Heat pump installation · Marly

Heat pump installation in Marly

Indicative price, tips, grants and companies for your project in Marly (Fribourg).
Heat pump installation – Marly

At a glance

Typical budget
CHF 41'600 – CHF 77'500
Midpoint
CHF 58'200
Grants found
1
Nearby companies
4

Worked examples in Marly

Small project

CHF 32'900 – CHF 60'300

Typical project

CHF 41'600 – CHF 77'500

Large project

CHF 54'600 – CHF 103'300

ProjectQuantityLowHigh
Small project80 m²CHF 32'900CHF 60'300
Typical project160 m²CHF 41'600CHF 77'500
Large project280 m²CHF 54'600CHF 103'300

Computed with our estimator for Marly (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 23'300 (40 %)
  • Materials : CHF 29'100 (50 %)
  • Other costs : CHF 5'800 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Fribourg

Flat amounts depending on heat pump type (air-water, ground-source).

Support from the canton of Fribourg and the Buildings Programme for heat pumps replacing fossil fuels.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Marly's housing stock in figures

The federal building register lists 1'415 residential buildings with 4'650 dwellings in Marly. 44% were built before 1980, before serious insulation standards, and 39% are still heated with oil or gas.

With 39% fossil heating and 31.8% electrically heated hot water, many buildings in Marly will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

44 %built before 1980
39 %heated by oil or gas
31.8 %electric hot water
2.3 %with declared solar thermal

Age of residential buildings

  • Before 19193 %
  • 1919–19453 %
  • 1946–19607 %
  • 1961–197014 %
  • 1971–198017 %
  • 1981–199020 %
  • 1991–200013 %
  • 2001–20109 %
  • Since 201113 %

Main heating energy

  • Heat pump43 %
  • Heating oil28 %
  • Gas11 %
  • Electricity11 %
  • District heating5 %
  • Wood2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas11 %13.4 %
Heating oil28 %28.9 %
District heating5 %2.9 %
Heat pump43 %20.4 %
Electricity11 %31.8 %
Wood2 %0.9 %
Solar thermal0 %1.5 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Heat pump42.8 %
  • Boiler (unspecified)38 %
  • Central electric heating11 %
  • Heat exchanger (district)4.7 %
  • Condensing boiler2.4 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation projects in Marly, official RegBL data provides vital insights. With 17 buildings under heritage protection, contacting the municipality early is essential to secure necessary permits. As renovation year records are unavailable, focus your planning on the building volume, which shows a median of 919 m3 for 9 homes measured via the SIA 416 standard. Please note that data coverage for volume is partial. Despite this, understanding your home's scale is a critical step in accurately estimating the scope of heating and insulation work required for your upcoming renovation project.

17
buildings flagged as protected
status known for 72 of 1'415 buildings; check with the municipality
919 m³
median house volume (SIA 416)
measured for 9 of 897 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

SM Energie SA

1723 Marly · about 0 km

SM Energie SA specializes in carrying out heating and sanitary installation works.

smenergie.ch

WAB Technique S.à r. l.

1723 Marly · about 0 km

WAB Technique S.à r. l., based in Marly, designs and installs heating, ventilation and air conditioning systems and modernises heating systems.

wab-technique.ch

Helvetiqua SA

1723 Marly · about 0 km

French-Swiss specialist in energy renovation: installation of photovoltaic panels, heat pumps, batteries, and home insulation.

helvetiqua.ch

Hayoz & Brulhart SA

1723 Marly · about 0 km

Founded in 1981 and based in Marly, Hayoz & Brulhart SA provides plumbing, heating and solar installations, as well as sheet metal work and roofing for new builds, renovations and repairs.

hayoz-brulhart.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Fribourg

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : Les exigences spécifiques s'appliquent aux bâtiments existants en cas de remplacement de chauffages à énergies fossiles ou électriques. Ces exigences ne s'appliquent pas si le remplacement est dû à un événement imprévisible et que l'installation initiale a moins de 15 ans, ou si des mesures d'efficacité énergétique ont été réalisées récemment pour un coût élevé, ou si le remplacement est pour un chauffage à bois déjà présent dans le même bâtiment ou sur la même parcelle, ou si l'autorité l'estime disproportionné. Les communes peuvent prévoir des exigences supplémentaires.
  • Legal basis : Règlement d'exécution de la loi cantonale sur l'énergie (RLE)
  • In force since : 1er janvier 2024
  • Heating replacement : En cas de remplacement d'une installation de chauffage ou d'eau chaude sanitaire fonctionnant aux énergies fossiles ou par des chauffages électriques, au moins 10 % de la chaleur nécessaire sont couverts par des énergies renouvelables ou par la chaleur à distance, ou des mesures permettant une économie de chaleur équivalente sont réalisées.
  • Renewable share required : 10 % de la chaleur nécessaire

Source : fr.ch

Tax deductions

  • Carry-forward : L'excédent des frais d'investissement en matière d'énergie, d'efficacité énergétique et de protection de l'environnement peut être reporté sur les deux périodes fiscales suivantes.
  • Flat rate deduction : 20% (pour immeubles de plus de 10 ans); 10% (pour immeubles de moins de 10 ans)
  • Maintenance costs : Au choix: soit déduction des frais effectifs, soit un forfait de 20% de la valeur locative (20% de l'état locatif ou du revenu brut des immeubles) pour les immeubles de plus de 10 ans. Pour les immeubles de moins de 10 ans, le forfait est de 10%.
  • Energy investments : Les investissements en matière d'énergie renouvelable, d'amélioration de l'efficacité énergétique et de protection de l'environnement, ainsi que les frais de démolition en vue d'une construction de remplacement, sont déductibles. Si les frais déductibles dépassent le revenu de l'immeuble pour la période fiscale courante, l'excédent peut être reporté sur les deux périodes fiscales suivantes.

Source : Administration Cantonale des Impôts du Canton de Fribourg