Elevator installation or upgrade · Villeneuve

Elevator installation or upgrade in Villeneuve

Indicative price, tips, grants and companies for your project in Villeneuve (Vaud).
Elevator installation or upgrade – Villeneuve

At a glance

Typical budget
CHF 63'800 – CHF 157'500
Midpoint
CHF 104'000
Grants found
0
Nearby companies
4

Worked examples in Villeneuve

Small project

CHF 51'000 – CHF 126'000

Typical project

CHF 63'800 – CHF 157'500

Large project

CHF 89'300 – CHF 220'600

ProjectQuantityLowHigh
Small project3 CHF 51'000CHF 126'000
Typical project5 CHF 63'800CHF 157'500
Large project9 CHF 89'300CHF 220'600

Computed with our estimator for Villeneuve (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 41'600 (40 %)
  • Materials : CHF 52'000 (50 %)
  • Other costs : CHF 10'400 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Drive, car, landing doors and commissioning

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Building permit, special foundations, maintenance contract

Tips before you start

  • The number of stops and any new shaft are the main cost drivers.
  • Adding an elevator to an existing building requires a building permit.
  • Include the annual maintenance contract when comparing quotes.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Villeneuve's housing stock in figures

The federal building register lists 850 residential buildings with 2'950 dwellings in Villeneuve. 64% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

72% of buildings were built before 1990: an asbestos survey is then required before any demolition. A typical dwelling here measures 78 m².

64 %built before 1980
73 %heated by oil or gas
8.1 %electric hot water
11.8 %with declared solar thermal

Age of residential buildings

  • Before 191926 %
  • 1919–19459 %
  • 1946–196012 %
  • 1961–197012 %
  • 1971–19805 %
  • 1981–19908 %
  • 1991–20009 %
  • 2001–20105 %
  • Since 201114 %

Main heating energy

  • Gas52 %
  • Heating oil21 %
  • Heat pump11 %
  • District heating8 %
  • Wood7 %
  • Electricity1 %

Houses or apartment buildings?

  • Single-family houses55.9 %
  • Two-dwelling houses12.5 %
  • Apartment buildings (3+)31.6 %

11.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
113 m²
median dwelling area
78 m²

Renovations, heritage and volumes

For renovation projects in Villeneuve, the official building register figures provide vital context. With 39 buildings under heritage protection, contacting the municipality early is essential to navigate permit requirements. The median house volume stands at 750 m3 according to the SIA 416 standard, which is critical for estimating the scope of heating and insulation upgrades. Please note that data coverage is partial, as building volumes are measured for 309 out of 475 houses. Furthermore, renovation year data is currently unavailable in the register, which should be considered when assessing the current condition of your property.

39
buildings flagged as protected
status known for 138 of 850 buildings; check with the municipality
750 m³
median house volume (SIA 416)
measured for 309 of 475 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

RealElec SA, Succursale de Montreux

1820 Montreux · about 4.4 km

General electrical contractor specializing in electrical installations, lighting, home automation, and elevator connections.

real-elec.ch

Pure Peinture SA

1815 Clarens · about 7.2 km

Pure Peinture SA offers painting, plastering, facade renovation, terrace waterproofing, and asbestos removal services in French-speaking Switzerland.

purepeinture.ch

H & T Raumdesign AG

1815 Clarens · about 7.2 km

H&T Raumdesign AG specializes in interior finishing, kitchen and bathroom design, and now provides residential elevator solutions.

hta.ch

Métrailler Carrelages S.A.

1814 La Tour-de-Peilz · about 9.2 km

Company specialized in the supply and installation of tiles, coverings, and small masonry for interiors, exteriors, and aquatic areas.

metraillercarrelages.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Other works in Villeneuve

Elevator installation or upgrade in nearby towns