Home solar battery · Courrendlin

Home solar battery in Courrendlin

Indicative price, tips, grants and companies for your project in Courrendlin (Jura).
Home solar battery – Courrendlin

At a glance

Typical budget
CHF 7'200 – CHF 15'400
Midpoint
CHF 10'500
Grants found
0
Nearby companies
4

Worked examples in Courrendlin

Small project

CHF 4'000 – CHF 9'100

Typical project

CHF 7'200 – CHF 15'400

Large project

CHF 12'400 – CHF 25'400

ProjectQuantityLowHigh
Small project5 kWhCHF 4'000CHF 9'100
Typical project10 kWhCHF 7'200CHF 15'400
Large project18 kWhCHF 12'400CHF 25'400

Computed with our estimator for Courrendlin (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'100 (20 %)
  • Materials : CHF 7'300 (70 %)
  • Other costs : CHF 1'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Courrendlin's housing stock in figures

The federal building register lists 906 residential buildings with 1'837 dwellings in Courrendlin. 54% were built before 1980, before serious insulation standards, and 62% are still heated with oil or gas.

Only 4.4% of residential buildings in Courrendlin report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

54 %built before 1980
62 %heated by oil or gas
20.8 %electric hot water
4.4 %with declared solar thermal

Age of residential buildings

  • Before 191913 %
  • 1919–19459 %
  • 1946–196012 %
  • 1961–19708 %
  • 1971–198012 %
  • 1981–19908 %
  • 1991–20009 %
  • 2001–201011 %
  • Since 201117 %

Main heating energy

  • Heating oil43 %
  • Heat pump26 %
  • Gas19 %
  • Wood9 %
  • Electricity3 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas19 %15.9 %
Heating oil43 %39.5 %
Heat pump26 %16.4 %
Electricity3 %20.8 %
Wood9 %5.7 %
Solar thermal0 %1.7 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)61.5 %
  • Heat pump25.9 %
  • Condensing boiler4.5 %
  • Stove4 %
  • Central electric heating3.4 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses74.3 %
  • Two-dwelling houses11.6 %
  • Apartment buildings (3+)14.1 %

6.6 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
126 m²
median dwelling area
100 m²

Renovations, heritage and volumes

For your renovation plans in Courrendlin, the RegBL data provides essential insights despite partial coverage. Out of 906 registered buildings, 10 are under heritage protection, meaning you must contact the municipality early to secure necessary permits for your project. While the building volume is recorded for 673 houses, the lack of SIA 416 measurements makes estimating the scale of heating or insulation work more challenging. We strongly recommend conducting an on-site assessment to verify the actual dimensions and regulatory requirements of your property, ensuring that your renovation budget is calculated accurately based on your specific building status.

10
buildings flagged as protected
status known for 76 of 906 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Eco6therm Sàrl

2832 Rebeuvelier · about 3.6 km

Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.

eco6therm.ch

TELEC Renggli S.A. (Télécommunications, Electricité et Commerce)

2735 Malleray · about 11.4 km

Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.

telecrengglisa.ch

HyperSolaire Sàrl

2718 Lajoux JU · about 17.8 km

Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.

hypersolaire.ch

Solar conseil Sàrl

2605 Sonceboz-Sombeval · about 20.9 km

Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.

solarconseil.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Jura

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Flat rate deduction : 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans)
  • Maintenance costs : forfaitaire 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans) ou effectifs
  • Energy investments : Dépenses pour l'économie d'énergie sont déductibles en tant que frais effectifs.

Source : S0

Other works in Courrendlin