Eco6therm Sàrl
2832 Rebeuvelier · about 104.3 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Wetzikon (ZH)

At a glance
Small project
CHF 4'400 – CHF 10'200
Typical project
CHF 8'100 – CHF 17'200
Large project
CHF 13'900 – CHF 28'500
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'400 | CHF 10'200 | CHF 1'400 |
| Typical project | 10 kWh | CHF 8'100 | CHF 17'200 | CHF 1'200 |
| Large project | 18 kWh | CHF 13'900 | CHF 28'500 | CHF 1'100 |
Computed with our estimator for Wetzikon (ZH) (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Wetzikon (ZH), the federal building register lists 3'159 residential buildings and 12'630 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
56 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
46 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 46 % | 39.9 % |
| Heating oil | 15 % | 11.9 % |
| District heating | 2 % | 1.2 % |
| Heat pump | 29 % | 22.7 % |
| Electricity | 3 % | 19.1 % |
| Wood | 5 % | 3.1 % |
| Solar thermal | 0 % | 1.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
11 % of buildings mix housing with shops or offices.
For renovation projects in Wetzikon, RegBL figures provide vital context. With a median house volume of 577 m3 among those measured by SIA 416, homeowners can better gauge the scale of necessary heating or insulation works. Regarding heritage protection, one building is officially listed out of 767 known cases. If your property falls under this status, contacting the municipality early is essential to navigate permit requirements. Please be aware that data coverage for these metrics is partial. Furthermore, no specific renovation year is recorded in the register, meaning this information is unavailable for your planning purposes.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 104.3 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 115 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2605 Sonceboz-Sombeval · about 123.4 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.ch2718 Lajoux JU · about 125.2 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.