Home solar battery · Gland

Home solar battery in Gland

Indicative price, tips, grants and companies for your project in Gland (Vaud).
Home solar battery – Gland

At a glance

Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4

Worked examples in Gland

Small project

CHF 4'400 – CHF 10'000

Typical project

CHF 7'900 – CHF 16'900

Large project

CHF 13'600 – CHF 28'000

ProjectQuantityLowHigh
Small project5 kWhCHF 4'400CHF 10'000
Typical project10 kWhCHF 7'900CHF 16'900
Large project18 kWhCHF 13'600CHF 28'000

Computed with our estimator for Gland (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'300 (20 %)
  • Materials : CHF 8'100 (70 %)
  • Other costs : CHF 1'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Gland's housing stock in figures

The federal building register lists 1'154 residential buildings with 6'258 dwellings in Gland. 36% were built before 1980, before serious insulation standards, and 70% are still heated with oil or gas.

Only 12.7% of residential buildings in Gland report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

36 %built before 1980
70 %heated by oil or gas
8.6 %electric hot water
12.7 %with declared solar thermal

Age of residential buildings

  • Before 19196 %
  • 1919–19456 %
  • 1946–19606 %
  • 1961–19706 %
  • 1971–198012 %
  • 1981–199015 %
  • 1991–200021 %
  • 2001–201015 %
  • Since 201113 %

Main heating energy

  • Gas48 %
  • Heating oil22 %
  • Heat pump18 %
  • Electricity6 %
  • District heating4 %
  • Wood2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas48 %45.2 %
Heating oil22 %22.4 %
District heating4 %3.1 %
Heat pump18 %6.2 %
Electricity6 %8.6 %
Wood2 %3.1 %
Solar thermal0 %10.8 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)51.9 %
  • Heat pump18 %
  • Condensing boiler13.2 %
  • Standard boiler6.3 %
  • Central electric heating5.5 %
  • Heat exchanger (district)4.3 %
  • Direct electric heaters0.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses58.3 %
  • Two-dwelling houses7.5 %
  • Apartment buildings (3+)34.1 %

10.8 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
125 m²
median dwelling area
88 m²

Renovations, heritage and volumes

Planning a renovation in Gland requires reviewing official RegBL data. Among 1154 buildings, 489 are under heritage protection, necessitating early consultation with municipal authorities for permit acquisition; however, data coverage is partial with 621 buildings unknown. Regarding scale, the median house volume is 890 m3 based on the SIA 416 standard for 139 measured buildings. This figure is vital for estimating heating and insulation work requirements. As volume data is unavailable for 534 buildings, we advise verifying specific structural dimensions on-site to ensure your renovation cost estimations remain accurate throughout the planning and execution phases.

489
buildings flagged as protected
status known for 533 of 1'154 buildings; check with the municipality
890 m³
median house volume (SIA 416)
measured for 139 of 673 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Rosset solutions énergétiques Sàrl

1196 Gland · about 0 km

Company specializing in energy solutions, photovoltaic installations, CECB audits, and electrical compliance in Gland.

rosset-se.ch

AFM ENERGIE VAUD SA

1196 Gland · about 0 km

Gland-based company specializing in heat pumps, photovoltaics, solar thermal, and sanitary installations in the Canton of Vaud.

afm-energie-vaud.ch

STG ENERGY SA

1260 Nyon · about 5.3 km

Swiss specialist in energy solutions: photovoltaics, heat pumps, solar batteries, charging stations, and sanitary installations.

stg-energy.ch

Louis Bally et fils S.A.

1260 Nyon · about 5.3 km

Louis Bally et fils S.A. is an electrical contractor serving the Nyon and Rolle region, installing photovoltaic systems and offering battery storage and energy management solutions.

electricitebally.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Gland

Home solar battery in nearby towns