Solar PV — one-off payment (Jura)
Based on installed capacity.
Federal one-off payment for PV in the canton of Jura.
www.pronovo.chSolar panels · Haute-Sorne

At a glance
Small project
CHF 8'900 – CHF 16'900
Typical project
CHF 16'500 – CHF 29'900
Large project
CHF 28'500 – CHF 50'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 8'900 | CHF 16'900 | CHF 2'500 |
| Typical project | 10 kWc | CHF 16'500 | CHF 29'900 | CHF 2'300 |
| Large project | 18 kWc | CHF 28'500 | CHF 50'700 | CHF 2'100 |
Computed with our estimator for Haute-Sorne (regional factor included), standard finish. Only the project size changes.
Included
Not included
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Based on installed capacity.
Federal one-off payment for PV in the canton of Jura.
www.pronovo.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
The federal building register lists 2'180 residential buildings with 3'704 dwellings in Haute-Sorne. 61% were built before 1980, before serious insulation standards, and 48% are still heated with oil or gas.
Only 6.7% of residential buildings in Haute-Sorne report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 48 % | 45.8 % |
| Heat pump | 34 % | 19.1 % |
| Electricity | 5 % | 22.6 % |
| Wood | 12 % | 6.5 % |
| Solar thermal | 0 % | 4.3 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
10.1 % of buildings mix housing with shops or offices.
For your renovation plans in Haute-Sorne, the official RegBL figures provide essential guidance. With 9 buildings officially protected, you must contact municipal authorities early to discuss permit requirements. Regarding building volume, the data shows a median of 550 m3 across 1714 houses, though coverage is partial with only 3 measurements following the SIA 416 standard. These figures help homeowners estimate the scale of necessary insulation or heating upgrades. Please note that data availability is limited, so we recommend careful on-site assessment to ensure your renovation project aligns accurately with the specific characteristics of your property.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
2855 Glovelier · about 4.5 km
Électricité Tabourat SA is a family-owned company based in Glovelier, providing electrical installations and photovoltaic solutions for private customers, businesses and public bodies in the Jura since 1984.
tabourat.ch2852 Courtételle · about 5.8 km
Company specializing in the inspection, expertise, and auditing of electrical and photovoltaic installations in compliance with OIBT standards.
icc-controle.ch2800 Delémont · about 8.1 km
Construction and renovation company in Delémont, specializing in masonry, sanitary facilities, heating, and turnkey projects in the Jura region.
adsconstruction.ch2800 Delémont · about 8.1 km
360 Comte Entreprise Générale SA provides comprehensive construction and renovation services with a focus on energy efficiency and photovoltaic installations.
360-comtesa.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
These rules apply across the whole canton, not only in this town.
Tax deductions
Source : S0