Heat pump grant — Jura
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chHeat pump installation · Val Terbi

At a glance
Small project
CHF 30'000 – CHF 54'800
Typical project
CHF 37'800 – CHF 70'500
Large project
CHF 49'600 – CHF 93'900
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'000 | CHF 54'800 | CHF 500 |
| Typical project | 160 m² | CHF 37'800 | CHF 70'500 | CHF 300 |
| Large project | 280 m² | CHF 49'600 | CHF 93'900 | CHF 300 |
Computed with our estimator for Val Terbi (regional factor included), standard finish. Only the project size changes.
Included
Not included
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Amounts per current cantonal schedule.
The canton of Jura supports replacing fossil heating with heat pumps.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
The federal building register lists 1'127 residential buildings with 1'593 dwellings in Val Terbi. 55% were built before 1980, before serious insulation standards, and 40% are still heated with oil or gas.
With 40% fossil heating and 17.3% electrically heated hot water, many buildings in Val Terbi will need a new system. Planning ahead avoids deciding under pressure after a breakdown.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 0 % | 1.2 % |
| Heating oil | 40 % | 40.1 % |
| Heat pump | 38 % | 24.4 % |
| Electricity | 4 % | 17.3 % |
| Wood | 17 % | 13.3 % |
| Solar thermal | 0 % | 2.9 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
When planning renovations in Val Terbi, consulting official building register figures helps clarify local requirements. Currently, data regarding specific renovation years and precise building volumes are not available. Regarding heritage protection, out of 1127 total buildings recorded, one is officially classified as protected. Because this data coverage is partial, homeowners should contact the municipality as early as possible before starting any project. Engaging with local authorities early ensures that you understand any potential heritage restrictions that may apply to your property, allowing you to secure the necessary permits and plan your renovation budget effectively despite the missing register metrics.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
2824 Vicques · about 0 km
Buchwalder Sàrl in Vicques has specialized in the installation, repair, and renovation of heating and sanitary systems since 1966.
buchwalder-sarl.ch2824 Vicques · about 0 km
Gyger Haustechnik specializes in sanitary installations, heating systems, bathroom renovations, and tiling work.
gyger-co.ch2824 Vicques · about 0 km
Specialist since 1968 in sanitary installations, heating (gas, oil, wood, renewable energy), and tinsmithing with 24/7 emergency repair service.
sanit.ch2832 Rebeuvelier · about 3.5 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
These rules apply across the whole canton, not only in this town.
Fossil heating rules
Source : edj.ch
Tax deductions
Source : S0