Heat pump grant — Valais
Flat contributions per kW or per installation depending on technology.
Valais supports renewable heating via the Buildings Programme and additional cantonal grants.
www.leprogrammebatiments.chHeat pump installation · Fully

At a glance
Small project
CHF 32'900 – CHF 60'300
Typical project
CHF 41'600 – CHF 77'500
Large project
CHF 54'600 – CHF 103'300
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 32'900 | CHF 60'300 | CHF 600 |
| Typical project | 160 m² | CHF 41'600 | CHF 77'500 | CHF 400 |
| Large project | 280 m² | CHF 54'600 | CHF 103'300 | CHF 300 |
Computed with our estimator for Fully (regional factor included), standard finish. Only the project size changes.
Included
Not included
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Flat contributions per kW or per installation depending on technology.
Valais supports renewable heating via the Buildings Programme and additional cantonal grants.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
The federal building register lists 2'542 residential buildings with 4'720 dwellings in Fully. 42% were built before 1980, before serious insulation standards, and 21% are still heated with oil or gas.
With 21% fossil heating and 58.8% electrically heated hot water, many buildings in Fully will need a new system. Planning ahead avoids deciding under pressure after a breakdown.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 21 % | 22.7 % |
| Heat pump | 46 % | 13.3 % |
| Electricity | 22 % | 58.8 % |
| Wood | 10 % | 1.4 % |
| Solar thermal | 0 % | 2.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For renovation projects in Fully, the median building volume of 767 m3 serves as a vital benchmark for scaling heating or insulation upgrades according to the SIA 416 standard, though data coverage is limited across the 2542 total buildings. Regarding heritage protection, no specific protected status is recorded for the 164 buildings with known data. Because coverage is partial, we strongly recommend contacting the municipality early in your planning process. Engaging with local authorities ensures you identify any potential architectural constraints or historical requirements that may affect your permits or the scope of your renovation work.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1926 Fully · about 0 km
General renovation company in Carouge specializing in full renovations, painting, and multi-trade project management since 1998.
bati-renov.ch1926 Fully · about 0 km
Léonard Roduit Sàrl specializes in the installation, maintenance, and repair of sanitary equipment, heating systems, heat pumps, and ventilation.
leonard-roduit.ch1926 Fully · about 0 km
Valais-based specialist since 1970 in electrical installations, Stiebel Eltron heat pumps, photovoltaic, and solar thermal systems.
pellouchoud.ch1913 Saillon · about 5.3 km
Valais-based company specializing in photovoltaics, electrical installations, heat pumps, and household appliance sales for residential clients.
setelec.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.