Heat pump installation · Prilly

Heat pump installation in Prilly

Indicative price, tips, grants and companies for your project in Prilly (Vaud).
Heat pump installation – Prilly

At a glance

Typical budget
CHF 41'600 – CHF 77'500
Midpoint
CHF 58'200
Grants found
1
Nearby companies
4

Worked examples in Prilly

Small project

CHF 32'900 – CHF 60'300

Typical project

CHF 41'600 – CHF 77'500

Large project

CHF 54'600 – CHF 103'300

ProjectQuantityLowHigh
Small project80 m²CHF 32'900CHF 60'300
Typical project160 m²CHF 41'600CHF 77'500
Large project280 m²CHF 54'600CHF 103'300

Computed with our estimator for Prilly (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 23'300 (40 %)
  • Materials : CHF 29'100 (50 %)
  • Other costs : CHF 5'800 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Tips before you start

  • First check whether your area can connect to a priority district heating network.
  • The local design outdoor temperature sets the heat pump's capacity.
  • Outdoor air-water heat pumps must meet noise limits towards neighbours.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Heat pump grant — Buildings Programme

Amount varies by heat pump type and capacity (typically several thousand francs).

Support for replacing fossil or electric heating with a heat pump via the Swiss Buildings Programme and the canton of Vaud.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Prilly's housing stock in figures

The federal building register lists 800 residential buildings with 7'304 dwellings in Prilly. 76% were built before 1980, before serious insulation standards, and 79% are still heated with oil or gas.

With 79% fossil heating and 5% electrically heated hot water, many buildings in Prilly will need a new system. Planning ahead avoids deciding under pressure after a breakdown.

76 %built before 1980
79 %heated by oil or gas
5 %electric hot water
7.2 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–194523 %
  • 1946–196024 %
  • 1961–197015 %
  • 1971–19804 %
  • 1981–19904 %
  • 1991–20005 %
  • 2001–20106 %
  • Since 201110 %

Main heating energy

  • Gas42 %
  • Heating oil37 %
  • Heat pump12 %
  • District heating7 %
  • Electricity1 %
  • Wood1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas42 %36 %
Heating oil37 %39.8 %
District heating7 %6.6 %
Heat pump12 %5.2 %
Electricity1 %5 %
Wood1 %1.2 %
Solar thermal0 %5.6 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)58 %
  • Condensing boiler12.4 %
  • Heat pump11.5 %
  • Standard boiler9.7 %
  • Heat exchanger (district)6.5 %
  • Central electric heating1.3 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation plans in Prilly, RegBL data provides essential benchmarks despite partial coverage. Regarding heritage protection, 10 buildings are classified out of 67 known, necessitating early contact with the municipality for permits. For building volume, the median is 876 m3 based on the SIA 416 standard across 49 measured units. This figure is crucial for determining the scale of your heating and insulation upgrades. Please note that data regarding the renovation year is not available for this municipality. Using these specific figures will help you better prepare your budget and project scope for your local renovation.

10
buildings flagged as protected
status known for 67 of 800 buildings; check with the municipality
876 m³
median house volume (SIA 416)
measured for 49 of 216 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Bluetech Sanitaire Sàrl

1008 Prilly · about 0 km

Lausanne-based company specializing in sanitary installations, bathroom renovation, 24/7 emergency repairs, heating systems, and kitchen equipment.

bluetech-sanitaire.ch

FM TEK Sàrl

1008 Prilly · about 0 km

Based in Prilly, FM TEK Sàrl specializes in the installation and maintenance of heating, air conditioning, ventilation systems, and heat pumps.

fmtek.ch

Jean Monod

1008 Prilly · about 0 km

Specialist since 1953 in installation, maintenance, and repair of heating, ventilation, and air conditioning systems, including renewable energy.

jean-monod.ch

Jean Monod S.A.

1008 Prilly · about 0 km

Jean Monod S.A. in Prilly designs, installs and maintains heating, ventilation and air conditioning systems, with sanitary installations also included in its registered corporate purpose.

jean-monod.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Other works in Prilly

Heat pump installation in nearby towns