Eco6therm Sàrl
2832 Rebeuvelier · about 86.7 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Thalwil

At a glance
Small project
CHF 4'400 – CHF 10'200
Typical project
CHF 8'100 – CHF 17'200
Large project
CHF 13'900 – CHF 28'500
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'400 | CHF 10'200 | CHF 1'400 |
| Typical project | 10 kWh | CHF 8'100 | CHF 17'200 | CHF 1'200 |
| Large project | 18 kWh | CHF 13'900 | CHF 28'500 | CHF 1'100 |
Computed with our estimator for Thalwil (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Thalwil, the federal building register lists 2'342 residential buildings and 9'309 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
63 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
37 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 37 % | 40.8 % |
| Heating oil | 30 % | 26 % |
| District heating | 4 % | 5 % |
| Heat pump | 24 % | 8.9 % |
| Electricity | 3 % | 16 % |
| Wood | 1 % | 0.4 % |
| Solar thermal | 0 % | 1.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
11.2 % of buildings mix housing with shops or offices.
For homeowners planning renovations in Thalwil, official building register data provides crucial insights. With a median building volume of 800 m3 measured according to SIA 416 standards, owners can better estimate the scope of heating or insulation upgrades. Note that this volume data is only partially covered, representing 13 out of 1050 houses. We strongly recommend contacting the municipality early in your planning process to discuss your specific property requirements. By addressing these structural details before you begin, you ensure that your renovation budget is accurate and that your project aligns perfectly with local building standards.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 86.7 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 97.1 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2605 Sonceboz-Sombeval · about 105.3 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.ch2718 Lajoux JU · about 107.4 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.