Heat pump installation · Courrendlin

Heat pump installation in Courrendlin

Indicative price, tips, grants and companies for your project in Courrendlin (Jura).
Heat pump installation – Courrendlin

At a glance

Typical budget
CHF 37'800 – CHF 70'500
Midpoint
CHF 52'900
Grants found
1
Nearby companies
4

Worked examples in Courrendlin

Small project

CHF 30'000 – CHF 54'800

Typical project

CHF 37'800 – CHF 70'500

Large project

CHF 49'600 – CHF 93'900

ProjectQuantityLowHigh
Small project80 m²CHF 30'000CHF 54'800
Typical project160 m²CHF 37'800CHF 70'500
Large project280 m²CHF 49'600CHF 93'900

Computed with our estimator for Courrendlin (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'200 (40 %)
  • Materials : CHF 26'500 (50 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Jura

Amounts per current cantonal schedule.

The canton of Jura supports replacing fossil heating with heat pumps.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Courrendlin's housing stock in figures

The federal building register lists 906 residential buildings with 1'837 dwellings in Courrendlin. 54% were built before 1980, before serious insulation standards, and 62% are still heated with oil or gas.

With 62% fossil heating and 20.8% electrically heated hot water, many buildings in Courrendlin will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

54 %built before 1980
62 %heated by oil or gas
20.8 %electric hot water
4.4 %with declared solar thermal

Age of residential buildings

  • Before 191913 %
  • 1919–19459 %
  • 1946–196012 %
  • 1961–19708 %
  • 1971–198012 %
  • 1981–19908 %
  • 1991–20009 %
  • 2001–201011 %
  • Since 201117 %

Main heating energy

  • Heating oil43 %
  • Heat pump26 %
  • Gas19 %
  • Wood9 %
  • Electricity3 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas19 %15.9 %
Heating oil43 %39.5 %
Heat pump26 %16.4 %
Electricity3 %20.8 %
Wood9 %5.7 %
Solar thermal0 %1.7 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)61.5 %
  • Heat pump25.9 %
  • Condensing boiler4.5 %
  • Stove4 %
  • Central electric heating3.4 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation plans in Courrendlin, the RegBL data provides essential insights despite partial coverage. Out of 906 registered buildings, 10 are under heritage protection, meaning you must contact the municipality early to secure necessary permits for your project. While the building volume is recorded for 673 houses, the lack of SIA 416 measurements makes estimating the scale of heating or insulation work more challenging. We strongly recommend conducting an on-site assessment to verify the actual dimensions and regulatory requirements of your property, ensuring that your renovation budget is calculated accurately based on your specific building status.

10
buildings flagged as protected
status known for 76 of 906 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Eco6therm Sàrl

2832 Rebeuvelier · about 3.6 km

Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.

eco6therm.ch

Sanit & Bilat Fils S.A., succursale de Courroux

2822 Courroux · about 4.7 km

Sanit & Bilat Fils S.A. is a company specializing in sanitary installations, heating systems, and renewable energy solutions.

sanit.ch

Denis Paratte Sàrl

2822 Courroux · about 4.7 km

Based in Courroux, Denis Paratte Sàrl carries out sheet metal work, roofing, plumbing and heating installations, as well as repairs and renovations.

denisparatte.ch

Sanit & Bilat Fils S.A.

2824 Vicques · about 5.1 km

Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.

sanit.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Jura

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : La modification de l'ordonnance permettant le remplacement des chaudières à gaz sous certaines conditions est le résultat d'une motion parlementaire. Le gestionnaire de réseau de gaz valide le remplacement et s'engage à fournir les garanties d'origine. (Source S2)
  • Legal basis : Ordonnance portant application de la loi sur l'énergie (Ordonnance sur l'énergie, OEn)
  • In force since : 1er avril 2026 (pour la modification concernant le remplacement des chaudières à gaz) (Source S2)
  • Heating replacement : Dès le 1er avril 2026, il est possible de remplacer une chaudière à gaz existante par une nouvelle chaudière à gaz, à la condition de couvrir au moins 20% des besoins énergétiques prévisibles pour le chauffage et la production d’eau chaude sanitaire avec du biométhane ou un autre gaz renouvelable. (Source S2)
  • Renewable share required : Au moins 20% des besoins en chauffage et eau chaude sanitaire doivent être couverts par du biométhane ou un autre gaz renouvelable provenant d’installations situées dans le Canton du Jura et certifié par des garanties d’origine reconnues, en cas de remplacement d'une chaudière à gaz par une nouvelle. (Source S2)

Source : edj.ch

Tax deductions

  • Flat rate deduction : 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans)
  • Maintenance costs : forfaitaire 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans) ou effectifs
  • Energy investments : Dépenses pour l'économie d'énergie sont déductibles en tant que frais effectifs.

Source : S0

Other works in Courrendlin

Heat pump installation in nearby towns