Indicative price, tips, grants and companies for your project in Saint-Sulpice (Vaud).
At a glance
Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4
Worked examples in Saint-Sulpice
Small project
CHF 4'400 – CHF 10'000
Typical project
CHF 7'900 – CHF 16'900
Large project
CHF 13'600 – CHF 28'000
Project
Quantity
Low
High
Per unit
Small project
5 kWh
CHF 4'400
CHF 10'000
CHF 1'300
Typical project
10 kWh
CHF 7'900
CHF 16'900
CHF 1'200
Large project
18 kWh
CHF 13'600
CHF 28'000
CHF 1'100
Computed with our estimator for Saint-Sulpice (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 2'300(20 %)
Materials :CHF 8'100(70 %)
Other costs :CHF 1'200(10 %)
What the price covers
Included
Supply and installation
VAT
Battery, charge management and standard connection; options according to answers
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Solar panels and complete electrical refurbishment
Tips before you start
A battery is worthwhile when solar output clearly exceeds your daytime use.
Size capacity by evening consumption, not panel power.
Check compatibility with your existing inverter before buying.
Your project in 5 steps
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Grants and subsidies
No specific grant listed for this work. Maintenance tax deductions may still apply.
Saint-Sulpice's housing stock in figures
The federal building register lists 664 residential buildings with 2'639 dwellings in Saint-Sulpice. 55% were built before 1980, before serious insulation standards, and 66% are still heated with oil or gas.
Only 19.9% of residential buildings in Saint-Sulpice report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.
55 %built before 1980
66 %heated by oil or gas
8 %electric hot water
19.9 %with declared solar thermal
Age of residential buildings
Before 19196 %
1919–194513 %
1946–196012 %
1961–197012 %
1971–198012 %
1981–199010 %
1991–20005 %
2001–20106 %
Since 201124 %
Main heating energy
Gas44 %
Heat pump27 %
Heating oil22 %
Electricity4 %
Wood2 %
District heating1 %
Heating and hot water: which energies?
Energy
Heating
Hot water
Gas
44 %
40 %
Heating oil
22 %
23.7 %
District heating
1 %
0.2 %
Heat pump
27 %
10.3 %
Electricity
4 %
8 %
Wood
2 %
1 %
Solar thermal
0 %
16.4 %
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
Boiler (unspecified)48.4 %
Heat pump27.4 %
Condensing boiler12.6 %
Standard boiler6.1 %
Central electric heating3.6 %
Heat exchanger (district)0.6 %
Stove0.6 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
Single-family houses51.4 %
Two-dwelling houses14.6 %
Apartment buildings (3+)33.9 %
Other0.2 %
10.5 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
3
median footprint
146 m²
median dwelling area
87 m²
Renovations, heritage and volumes
For renovation planning in Saint-Sulpice, official building register figures provide essential insights. With one building formally listed under heritage protection, property owners must contact the municipality early to understand specific permit requirements. Regarding building volume, data is partial, covering only 113 out of 341 houses measured according to the SIA 416 standard. For these properties, the median volume is 1068 cubic meters, which serves as a key indicator for scaling insulation improvements or heating system upgrades. Please note that these figures represent a limited portion of the total housing stock currently recorded in the register.
1
buildings flagged as protected
status known for 61 of 664 buildings; check with the municipality
Sun Sphère Energy specializes in the energy transition, offering the installation of photovoltaic panels, heat pumps, and energy storage solutions in the Pays de Gex and Haute-Savoie regions.
Maison Solar Swiss is a company specializing in the energy transition, providing photovoltaic panels, heat pumps, and battery storage solutions in French-speaking Switzerland.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Vaud
These rules apply across the whole canton, not only in this town.
Tax deductions
Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.