Home solar battery · Marly

Home solar battery in Marly

Indicative price, tips, grants and companies for your project in Marly (Fribourg).
Home solar battery – Marly

At a glance

Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4

Worked examples in Marly

Small project

CHF 4'400 – CHF 10'000

Typical project

CHF 7'900 – CHF 16'900

Large project

CHF 13'600 – CHF 28'000

ProjectQuantityLowHigh
Small project5 kWhCHF 4'400CHF 10'000
Typical project10 kWhCHF 7'900CHF 16'900
Large project18 kWhCHF 13'600CHF 28'000

Computed with our estimator for Marly (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'300 (20 %)
  • Materials : CHF 8'100 (70 %)
  • Other costs : CHF 1'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Marly's housing stock in figures

The federal building register lists 1'415 residential buildings with 4'650 dwellings in Marly. 44% were built before 1980, before serious insulation standards, and 39% are still heated with oil or gas.

Only 2.3% of residential buildings in Marly report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

44 %built before 1980
39 %heated by oil or gas
31.8 %electric hot water
2.3 %with declared solar thermal

Age of residential buildings

  • Before 19193 %
  • 1919–19453 %
  • 1946–19607 %
  • 1961–197014 %
  • 1971–198017 %
  • 1981–199020 %
  • 1991–200013 %
  • 2001–20109 %
  • Since 201113 %

Main heating energy

  • Heat pump43 %
  • Heating oil28 %
  • Gas11 %
  • Electricity11 %
  • District heating5 %
  • Wood2 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas11 %13.4 %
Heating oil28 %28.9 %
District heating5 %2.9 %
Heat pump43 %20.4 %
Electricity11 %31.8 %
Wood2 %0.9 %
Solar thermal0 %1.5 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Heat pump42.8 %
  • Boiler (unspecified)38 %
  • Central electric heating11 %
  • Heat exchanger (district)4.7 %
  • Condensing boiler2.4 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses63.4 %
  • Two-dwelling houses14 %
  • Apartment buildings (3+)22.6 %

5.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
136 m²
median dwelling area
91 m²

Renovations, heritage and volumes

For your renovation projects in Marly, official RegBL data provides vital insights. With 17 buildings under heritage protection, contacting the municipality early is essential to secure necessary permits. As renovation year records are unavailable, focus your planning on the building volume, which shows a median of 919 m3 for 9 homes measured via the SIA 416 standard. Please note that data coverage for volume is partial. Despite this, understanding your home's scale is a critical step in accurately estimating the scope of heating and insulation work required for your upcoming renovation project.

17
buildings flagged as protected
status known for 72 of 1'415 buildings; check with the municipality
919 m³
median house volume (SIA 416)
measured for 9 of 897 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Helvetiqua SA

1723 Marly · about 0 km

French-Swiss specialist in energy renovation: installation of photovoltaic panels, heat pumps, batteries, and home insulation.

helvetiqua.ch

LEXEL Sàrl

1700 Fribourg · about 3.6 km

Electrical engineering office in Fribourg specializing in inspection, compliance, electrical panels, and energy consulting.

lexel.ch

Solesa SA

1700 Fribourg · about 3.6 km

Solesa SA specializes in electrical installations and renewable energy systems, including consulting and maintenance in Fribourg.

solesa.com.ar

Fri Solar Sàrl

1700 Fribourg · about 3.6 km

Fri Solar Sàrl, based in Fribourg, specializes in the installation of photovoltaic systems and battery storage for both residential and commercial clients.

frisolar.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Fribourg

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Carry-forward : L'excédent des frais d'investissement en matière d'énergie, d'efficacité énergétique et de protection de l'environnement peut être reporté sur les deux périodes fiscales suivantes.
  • Flat rate deduction : 20% (pour immeubles de plus de 10 ans); 10% (pour immeubles de moins de 10 ans)
  • Maintenance costs : Au choix: soit déduction des frais effectifs, soit un forfait de 20% de la valeur locative (20% de l'état locatif ou du revenu brut des immeubles) pour les immeubles de plus de 10 ans. Pour les immeubles de moins de 10 ans, le forfait est de 10%.
  • Energy investments : Les investissements en matière d'énergie renouvelable, d'amélioration de l'efficacité énergétique et de protection de l'environnement, ainsi que les frais de démolition en vue d'une construction de remplacement, sont déductibles. Si les frais déductibles dépassent le revenu de l'immeuble pour la période fiscale courante, l'excédent peut être reporté sur les deux périodes fiscales suivantes.

Source : Administration Cantonale des Impôts du Canton de Fribourg

Other works in Marly

Home solar battery in nearby towns