Facade insulation — Valais
Contribution per m² depending on requirements met.
Valais support for envelope insulation via the Buildings Programme.
www.leprogrammebatiments.chRoof renovation · Fully

At a glance
Small project
CHF 16'400 – CHF 37'600
Typical project
CHF 29'700 – CHF 65'400
Large project
CHF 49'600 – CHF 107'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 16'400 | CHF 37'600 | CHF 400 |
| Typical project | 140 m² | CHF 29'700 | CHF 65'400 | CHF 300 |
| Large project | 245 m² | CHF 49'600 | CHF 107'200 | CHF 300 |
Computed with our estimator for Fully (regional factor included), standard finish. Only the project size changes.
Included
Not included
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Contribution per m² depending on requirements met.
Valais support for envelope insulation via the Buildings Programme.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
The federal building register lists 2'542 residential buildings with 4'720 dwellings in Fully. 42% were built before 1980, before serious insulation standards, and 21% are still heated with oil or gas.
Only 3.2% of residential buildings in Fully report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 21 % | 22.7 % |
| Heat pump | 46 % | 13.3 % |
| Electricity | 22 % | 58.8 % |
| Wood | 10 % | 1.4 % |
| Solar thermal | 0 % | 2.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
6.5 % of buildings mix housing with shops or offices.
For renovation projects in Fully, the median building volume of 767 m3 serves as a vital benchmark for scaling heating or insulation upgrades according to the SIA 416 standard, though data coverage is limited across the 2542 total buildings. Regarding heritage protection, no specific protected status is recorded for the 164 buildings with known data. Because coverage is partial, we strongly recommend contacting the municipality early in your planning process. Engaging with local authorities ensures you identify any potential architectural constraints or historical requirements that may affect your permits or the scope of your renovation work.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1926 Fully · about 0 km
DM Bois SA specializes in construction, interior fitting, and wooden building renovation.
dmcharpente.ch1926 Fully · about 0 km
General renovation company in Carouge specializing in full renovations, painting, and multi-trade project management since 1998.
bati-renov.ch1906 Charrat · about 4.4 km
The company Charpenteplus Schwery Sàrl in Charrat specializes in carpentry, joinery, and roofing work.
charpenteplus.ch1906 Charrat · about 4.4 km
Nabibois SA, based in Charrat, carries out timber framing, joinery and property development activities.
nabibois.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.