Solar panels · Le Locle

Photovoltaic solar panels in Le Locle

Switching to solar energy is a key step for property owners in Le Locle, a municipality located at an altitude of 921 meters with harsh winters. This guide details the technical and administrative aspects necessary to succeed in your energy transition project.
Solar panels – Le Locle

Worked examples in Le Locle

Small project

CHF 8'900 – CHF 16'900

Typical project

CHF 16'500 – CHF 29'900

Large project

CHF 28'500 – CHF 50'700

Computed with our estimator for Le Locle (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 7'900 (35 %)
  • Materials : CHF 12'400 (55 %)
  • Other costs : CHF 2'300 (10 %)

Why and when to undertake these works in Le Locle

2 °C. These characteristics lead to high energy needs, with approximately 4007 Kj/year of heating degree days. Installing photovoltaic panels allows you to offset this significant consumption by producing renewable energy locally.

With an annual global irradiation of 1302 kWh/m²/year, the production potential remains significant despite the harsh mountain climate.

The best time to undertake this work is ideally during a planned roof renovation. By synchronizing the replacement of tiles with the installation of panels, you optimize labor costs and secure the tightness of your building before winter.

Since profitability depends mainly on the share of electricity consumed on-site, a well-thought-out system helps to stabilize your expenses against heating needs during the coldest months.

Anticipating the project allows for proper preparation of the application for the federal single remuneration from Pronovo, an essential support for reducing your initial investment.

Technical choices that influence the project

The success of a solar installation relies on technical choices adapted to your roof. The yield depends on the inclination and orientation, with a local estimate of about 1146 kWh/kWc/year for a roof facing south with a slope of about 30°.

There are different types of materials : monocrystalline panels, widely used for their efficiency, and building-integrated solutions. The choice of range will depend on your objectives: maximizing self-consumption or selling the surplus to the grid.

Mounting systems must be robust to withstand the region's weather specifics. Inverters, responsible for converting direct current into alternating current, are also crucial and their choice influences the durability of the installation.

It is advisable to discuss with a professional installer the various available technologies to evaluate the relationship between investment and expected production.

Profitability depends mainly on the share of electricity consumed on-site; it is therefore wise to consider, according to your consumption profile, energy management or storage solutions to optimize every kilowatt-hour produced by your systems.

Specifics of the local building stock according to the era of construction

The building stock of Le Locle presents challenges due to its age and architecture. For buildings constructed before 1990, it is imperative to check for the potential presence of asbestos in roofing materials before any intervention.

Energy renovation works, such as thermal insulation of the roof, should ideally precede or accompany the installation of photovoltaic panels.

If your roof is not insulated according to current standards, a solar installation will not solve the structural heat losses, making bringing the envelope up to standard a priority.

Regarding networks, it must be ensured that the house's electrical panel supports the injection of solar power. Historic buildings sometimes impose constraints on the placement of sensors, requiring careful examination. Deducing investment costs to save energy is possible, but requires clear invoicing.

If you carry out maintenance work, a distribution by type is required according to a precise catalog to distinguish between improvement and simple maintenance.

Consult the municipal urban planning services to obtain documents regarding specific constraints on your building, in order to avoid any surprises when planning your solar installation.

Authorizations, rules, and heritage in Le Locle

In Le Locle, as in the entire canton of Neuchâtel, the procedure for installing solar panels is simplified. For so-called "sufficiently adapted" installations placed on a roof within the building zone, a simple notification procedure to the competent municipal authority is sufficient.

This process replaces the classic building permit, greatly facilitating the realization of your project. It is recommended to submit your complete file about twenty days before the scheduled start of the work.

This rule applies as long as the building is not located in a zone or object protected by cantonal law, which would require more specific authorizations.

As the local heritage is rich, the municipal urban planning service makes specific documents and procedures available. Before starting your procedures, contact these services to check the exact situation of your plot.

They will be able to guide you on any aesthetic or heritage constraints that could influence the choice of equipment, such as color or integration of the panels.

Transparency with local authorities from the design phase is the best way to validate your project without unnecessary delay, taking advantage of the simplified procedures for solar installations well-adapted to the existing building.

Financial aid and taxation

Investment in photovoltaics benefits from support mechanisms and advantageous tax measures at the cantonal and federal levels. The federal single remuneration (Pronovo) is the main aid for small solar installations. This subsidy significantly reduces your initial investment.

It is crucial to undertake the steps before the start of the work to guarantee your eligibility. Regarding taxation, investments aimed at saving energy are tax-deductible.

If these costs cannot be fully deducted in the billing year (year N) without generating a negative net income, they can be carried forward to the two following fiscal years (N+1 and N+2).

You have the choice, for each fiscal period and each building, between deducting actual costs and the flat-rate deduction. If you opt for the deduction of actual costs, be aware that a breakdown by nature is necessary if your work includes maintenance and improvement.

