Solar panels · Gland

Solar panels in Gland

Indicative price, tips, grants and companies for your project in Gland (Vaud).
Solar panels – Gland

At a glance

Typical budget
CHF 18'100 – CHF 32'900
Midpoint
CHF 24'800
Grants found
1
Nearby companies
4

Worked examples in Gland

Small project

CHF 9'800 – CHF 18'500

Typical project

CHF 18'100 – CHF 32'900

Large project

CHF 31'400 – CHF 55'800

ProjectQuantityLowHigh
Small project5 kWcCHF 9'800CHF 18'500
Typical project10 kWcCHF 18'100CHF 32'900
Large project18 kWcCHF 31'400CHF 55'800

Computed with our estimator for Gland (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'700 (35 %)
  • Materials : CHF 13'700 (55 %)
  • Other costs : CHF 2'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar PV — one-off payment and Vaud support

One-off payment calculated on installed capacity (kWp).

Federal one-off payment for PV installations, sometimes topped up by cantonal or municipal grants.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Gland's housing stock in figures

The federal building register lists 1'154 residential buildings with 6'258 dwellings in Gland. 36% were built before 1980, before serious insulation standards, and 70% are still heated with oil or gas.

Only 12.7% of residential buildings in Gland report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

36 %built before 1980
70 %heated by oil or gas
8.6 %electric hot water
12.7 %with declared solar thermal

Age of residential buildings

  • Before 19196 %
  • 1919–19456 %
  • 1946–19606 %
  • 1961–19706 %
  • 1971–198012 %
  • 1981–199015 %
  • 1991–200021 %
  • 2001–201015 %
  • Since 201113 %

Main heating energy

  • Gas48 %
  • Heating oil22 %
  • Heat pump18 %
  • Electricity6 %
  • District heating4 %
  • Wood2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas48 %45.2 %
Heating oil22 %22.4 %
District heating4 %3.1 %
Heat pump18 %6.2 %
Electricity6 %8.6 %
Wood2 %3.1 %
Solar thermal0 %10.8 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)51.9 %
  • Heat pump18 %
  • Condensing boiler13.2 %
  • Standard boiler6.3 %
  • Central electric heating5.5 %
  • Heat exchanger (district)4.3 %
  • Direct electric heaters0.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses58.3 %
  • Two-dwelling houses7.5 %
  • Apartment buildings (3+)34.1 %

10.8 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
125 m²
median dwelling area
88 m²

Renovations, heritage and volumes

Planning a renovation in Gland requires reviewing official RegBL data. Among 1154 buildings, 489 are under heritage protection, necessitating early consultation with municipal authorities for permit acquisition; however, data coverage is partial with 621 buildings unknown. Regarding scale, the median house volume is 890 m3 based on the SIA 416 standard for 139 measured buildings. This figure is vital for estimating heating and insulation work requirements. As volume data is unavailable for 534 buildings, we advise verifying specific structural dimensions on-site to ensure your renovation cost estimations remain accurate throughout the planning and execution phases.

489
buildings flagged as protected
status known for 533 of 1'154 buildings; check with the municipality
890 m³
median house volume (SIA 416)
measured for 139 of 673 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Toiture Willy Goncerut S.A.

1196 Gland · about 0 km

Building envelope specialist in Gland: tinsmithing, roofing, facade insulation, Velux windows, and photovoltaic installations.

toiture-sa.ch

AFM ENERGIE VAUD SA

1196 Gland · about 0 km

Gland-based company specializing in heat pumps, photovoltaics, solar thermal, and sanitary installations in the Canton of Vaud.

afm-energie-vaud.ch

Rosset solutions énergétiques Sàrl

1196 Gland · about 0 km

Company specializing in energy solutions, photovoltaic installations, CECB audits, and electrical compliance in Gland.

rosset-se.ch

Cauderay Electrotecnic Léman S.A.

1196 Gland · about 0 km

Based in Gland, Cauderay Electrotecnic Léman S.A. carries out electrical and photovoltaic installations, renovations, troubleshooting and upgrades to comply with Swiss low-voltage installation regulations.

electricite-cel.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Gland

Solar panels in nearby towns