Home solar battery · Prilly

Home solar battery in Prilly

Indicative price, tips, grants and companies for your project in Prilly (Vaud).
Home solar battery – Prilly

At a glance

Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4

Worked examples in Prilly

Small project

CHF 4'400 – CHF 10'000

Typical project

CHF 7'900 – CHF 16'900

Large project

CHF 13'600 – CHF 28'000

ProjectQuantityLowHigh
Small project5 kWhCHF 4'400CHF 10'000
Typical project10 kWhCHF 7'900CHF 16'900
Large project18 kWhCHF 13'600CHF 28'000

Computed with our estimator for Prilly (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'300 (20 %)
  • Materials : CHF 8'100 (70 %)
  • Other costs : CHF 1'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Prilly's housing stock in figures

The federal building register lists 800 residential buildings with 7'304 dwellings in Prilly. 76% were built before 1980, before serious insulation standards, and 79% are still heated with oil or gas.

Only 7.2% of residential buildings in Prilly report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

76 %built before 1980
79 %heated by oil or gas
5 %electric hot water
7.2 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–194523 %
  • 1946–196024 %
  • 1961–197015 %
  • 1971–19804 %
  • 1981–19904 %
  • 1991–20005 %
  • 2001–20106 %
  • Since 201110 %

Main heating energy

  • Gas42 %
  • Heating oil37 %
  • Heat pump12 %
  • District heating7 %
  • Electricity1 %
  • Wood1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas42 %36 %
Heating oil37 %39.8 %
District heating7 %6.6 %
Heat pump12 %5.2 %
Electricity1 %5 %
Wood1 %1.2 %
Solar thermal0 %5.6 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)58 %
  • Condensing boiler12.4 %
  • Heat pump11.5 %
  • Standard boiler9.7 %
  • Heat exchanger (district)6.5 %
  • Central electric heating1.3 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses27 %
  • Two-dwelling houses12.6 %
  • Apartment buildings (3+)60.4 %

14.1 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
145 m²
median dwelling area
65 m²

Renovations, heritage and volumes

For your renovation plans in Prilly, RegBL data provides essential benchmarks despite partial coverage. Regarding heritage protection, 10 buildings are classified out of 67 known, necessitating early contact with the municipality for permits. For building volume, the median is 876 m3 based on the SIA 416 standard across 49 measured units. This figure is crucial for determining the scale of your heating and insulation upgrades. Please note that data regarding the renovation year is not available for this municipality. Using these specific figures will help you better prepare your budget and project scope for your local renovation.

10
buildings flagged as protected
status known for 67 of 800 buildings; check with the municipality
876 m³
median house volume (SIA 416)
measured for 49 of 216 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

NAO Energy SA

1020 Renens VD · about 1.4 km

NAO Energy is a company specializing in the installation of photovoltaic solar systems, heat pumps, and energy storage solutions in French-speaking Switzerland.

naoenergy.ch

EVE Car Plug Suisse SA

1023 Crissier · about 2.2 km

EVE Car Plug specializes in the installation of electric vehicle charging stations and provides photovoltaic solutions in Switzerland.

evecarplug.com

Statron Romandie SA

1023 Crissier · about 2.2 km

Specialist in uninterruptible power supply (UPS) solutions and battery energy storage systems (BESS) for industrial applications.

statron.ch

Société anonyme e-lec, succursale de Lausanne

1004 Lausanne · about 2.3 km

Company specializing in the installation of photovoltaic systems, battery storage solutions, and charging stations.

elec.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Prilly

Home solar battery in nearby towns