Heat pump installation · Haute-Sorne

Heat pump installation in Haute-Sorne

Indicative price, tips, grants and companies for your project in Haute-Sorne (Jura).
Heat pump installation – Haute-Sorne

At a glance

Typical budget
CHF 37'800 – CHF 70'500
Midpoint
CHF 52'900
Grants found
1
Nearby companies
4

Worked examples in Haute-Sorne

Small project

CHF 30'000 – CHF 54'800

Typical project

CHF 37'800 – CHF 70'500

Large project

CHF 49'600 – CHF 93'900

ProjectQuantityLowHigh
Small project80 m²CHF 30'000CHF 54'800
Typical project160 m²CHF 37'800CHF 70'500
Large project280 m²CHF 49'600CHF 93'900

Computed with our estimator for Haute-Sorne (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'200 (40 %)
  • Materials : CHF 26'500 (50 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Jura

Amounts per current cantonal schedule.

The canton of Jura supports replacing fossil heating with heat pumps.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Haute-Sorne's housing stock in figures

The federal building register lists 2'180 residential buildings with 3'704 dwellings in Haute-Sorne. 61% were built before 1980, before serious insulation standards, and 48% are still heated with oil or gas.

With 48% fossil heating and 22.6% electrically heated hot water, many buildings in Haute-Sorne will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

61 %built before 1980
48 %heated by oil or gas
22.6 %electric hot water
6.7 %with declared solar thermal

Age of residential buildings

  • Before 191916 %
  • 1919–19458 %
  • 1946–196016 %
  • 1961–197012 %
  • 1971–19809 %
  • 1981–199010 %
  • 1991–20009 %
  • 2001–20106 %
  • Since 201113 %

Main heating energy

  • Heating oil48 %
  • Heat pump34 %
  • Wood12 %
  • Electricity5 %

Heating and hot water: which energies?

EnergyHeatingHot water
Heating oil48 %45.8 %
Heat pump34 %19.1 %
Electricity5 %22.6 %
Wood12 %6.5 %
Solar thermal0 %4.3 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)51.7 %
  • Heat pump33.6 %
  • Stove6.1 %
  • Central electric heating5.1 %
  • Condensing boiler2.2 %
  • Standard boiler0.5 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation plans in Haute-Sorne, the official RegBL figures provide essential guidance. With 9 buildings officially protected, you must contact municipal authorities early to discuss permit requirements. Regarding building volume, the data shows a median of 550 m3 across 1714 houses, though coverage is partial with only 3 measurements following the SIA 416 standard. These figures help homeowners estimate the scale of necessary insulation or heating upgrades. Please note that data availability is limited, so we recommend careful on-site assessment to ensure your renovation project aligns accurately with the specific characteristics of your property.

9
buildings flagged as protected
status known for 179 of 2'180 buildings; check with the municipality
550 m³
median house volume (SIA 416)
measured for 3 of 1'714 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Aquabateq Sàrl

2856 Boécourt · about 2.8 km

Aquabateq Sàrl is a technical design office specializing in the planning of sanitary, heating, ventilation, and air conditioning installations in the Jura arc region.

aquabateq.ch

Rolf Gehrig

2855 Glovelier · about 4.5 km

Founded in 1993 and based in Glovelier, Rolf Gehrig carries out heating and sanitary installation work throughout the canton of Jura and the Bernese Jura.

rolfgehrig.ch

ISSAjura SA

2800 Delémont · about 8.1 km

Technical insulation specialist since 1973, ISSA SA provides solutions for thermal insulation, heating, ventilation, and acoustic protection.

issajura.ch

Swissclim Sàrl

2800 Delémont · about 8.1 km

Swissclim Sàrl in Delémont specializes in the installation of air conditioning, refrigeration, dehumidification systems, and wine cellars.

swissclim.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Jura

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : La modification de l'ordonnance permettant le remplacement des chaudières à gaz sous certaines conditions est le résultat d'une motion parlementaire. Le gestionnaire de réseau de gaz valide le remplacement et s'engage à fournir les garanties d'origine. (Source S2)
  • Legal basis : Ordonnance portant application de la loi sur l'énergie (Ordonnance sur l'énergie, OEn)
  • In force since : 1er avril 2026 (pour la modification concernant le remplacement des chaudières à gaz) (Source S2)
  • Heating replacement : Dès le 1er avril 2026, il est possible de remplacer une chaudière à gaz existante par une nouvelle chaudière à gaz, à la condition de couvrir au moins 20% des besoins énergétiques prévisibles pour le chauffage et la production d’eau chaude sanitaire avec du biométhane ou un autre gaz renouvelable. (Source S2)
  • Renewable share required : Au moins 20% des besoins en chauffage et eau chaude sanitaire doivent être couverts par du biométhane ou un autre gaz renouvelable provenant d’installations situées dans le Canton du Jura et certifié par des garanties d’origine reconnues, en cas de remplacement d'une chaudière à gaz par une nouvelle. (Source S2)

Source : edj.ch

Tax deductions

  • Flat rate deduction : 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans)
  • Maintenance costs : forfaitaire 10 % du rendement brut (ou 20 % si immeuble de plus de 10 ans) ou effectifs
  • Energy investments : Dépenses pour l'économie d'énergie sont déductibles en tant que frais effectifs.

Source : S0

Other works in Haute-Sorne

Heat pump installation in nearby towns