Roof renovation · Spiez

Roof renovation in Spiez

Indicative price, tips, grants and companies for your project in Spiez (Bern).
Roof renovation – Spiez

At a glance

Typical budget
CHF 27'500 – CHF 60'700
Midpoint
CHF 41'600
Grants found
0
Nearby companies
4

Worked examples in Spiez

Small project

CHF 15'200 – CHF 34'900

Typical project

CHF 27'500 – CHF 60'700

Large project

CHF 46'000 – CHF 99'400

ProjectQuantityLowHigh
Small project70 m²CHF 15'200CHF 34'900
Typical project140 m²CHF 27'500CHF 60'700
Large project245 m²CHF 46'000CHF 99'400

Computed with our estimator for Spiez (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 20'800 (50 %)
  • Materials : CHF 16'700 (40 %)
  • Other costs : CHF 4'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Covering, scaffolding, insulation and removal according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • New roof structure, asbestos, roof windows and structural reinforcement

Spiez's housing stock in figures

In Spiez, the federal building register lists 3'373 residential buildings and 7'560 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

65 %built before 1980
49 %heated by oil or gas
46.7 %electric hot water
5 %with declared solar thermal

Age of residential buildings

65 % built before 1980

  • Before 191911 %
  • 1919–194512 %
  • 1946–196015 %
  • 1961–197015 %
  • 1971–198012 %
  • 1981–199012 %
  • 1991–20009 %
  • 2001–20107 %
  • Since 20117 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

48 % · Heating oil

  • Heating oil48 %
  • Heat pump31 %
  • Wood12 %
  • Electricity7 %
  • District heating2 %
  • Gas1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas1 %0.7 %
Heating oil48 %27 %
District heating2 %2 %
Heat pump31 %12.2 %
Electricity7 %46.7 %
Wood12 %5.9 %
Solar thermal0 %5.1 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)36.7 %
  • Heat pump30.8 %
  • Standard boiler12.8 %
  • Condensing boiler7.3 %
  • Central electric heating5.3 %
  • Stove3.4 %
  • Heat exchanger (district)2.1 %
  • Direct electric heaters1.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses56.2 %
  • Two-dwelling houses22.3 %
  • Apartment buildings (3+)21.5 %

7.6 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
107 m²
median dwelling area
90 m²

Renovations, heritage and volumes

For renovations in Spiez, official registry figures show that 4 buildings are currently under heritage protection. If your property is classified, ensure you contact the municipality early to navigate the permit process. Regarding building volume, the median is 824 m3 based on 35 structures measured by SIA 416 standards. Note that data coverage is partial, as the remaining majority of the 1897 total houses utilize other standards or remain unmeasured. Understanding these volume metrics is essential for accurately scaling your insulation or heating system upgrades to ensure your renovation project aligns with local building specifications.

4
buildings flagged as protected
status known for 439 of 3'373 buildings; check with the municipality
824 m³
median house volume (SIA 416)
measured for 35 of 1'897 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • Insulating the roof together with the covering is often eligible for the Buildings Programme.
  • Existing solar panels must be removed and refitted: budget for it.
  • At altitude, snow loads and frost influence material choice.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Fasel-Piller Gebäudehülle AG

1716 Plaffeien · about 29.7 km

Swiss company specializing in building services, tinsmithing, roofing, and solar installations for the building envelope.

faselpillerag.ch

wirbauen AG, Zweigniederlassung Heitenried

1714 Heitenried · about 32.3 km

wirbauen AG is a general construction company specializing in residential, commercial, and infrastructure projects in the Fribourg region.

wirbauen.ch

TSM - Travaux Spéciaux et Minage Sàrl

1654 Cerniat FR · about 35.8 km

TSM specializes in difficult access works, blasting, and operations in confined, underground, or underwater environments.

minage.ch

Charrière Toiture Sàrl

1654 Cerniat FR · about 35.8 km

Charrière Toiture Sàrl is a company specializing in tinsmithing, roofing, and roof waterproofing.

charriere-toiture.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Spiez

Other works in Spiez

Roof renovation in nearby towns