Note that if costs are carried forward, the flat-rate deduction will not be possible for the affected building during those years. The tax office determines the carry-forward costs officially. This rigorous management allows you to optimize your tax burden while financing your energy savings over the long term.

Ensure you keep all detailed invoices to justify your deductions to the cantonal tax authority.

Calendar: Typical site workflow

The realization of a solar project in Le Locle must take into account seasonal constraints due to the altitude and 107 days of annual frost. It is preferable to plan the work outside of extreme cold, ideally between spring and early autumn, to ensure safe working conditions and optimal installation.

The typical process begins with a technical assessment followed by the application for the federal single remuneration. Once the aids are validated and quotes accepted, you notify the municipal authorities twenty days before the intervention.

Once the authorization or absence of opposition is confirmed, the site can begin. It generally includes the installation of load-bearing structures on the roof, mounting the photovoltaic panels, installing the inverter, and then connecting to the domestic electrical grid.

A testing phase is essential before the final commissioning to verify the good performance of the installation. Respecting the schedule is essential to avoid delays related to mountain weather, frequent at 921 meters altitude.

Consistent planning, starting several months in advance, allows for finalizing the installation in the best possible climatic conditions, thus guaranteeing the durability and efficiency of your solar equipment against the Neuchâtel climate.

Common errors to avoid and checklist before requesting quotes

To ensure the success of your project, avoid neglecting the structural condition of your roof before installing the panels. It is also a mistake not to anticipate the administrative steps for the Pronovo single remuneration before starting the work.

Do not settle for a single quote and always check if the company is specialized in local solar installations. Forgetting to contact the urban planning service beforehand is a classic mistake that can delay your project.

Checklist before requesting quotes : check if your roof is in good general condition, ensure you know the age of your electrical installations, examine your actual annual electricity consumption to correctly size the future installation, confirm the compatibility of your roof with municipal constraints, ask each installer for a clear simulation of the expected production, check the possibilities of tax deferral of costs, and ensure you understand how self-consumption works to make your investment profitable.

A sufficiently adapted roof installation is often subject to a simple notification, so check this possibility for your specific case.

Grants and subsidies

Canton

Solar PV — one-off payment (Neuchâtel)

Based on installed capacity.

Federal one-off payment for PV, applicable in the canton of Neuchâtel.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Companies in the area

Prétôt S.A.

2400 Le Locle · about 0 km

Prétôt S.A., based in Le Locle, carries out roofing and sheet metal work, roof maintenance and renovation, sanitary installations and solar panel installation.

pretotsa.ch

FRANCHON Steeve Electricité Sàrl

2400 Le Locle · about 0 km

Electrical contractor in Le Locle offering fitted kitchen sales and installation, household appliances and photovoltaic panels.

franchon.ch

Infrasolar Sàrl

2400 Le Locle · about 0 km

Infrasolar Sàrl specializes in the design, installation, and maintenance of solar photovoltaic systems in the Jura region.

infrasolar.org

Schneider Electricité S.A. succursale du Locle

2400 Le Locle · about 0 km

Schneider Electricité S.A. provides general electrical services, home automation, and photovoltaic installations.

schneider-electricitesa.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

What financial aid can I get in Le Locle?

You can request the federal single remuneration from Pronovo for small installations. The amount depends on the installed power.

Is a building permit required for my solar panels?

A simple notification procedure to the authorities is generally sufficient for sufficiently adapted roof solar installations.

Can I deduct the installation costs from my taxes?

Yes, investments aimed at saving energy are deductible, with the possibility of carrying forward the costs over two years if necessary.

What is the best time to install in Le Locle?

It is better to act between spring and early autumn to avoid climatic constraints related to the many days of frost.

How to optimize the profitability of my installation?

Profitability depends mainly on the share of electricity consumed on-site. Prioritize immediate self-consumption.

Should I insulate my roof before installing panels?

Yes, it is highly recommended to bring the insulation up to standard before or during the installation of panels to reduce your heating needs.

Are there constraints related to heritage?

As Le Locle has a rich heritage, always contact urban planning to verify if your building is protected before any project.

Useful local data

Estimated solar yield — 1'146 kWh/kWc/an (toit ~30° sud, PR 0.8, estimation)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · estimate

Altitude — 921 m

Source : swisstopo – service d'altitude (MNT)

Heating degree days — 4'007 Kj/an (20/12 °C)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Frost days — 107 jours/an

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Solar irradiation — 1'302 kWh/m²/an (horizontal)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Winter design temperature — -11.2 °C (1er percentile des minimales)

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Mean temperature — 7.8 °C

Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)

Heritage

  • Note : Le service communal d’urbanisme met à disposition les procédures et documents relatifs aux installations solaires. Consulter le service pour le bâtiment concerné plutôt que supposer une règle unique pour toute la ville.

Source : Ville du Locle

PermitsCanton

  • Competent authority : autorité communale ou cantonale compétente (pour l'annonce solaire)
  • Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
  • Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.

Source : azprojet.ch

Tax deductionsCanton

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf

Other works in Le Locle

Solar panels in nearby towns