Window replacement – Bussigny

At a glance

Typical budget
CHF 7'800 – CHF 18'800
Midpoint
CHF 12'600
Grants found
1
Nearby companies
4

Worked examples in Bussigny

Small project

CHF 5'100 – CHF 12'700

Typical project

CHF 7'800 – CHF 18'800

Large project

CHF 14'100 – CHF 32'900

ProjectQuantityLowHigh
Small project4 unitsCHF 5'100CHF 12'700
Typical project7 unitsCHF 7'800CHF 18'800
Large project13 unitsCHF 14'100CHF 32'900

Computed with our estimator for Bussigny (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 4'400 (35 %)
  • Materials : CHF 6'900 (55 %)
  • Other costs : CHF 1'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Frames, glazing and blinds according to answers, per window size; standard making good

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Sliding doors, roof windows, changes to openings

Tips before you start

  • Count your windows by size (small, standard, French doors, bays) for a fairer price.
  • Windows alone are rarely subsidised: grants usually target a full envelope renovation.
  • In protected areas or visible facades, frame shape and colour may be imposed.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Window replacement — Buildings Programme (VD)

Usually included in envelope renovation contributions (per m² or flat rate).

Window replacement can be subsidised when part of an energy renovation of the envelope.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Bussigny's housing stock in figures

The federal building register lists 1'141 residential buildings with 5'316 dwellings in Bussigny. 46% were built before 1980, before serious insulation standards, and 53% are still heated with oil or gas.

With 46% of buildings dating from before 1980, the envelope is often the biggest saving. 71.1% are one- or two-dwelling houses where the owner decides alone; in apartment buildings, plan for a co-owners' decision. Have asbestos and PCB checked first.

46 %built before 1980
53 %heated by oil or gas
22.6 %electric hot water
13 %with declared solar thermal

Age of residential buildings

  • Before 19199 %
  • 1919–19455 %
  • 1946–19606 %
  • 1961–19707 %
  • 1971–198019 %
  • 1981–199017 %
  • 1991–200011 %
  • 2001–20106 %
  • Since 201119 %

Main heating energy

  • Gas32 %
  • Heat pump24 %
  • Heating oil21 %
  • Electricity18 %
  • Wood3 %
  • District heating2 %

Houses or apartment buildings?

  • Single-family houses61.2 %
  • Two-dwelling houses9.9 %
  • Apartment buildings (3+)28.9 %

7.2 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
97 m²
median dwelling area
78 m²

Renovations, heritage and volumes

For your renovation plans in Bussigny, data from the federal building register provides important insights. Out of 1141 buildings, 408 are under heritage protection, necessitating early consultation with the municipality regarding required permits. Regarding building scale, 179 structures have a median volume of 788 m3 according to SIA 416, which is vital for planning heating systems or insulation upgrades. Please note that data coverage is partial, as 519 buildings are measured using other standards or remain unknown. We recommend verifying these specifics early to ensure your renovation cost estimations are accurate for your property.

408
buildings flagged as protected
status known for 529 of 1'141 buildings; check with the municipality
788 m³
median house volume (SIA 416)
measured for 179 of 698 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Tolotta & Fils Sàrl

1030 Bussigny-Lausanne · about 0 km

Tolotta & Fils Sàrl is a family-owned company specializing in the sale, installation, and repair of blinds, shutters, and sun protection systems.

tolotta.ch

Immobat Construction SA, succursale de Bussigny

1030 Bussigny · about 0 km

General construction and renovation company in French-speaking Switzerland, specializing in civil engineering, building, and telecom infrastructure since 2010.

immo-bat.ch

ALTiTEC sécurité Sàrl

1030 Bussigny-Lausanne · about 0 km

Specialist in rope access and difficult-to-reach work for cleaning, painting, roofing, and facade or window maintenance.

altitec.ch

Menuiserie Goitom

1030 Bussigny · about 0 km

Menuiserie Goitom is a carpentry business based in Bussigny specializing in wood fittings.

menuiserie-goitom.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Bussigny

Window replacement in nearby towns