Koboi Démontage & Service Sàrl
2603 Péry · about 116.4 km
Company specialized in the dismantling, removal, and recycling of technical equipment such as elevators, heating, and ventilation systems.
kds.ecoElevator installation or upgrade · Rapperswil-Jona

At a glance
Small project
CHF 51'900 – CHF 128'300
Typical project
CHF 64'900 – CHF 160'400
Large project
CHF 90'900 – CHF 224'600
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 3 | CHF 51'900 | CHF 128'300 | CHF 28'200 |
| Typical project | 5 | CHF 64'900 | CHF 160'400 | CHF 21'200 |
| Large project | 9 | CHF 90'900 | CHF 224'600 | CHF 16'500 |
Computed with our estimator for Rapperswil-Jona (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Rapperswil-Jona, the federal building register lists 3'786 residential buildings and 14'034 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
53 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
42 % · Heat pump
This distribution describes recorded buildings, not your system's consumption or efficiency.
11 % of buildings mix housing with shops or offices.
For homeowners planning renovations in Rapperswil-Jona, official RegBL figures provide essential planning guidance. Regarding heritage protection, 78 buildings are identified as protected out of 403 known cases, making early coordination with municipal authorities regarding permits vital. The median building volume of 590 cubic meters, based on the SIA 416 standard, helps estimate the scale required for heating or insulation upgrades. Please note that data coverage is partial; only 3 buildings are measured under the SIA 416 standard, and there is no recorded information regarding renovation years for the 3786 total buildings registered in the municipality.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
The cost of an elevator depends on several technical variables. The number of stops served is the primary factor, as each additional level increases installation complexity.
Furthermore, creating a new shaft or adapting an existing structure represents a significant part of the total cost.
As a property owner, it is crucial to assess whether a modernization is sufficient or if a full installation is required to meet current safety and energy efficiency standards in the Canton of St. Gallen.
Analyzing the building structure is key to realistic budgeting.
It is advisable to contact the local municipal authorities early to understand specific planning requirements. Complete documentation, including technical drawings and load calculations, is mandatory.
Make sure to factor these administrative steps into your schedule to avoid delays in project execution and ensure a smooth process throughout the construction phase.
Once installation is complete, maintenance becomes a recurring expense. When comparing quotes, it is essential to include the annual maintenance contract in your budget. This contract ensures user safety and extends the lifespan of the equipment.
Clarify response times for breakdowns and the costs of spare parts. Good planning from the start helps manage long-term operating costs and prevents financial surprises related to technical upkeep, ensuring your investment remains protected for many years.
Budget planning is the most critical step. Beyond materials, budget for structural building adaptations and interior finishing. The choice of materials and elevator technology directly impacts the final price.
Use the RenoIndex estimator to receive a reliable cost estimate for Rapperswil-Jona and adjust your budget based on the results.
Rigorous planning will allow you to complete your project without stress, optimizing your property investment while meeting the comfort needs of all users.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2603 Péry · about 116.4 km
Company specialized in the dismantling, removal, and recycling of technical equipment such as elevators, heating, and ventilation systems.
kds.eco3900 Gamsen · about 121.8 km
AS Aufzüge AG specializes in the planning, installation, maintenance, and repair of passenger and freight elevators throughout Switzerland.
lift.ch1752 Villars-sur-Glâne · about 136.2 km
Otis manufactures, sells, installs, maintains and modernizes passenger and freight elevators and other equipment for transporting people or goods.
otis.com2340 Le Noirmont · about 141 km
Carpentry and woodworking company specializing in custom wood constructions, interior fittings, and CLT structures based in Le Noirmont.
edifice-bois.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
You must first check the technical feasibility of the installation and obtain a building permit. Then, use the RenoIndex simulator to get an accurate price range for your project in Rapperswil-Jona.
Yes, the number of stops is a major cost factor. The more floors the elevator serves, the more extensive the structural work and technical installation become, which increases the total amount of the work.
Yes, adding an elevator to an existing building mandatorily requires a building permit. We recommend consulting the relevant municipal services to confirm the specific local requirements in Rapperswil-Jona.
Compare the cost of equipment, installation fees, and especially the annual maintenance contract. Ensure the quotes cover all necessary structural adaptations for your project.