tank. Request multiple comparative quotes detailing the materials used. Ensure the installer offers a maintenance contract for future years.
Finally, check that the proposed solutions respect the municipality's visual integration standards.
Flat contribution or per m² of collectors.
Grants for solar thermal systems (hot water, heating support).
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1816 Chailly-Montreux · about 3.5 km
Dumas-Kessler Chauffage SA provides installation services for heating, plumbing, and renewable energy systems.
dkc-chauffage.ch1816 Chailly-Montreux · about 3.5 km
Amiar Services Sàrl is a family-owned business based in Montreux specializing in heating, air conditioning, and renewable energy installations.
amiarservices.ch1815 Clarens · about 3.7 km
Fernandes & Fils Sàrl is a family business specializing in roofing, sheet metal work, sanitary installations, and heating and solar systems.
fernandes-fils.ch1807 Blonay · about 4.7 km
Smart&Smile sàrl specializes in energy renovation consulting, thermal insulation, renewable energy, and subsidy management.
smart-smile.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
It generally cannot replace your heating system alone but serves as an efficient supplement. It primarily covers domestic hot water needs.
The procedure is simplified, but an announcement is mandatory. It is advisable to check with the municipality before starting.
The Buildings Program (VD) offers flat grants or per m². The application must be made before the work begins.
Yes, it works even in cold weather, although output is lower than in summer. A backup heater is needed for days without sun.
Investment costs are 100% deductible. Carrying over the balance is possible for two years if net income is negative.
A well-maintained installation generally lasts between 20 and 25 years. Regular maintenance optimizes this longevity.
Proper storage sizing and adapted electronic management prevent overheating. Your installer must validate this.
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · estimate
Source : swisstopo – service d'altitude (MNT)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : 24 heures
Source : Canton de Fribourg: Permis de construire (example, this is Fribourg) · estimate
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)