Heat pump grant — Jura
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chHeat pump installation · Courrendlin

At a glance
Small project
CHF 30'000 – CHF 54'800
Typical project
CHF 37'800 – CHF 70'500
Large project
CHF 49'600 – CHF 93'900
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'000 | CHF 54'800 | CHF 500 |
| Typical project | 160 m² | CHF 37'800 | CHF 70'500 | CHF 300 |
| Large project | 280 m² | CHF 49'600 | CHF 93'900 | CHF 300 |
Computed with our estimator for Courrendlin (regional factor included), standard finish. Only the project size changes.
Included
Not included
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
The federal building register lists 906 residential buildings with 1'837 dwellings in Courrendlin. 54% were built before 1980, before serious insulation standards, and 62% are still heated with oil or gas.
With 62% fossil heating and 20.8% electrically heated hot water, many buildings in Courrendlin will need a new system. Planning ahead avoids deciding under pressure after a breakdown.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 19 % | 15.9 % |
| Heating oil | 43 % | 39.5 % |
| Heat pump | 26 % | 16.4 % |
| Electricity | 3 % | 20.8 % |
| Wood | 9 % | 5.7 % |
| Solar thermal | 0 % | 1.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For your renovation plans in Courrendlin, the RegBL data provides essential insights despite partial coverage. Out of 906 registered buildings, 10 are under heritage protection, meaning you must contact the municipality early to secure necessary permits for your project. While the building volume is recorded for 673 houses, the lack of SIA 416 measurements makes estimating the scale of heating or insulation work more challenging. We strongly recommend conducting an on-site assessment to verify the actual dimensions and regulatory requirements of your property, ensuring that your renovation budget is calculated accurately based on your specific building status.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
2832 Rebeuvelier · about 3.6 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2822 Courroux · about 4.7 km
Sanit & Bilat Fils S.A. is a company specializing in sanitary installations, heating systems, and renewable energy solutions.
sanit.ch2822 Courroux · about 4.7 km
Based in Courroux, Denis Paratte Sàrl carries out sheet metal work, roofing, plumbing and heating installations, as well as repairs and renovations.
denisparatte.ch2824 Vicques · about 5.1 km
Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.
sanit.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
These rules apply across the whole canton, not only in this town.
Fossil heating rules
Source : edj.ch
Tax deductions
Source : S0