Fasel-Piller Gebäudehülle AG
1716 Plaffeien · about 27.9 km
Swiss company specializing in building services, tinsmithing, roofing, and solar installations for the building envelope.
faselpillerag.chSolar panels · Steffisburg

At a glance
Small project
CHF 9'100 – CHF 17'200
Typical project
CHF 16'800 – CHF 30'500
Large project
CHF 29'100 – CHF 51'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 9'100 | CHF 17'200 | CHF 2'600 |
| Typical project | 10 kWc | CHF 16'800 | CHF 30'500 | CHF 2'300 |
| Large project | 18 kWc | CHF 29'100 | CHF 51'700 | CHF 2'200 |
Computed with our estimator for Steffisburg (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Steffisburg, the federal building register lists 3'276 residential buildings and 8'355 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
60 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
27 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 25 % | 26.2 % |
| Heating oil | 27 % | 27.6 % |
| District heating | 16 % | 5.4 % |
| Heat pump | 24 % | 7.5 % |
| Electricity | 2 % | 26.9 % |
| Wood | 6 % | 3.9 % |
| Solar thermal | 0 % | 1.8 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
9.4 % of buildings mix housing with shops or offices.
For your renovation plans in Steffisburg, the federal building register data shows a median house volume of 964 m3, a key figure for scaling heating or insulation works, though this data is based on a partial sample. Regarding heritage protection, two out of 380 known buildings are officially listed as protected. If your property falls under this category, it is essential to contact the municipality early in your planning process to discuss permit requirements, as heritage preservation constraints can significantly impact both the scope and the overall cost of your planned renovation efforts.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1716 Plaffeien · about 27.9 km
Swiss company specializing in building services, tinsmithing, roofing, and solar installations for the building envelope.
faselpillerag.ch1656 Im Fang · about 34.9 km
Swiss company specializing in the inspection, compliance, and technical expertise of electrical and photovoltaic installations.
contrôles-électriques.ch1724 Le Mouret · about 35.2 km
Plomberie Ferblanterie Monney Sàrl specializes in sanitary installations, sheet metal and roofing work, as well as the installation of photovoltaic solar systems.
pfms.ch1723 Marly · about 35.8 km
French-Swiss specialist in energy renovation: installation of photovoltaic panels, heat pumps, batteries, and home insulation.
helvetiqua.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.