At a glance

Typical budget
CHF 18'100 – CHF 32'900
Midpoint
CHF 24'800
Grants found
1
Nearby companies
4

Worked examples in Versoix

Small project

CHF 9'800 – CHF 18'500

Typical project

CHF 18'100 – CHF 32'900

Large project

CHF 31'400 – CHF 55'800

ProjectQuantityLowHigh
Small project5 kWcCHF 9'800CHF 18'500
Typical project10 kWcCHF 18'100CHF 32'900
Large project18 kWcCHF 31'400CHF 55'800

Computed with our estimator for Versoix (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'700 (35 %)
  • Materials : CHF 13'700 (55 %)
  • Other costs : CHF 2'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar PV — Geneva support

Variable additional grants; federal one-off payment by capacity.

Geneva strongly supports solar PV, with grants in addition to the federal one-off payment.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Versoix's housing stock in figures

The federal building register lists 1'406 residential buildings with 5'552 dwellings in Versoix. 51% were built before 1980, before serious insulation standards, and 74% are still heated with oil or gas.

Only 10.9% of residential buildings in Versoix report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

51 %built before 1980
74 %heated by oil or gas
9.1 %electric hot water
10.9 %with declared solar thermal

Age of residential buildings

  • Before 191914 %
  • 1919–19459 %
  • 1946–19609 %
  • 1961–197010 %
  • 1971–19809 %
  • 1981–199016 %
  • 1991–200013 %
  • 2001–201010 %
  • Since 201110 %

Main heating energy

  • Gas44 %
  • Heating oil30 %
  • Heat pump17 %
  • Electricity4 %
  • District heating3 %
  • Wood2 %
  • Solar thermal1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas44 %40 %
Heating oil30 %27.5 %
District heating3 %1 %
Heat pump17 %3.9 %
Electricity4 %9.1 %
Wood2 %1 %
Solar thermal1 %10.3 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)66.7 %
  • Heat pump16.8 %
  • Condensing boiler5.3 %
  • Standard boiler3.4 %
  • Heat exchanger (district)2.8 %
  • Direct electric heaters2.3 %
  • Central electric heating1.7 %
  • Stove0.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses67.1 %
  • Two-dwelling houses7.2 %
  • Apartment buildings (3+)25.7 %

10 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
118 m²
median dwelling area
90 m²

Renovations, heritage and volumes

For your renovation plans in Versoix, the official building register data provides limited insights due to partial coverage. Information regarding heritage protection status and the year of renovation is not currently recorded. Furthermore, building volume data, measured under the SIA 416 standard, lacks specific median values to guide your project scale. Given the absence of these figures, it is essential to contact the municipality directly. Engaging with local authorities early is the best way to obtain the precise technical details required for planning heating or insulation works and ensuring your renovation cost estimates are accurate.

0
buildings flagged as protected
status known for 22 of 1'406 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

AGROTHERM SA

1290 Versoix · about 0 km

AGROTHERM SA specializes in the installation of heating, plumbing, ventilation, and solar photovoltaic and thermal systems, while providing energy-related building renovation services.

agrotherm.ch

ONE Tech Energies Sàrl

1290 Versoix · about 0 km

ONE Tech Energies Sàrl, based in Versoix, provides plumbing, heating and ventilation installations, as well as heat pump, photovoltaic and solar thermal systems.

one-tech.ch

Probat Services Sàrl

1290 Versoix · about 0 km

Probat Services Sàrl is a general contractor based in Versoix offering renovation, painting, tiling, exterior landscaping, and photovoltaic installation services.

probatservices.ch

Husmann Electricité

1295 Mies-Tannay · about 2.4 km

Founded in 2003 in Mies-Tannay, Husmann Électricité & Services operates in electrical installations, telecommunications, and alternative and solar energy.

hes-services.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève

Other works in Versoix

Solar panels in nearby towns