Heat pump installation · Plan-les-Ouates

Heat pump installation in Plan-les-Ouates

Indicative price, tips, grants and companies for your project in Plan-les-Ouates (Geneva).
Heat pump installation – Plan-les-Ouates

At a glance

Typical budget
CHF 41'600 – CHF 77'500
Midpoint
CHF 58'200
Grants found
1
Nearby companies
4

Worked examples in Plan-les-Ouates

Small project

CHF 32'900 – CHF 60'300

Typical project

CHF 41'600 – CHF 77'500

Large project

CHF 54'600 – CHF 103'300

ProjectQuantityLowHigh
Small project80 m²CHF 32'900CHF 60'300
Typical project160 m²CHF 41'600CHF 77'500
Large project280 m²CHF 54'600CHF 103'300

Computed with our estimator for Plan-les-Ouates (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 23'300 (40 %)
  • Materials : CHF 29'100 (50 %)
  • Other costs : CHF 5'800 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Geneva

Flat rates and percentages depend on the replaced system; check with the cantonal energy office.

Geneva cantonal support for replacing oil or gas heating with renewable systems (heat pumps).

www.ge.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Companies in the area

Projet 24 SA

1228 Plan-les-Ouates · about 0 km

Projeco is a general contractor and real estate development company active in French-speaking Switzerland, specializing in new construction, renovation, and the development of complex real estate projects.

projeco.ch

MINO SA

1228 Plan-les-Ouates · about 0 km

MINO SA designs, installs and maintains heating systems, including heat pumps, as well as ventilation and air conditioning systems in French-speaking Switzerland.

mino.eu

Imeri Chauffage et Sanitaire Sàrl

1228 Plan-les-Ouates · about 0 km

Imeri Chauffage et Sanitaire Sàrl specializes in the installation and maintenance of heating systems, heat pumps, and sanitary facilities.

imeri-sarl.ch

Hälg & Co. AG, succursale de Plan-les-Ouates

1228 Plan-les-Ouates · about 0 km

Hälg & Co. AG provides specialized services in building technology, heating, building automation, and integrated facility management.

haelg.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Fossil heating rules

  • Note : Les exigences s'appliquent également aux nouvelles constructions, qui doivent être entièrement alimentées en chaleur renouvelable.
  • Legal basis : Loi sur l'énergie (Le)
  • In force since : 1er juin 2020
  • Heating replacement : En cas de remplacement d'une installation de production de chaleur (chauffage et/ou eau chaude sanitaire), 100% de la chaleur doit être d'origine renouvelable, à l'exception des cas où des contraintes techniques ou financières empêchent l'atteinte de cet objectif. Dans ces cas, un minimum de 20% d'énergie renouvelable est exigé, complété par des mesures compensatoires (consommation d'énergie, émissions de CO2 ou performances énergétiques globales).
  • Renewable share required : 100% (ou 20% avec mesures compensatoires si contraintes techniques/financières)

Source : État de Genève - Loi sur l'énergie (Le)

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève

Other works in Plan-les-Ouates

Heat pump installation in nearby towns