Solar panels · Biel/Bienne

Solar panels in Biel/Bienne

Indicative price, tips, grants and companies for your project in Biel/Bienne (Bern).
Solar panels – Biel/Bienne

At a glance

Typical budget
CHF 16'500 – CHF 29'900
Midpoint
CHF 22'600
Grants found
0
Nearby companies
4

Worked examples in Biel/Bienne

Small project

CHF 8'900 – CHF 16'900

Typical project

CHF 16'500 – CHF 29'900

Large project

CHF 28'500 – CHF 50'700

ProjectQuantityLowHigh
Small project5 kWcCHF 8'900CHF 16'900
Typical project10 kWcCHF 16'500CHF 29'900
Large project18 kWcCHF 28'500CHF 50'700

Computed with our estimator for Biel/Bienne (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 7'900 (35 %)
  • Materials : CHF 12'400 (55 %)
  • Other costs : CHF 2'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Biel/Bienne's housing stock in figures

In Biel/Bienne, the federal building register lists 6'314 residential buildings and 31'200 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

80 %built before 1980
83 %heated by oil or gas
23.6 %electric hot water
2.2 %with declared solar thermal

Age of residential buildings

80 % built before 1980

  • Before 191919 %
  • 1919–194528 %
  • 1946–196021 %
  • 1961–19708 %
  • 1971–19804 %
  • 1981–19905 %
  • 1991–20006 %
  • 2001–20105 %
  • Since 20114 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

58 % · Gas

  • Gas58 %
  • Heating oil25 %
  • Heat pump10 %
  • District heating4 %
  • Wood2 %
  • Electricity1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas58 %44.6 %
Heating oil25 %18.8 %
District heating4 %3.3 %
Heat pump10 %6.7 %
Electricity1 %23.6 %
Wood2 %1.1 %
Solar thermal0 %1.4 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)45.7 %
  • Standard boiler24.4 %
  • Condensing boiler14.8 %
  • Heat pump10.3 %
  • Heat exchanger (district)3.7 %
  • Central electric heating0.7 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses31.8 %
  • Two-dwelling houses8.7 %
  • Apartment buildings (3+)59.5 %

16.6 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
132 m²
median dwelling area
75 m²

Renovations, heritage and volumes

For renovation projects in Biel, official building register figures highlight that nine buildings are under heritage protection, necessitating early consultation with municipal authorities for permit requirements. Regarding building volume, data coverage is currently very limited, with only four buildings measured according to SIA 416 standards out of 2011 units, showing a median volume of 683.5 m3. Because this data is highly partial, homeowners must conduct their own professional site measurements. Accurate volume assessments remain crucial for planning the appropriate scale of your heating and insulation upgrades to ensure your renovation project meets all technical and regulatory standards.

9
buildings flagged as protected
status known for 54 of 6'314 buildings; check with the municipality
683.5 m³
median house volume (SIA 416)
measured for 4 of 2'011 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Villars Elektro Sàrl

2533 Evilard · about 0.9 km

Villars Elektro Sàrl in Evilard provides electrical installations for residential, industrial and commercial buildings, with services covering kitchen appliances, solar technology and charging stations.

villars-elektro.ch

AP-InTec Sàrl

2555 Brügg BE · about 3.3 km

AP-InTec Sàrl specializes in electrical installations, building automation, security systems, and the installation of photovoltaic solutions.

ap-intec.ch

Solar conseil Sàrl

2605 Sonceboz-Sombeval · about 6.7 km

Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.

solarconseil.ch

a Marca Toiture Sàrl

2732 Reconvilier · about 10.4 km

A Marca Toiture Sàrl is a company based in Reconvilier specializing in roofing, facade renovation, and the installation of photovoltaic panels.

amarca-toiture.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Biel/Bienne

Other works in Biel/Bienne

Solar panels in nearby towns