Elevator installation or upgrade · Crissier

Elevator installation or upgrade in Crissier

Indicative price, tips, grants and companies for your project in Crissier (Vaud).
Elevator installation or upgrade – Crissier

At a glance

Typical budget
CHF 63'800 – CHF 157'500
Midpoint
CHF 104'000
Grants found
0
Nearby companies
4

Worked examples in Crissier

Small project

CHF 51'000 – CHF 126'000

Typical project

CHF 63'800 – CHF 157'500

Large project

CHF 89'300 – CHF 220'600

ProjectQuantityLowHigh
Small project3 CHF 51'000CHF 126'000
Typical project5 CHF 63'800CHF 157'500
Large project9 CHF 89'300CHF 220'600

Computed with our estimator for Crissier (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 41'600 (40 %)
  • Materials : CHF 52'000 (50 %)
  • Other costs : CHF 10'400 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Drive, car, landing doors and commissioning

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Building permit, special foundations, maintenance contract

Tips before you start

  • The number of stops and any new shaft are the main cost drivers.
  • Adding an elevator to an existing building requires a building permit.
  • Include the annual maintenance contract when comparing quotes.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Crissier's housing stock in figures

The federal building register lists 1'171 residential buildings with 5'009 dwellings in Crissier. 41% were built before 1980, before serious insulation standards, and 61% are still heated with oil or gas.

64% of buildings were built before 1990: an asbestos survey is then required before any demolition. A typical dwelling here measures 76 m².

41 %built before 1980
61 %heated by oil or gas
19.4 %electric hot water
8.1 %with declared solar thermal

Age of residential buildings

  • Before 19199 %
  • 1919–19457 %
  • 1946–19609 %
  • 1961–19706 %
  • 1971–198010 %
  • 1981–199023 %
  • 1991–200010 %
  • 2001–20107 %
  • Since 201118 %

Main heating energy

  • Gas36 %
  • Heating oil25 %
  • Heat pump15 %
  • Electricity14 %
  • Wood7 %
  • District heating3 %

Houses or apartment buildings?

  • Single-family houses56.4 %
  • Two-dwelling houses15.8 %
  • Apartment buildings (3+)27.8 %

10.8 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
113 m²
median dwelling area
76 m²

Renovations, heritage and volumes

For homeowners in Crissier, RegBL data is essential for planning renovations. With 363 buildings under heritage protection out of 477 known cases, contacting the municipality early regarding permits is highly recommended. The median house volume of 458 m3 for the 169 houses measured by the SIA 416 standard provides a baseline for estimating heating or insulation costs. Please note that data coverage is partial, as the heritage status remains unknown for 694 buildings, and a significant portion of the total housing stock was not measured using the specified standard, which may impact your project assessment.

363
buildings flagged as protected
status known for 477 of 1'171 buildings; check with the municipality
458 m³
median house volume (SIA 416)
measured for 169 of 660 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

RealElec SA succursale Villars-Ste-Croix

1029 Villars-Ste-Croix · about 1.6 km

General electricity company specializing in installations, lighting, home automation, and technical connections such as elevators.

real-elec.ch

AS Ascenseurs SA

1052 Mont-sur-Lausanne · about 5.1 km

AS Aufzüge provides planning, construction, maintenance, and repair of passenger, freight, and small goods elevators throughout Switzerland.

lift.ch

Delta Türsysteme AG

1027 Lonay · about 5.5 km

Delta Türsysteme AG designs and installs high-end technical door and wall solutions, including fire protection, acoustics, security, and heritage restoration.

deltatueren.ch

Contour Gestion de projets SA

1003 Lausanne · about 5.8 km

Swiss consulting firm specializing in project management, construction fiduciary services, and site development for complex real estate projects.

contourprojets.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)