Home solar battery · La Grande Béroche

Home solar battery in La Grande Béroche

Indicative price, tips, grants and companies for your project in La Grande Béroche (Neuchâtel).
Home solar battery – La Grande Béroche

At a glance

Typical budget
CHF 7'200 – CHF 15'400
Midpoint
CHF 10'500
Grants found
0
Nearby companies
4

Worked examples in La Grande Béroche

Small project

CHF 4'000 – CHF 9'100

Typical project

CHF 7'200 – CHF 15'400

Large project

CHF 12'400 – CHF 25'400

ProjectQuantityLowHigh
Small project5 kWhCHF 4'000CHF 9'100
Typical project10 kWhCHF 7'200CHF 15'400
Large project18 kWhCHF 12'400CHF 25'400

Computed with our estimator for La Grande Béroche (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'100 (20 %)
  • Materials : CHF 7'300 (70 %)
  • Other costs : CHF 1'100 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

La Grande Béroche's housing stock in figures

The federal building register lists 2'303 residential buildings with 4'929 dwellings in La Grande Béroche. 61% were built before 1980, before serious insulation standards, and 58% are still heated with oil or gas.

Only 15.6% of residential buildings in La Grande Béroche report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

61 %built before 1980
58 %heated by oil or gas
11.2 %electric hot water
15.6 %with declared solar thermal

Age of residential buildings

  • Before 191922 %
  • 1919–19459 %
  • 1946–19608 %
  • 1961–197011 %
  • 1971–198011 %
  • 1981–199013 %
  • 1991–20008 %
  • 2001–201010 %
  • Since 20117 %

Main heating energy

  • Heating oil46 %
  • Heat pump22 %
  • Gas12 %
  • Wood9 %
  • District heating5 %
  • Electricity4 %
  • Solar thermal3 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas12 %11.4 %
Heating oil46 %40.9 %
District heating5 %4.1 %
Heat pump22 %12.4 %
Electricity4 %11.2 %
Wood9 %5.2 %
Solar thermal3 %14.4 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)55.6 %
  • Heat pump21.6 %
  • Stove6 %
  • Condensing boiler5.2 %
  • Heat exchanger (district)4.4 %
  • Central electric heating3.8 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses67.3 %
  • Two-dwelling houses14.2 %
  • Apartment buildings (3+)18.5 %

10.3 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
132 m²
median dwelling area
90 m²

Renovations, heritage and volumes

When planning renovations in La Grande Béroche, the RegBL figures provide vital context. With 25 buildings identified under heritage protection, it is essential to contact the municipality early to navigate permit requirements. The median house volume is 740 m3, helping you gauge the scale of necessary heating or insulation upgrades. Please note that data coverage is partial; the volume is only measured for 43 buildings, and no records for renovation years are currently available in the register. Using these official metrics ensures you have a reliable starting point for assessing the scope of your renovation project.

25
buildings flagged as protected
status known for 120 of 2'303 buildings; check with the municipality
740 m³
median house volume (SIA 416)
measured for 43 of 1'549 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

GABU Contrôle SA

2108 Couvet · about 8.7 km

GABU Contrôle SA performs OIBT electrical inspections, certifies solar installations (Pronovo), and verifies EV charging station compliance for homeowners.

gabucontrole.ch

Soleol SA

1470 Estavayer-le-Lac · about 9.4 km

Soleol SA is a company based in Estavayer-le-Lac specializing in photovoltaic installations, energy storage, and renewable energy solutions.

soleol.ch

swisspro SR SA

2014 Bôle · about 9.5 km

swisspro is a company specializing in electrical installations, charging infrastructure for electric vehicles, and intelligent building automation solutions.

swisspro.ch

Val Energie SA

2114 Fleurier · about 13.3 km

Val Energie SA provides installation services for heating (heat pumps), solar energy (photovoltaics and batteries), and plumbing systems.

val-energie.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Neuchâtel

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
  • Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
  • Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
  • Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).

Source : SCCO_I772_Notice4_PP.pdf

Other works in La Grande Béroche

Home solar battery in nearby towns