Home solar battery · Villeneuve

Home solar battery in Villeneuve

Indicative price, tips, grants and companies for your project in Villeneuve (Vaud).
Home solar battery – Villeneuve

At a glance

Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4

Worked examples in Villeneuve

Small project

CHF 4'400 – CHF 10'000

Typical project

CHF 7'900 – CHF 16'900

Large project

CHF 13'600 – CHF 28'000

ProjectQuantityLowHigh
Small project5 kWhCHF 4'400CHF 10'000
Typical project10 kWhCHF 7'900CHF 16'900
Large project18 kWhCHF 13'600CHF 28'000

Computed with our estimator for Villeneuve (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'300 (20 %)
  • Materials : CHF 8'100 (70 %)
  • Other costs : CHF 1'200 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Battery, charge management and standard connection; options according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Solar panels and complete electrical refurbishment

Tips before you start

  • A battery is worthwhile when solar output clearly exceeds your daytime use.
  • Size capacity by evening consumption, not panel power.
  • Check compatibility with your existing inverter before buying.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Villeneuve's housing stock in figures

The federal building register lists 850 residential buildings with 2'950 dwellings in Villeneuve. 64% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

Only 11.8% of residential buildings in Villeneuve report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

64 %built before 1980
73 %heated by oil or gas
8.1 %electric hot water
11.8 %with declared solar thermal

Age of residential buildings

  • Before 191926 %
  • 1919–19459 %
  • 1946–196012 %
  • 1961–197012 %
  • 1971–19805 %
  • 1981–19908 %
  • 1991–20009 %
  • 2001–20105 %
  • Since 201114 %

Main heating energy

  • Gas52 %
  • Heating oil21 %
  • Heat pump11 %
  • District heating8 %
  • Wood7 %
  • Electricity1 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas52 %47.7 %
Heating oil21 %22.5 %
District heating8 %2 %
Heat pump11 %3.4 %
Electricity1 %8.1 %
Wood7 %5.3 %
Solar thermal0 %10.8 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)55.1 %
  • Condensing boiler14.2 %
  • Heat pump10.6 %
  • Heat exchanger (district)7.7 %
  • Stove5.7 %
  • Standard boiler5.1 %
  • Central electric heating1.1 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses55.9 %
  • Two-dwelling houses12.5 %
  • Apartment buildings (3+)31.6 %

11.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
113 m²
median dwelling area
78 m²

Renovations, heritage and volumes

For renovation projects in Villeneuve, the official building register figures provide vital context. With 39 buildings under heritage protection, contacting the municipality early is essential to navigate permit requirements. The median house volume stands at 750 m3 according to the SIA 416 standard, which is critical for estimating the scope of heating and insulation upgrades. Please note that data coverage is partial, as building volumes are measured for 309 out of 475 houses. Furthermore, renovation year data is currently unavailable in the register, which should be considered when assessing the current condition of your property.

39
buildings flagged as protected
status known for 138 of 850 buildings; check with the municipality
750 m³
median house volume (SIA 416)
measured for 309 of 475 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

NAO Energy SA, succursale de Montreux

1820 Montreux · about 4.4 km

NAO Energy SA is a company specializing in energy transition solutions, installing solar panels, heat pumps, and storage systems across French-speaking Switzerland.

naoenergy.ch

Symetrium construction SA

1814 La Tour-de-Peilz · about 9.2 km

Specialist in energy management systems, building automation, and electrical installations for industrial, commercial, and complex residential projects.

symetrium.com.pl

Eltech System Sàrl

1860 Aigle · about 10.2 km

Eltech System Sàrl is an Aigle-based company specializing in the installation of electrical, telephone, and photovoltaic systems.

eltech-system.ch

Guérin-Guinnard SA

1896 Vouvry · about 11.1 km

Guérin-Guinnard SA specializes in electrical installations, repairs, and photovoltaic solar solutions in the Chablais region.

guerin-guinnard.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Villeneuve

Home solar battery in nearby towns