Window replacement · Villeneuve

Window replacement in Villeneuve

Indicative price, tips, grants and companies for your project in Villeneuve (Vaud).
Window replacement – Villeneuve

At a glance

Typical budget
CHF 7'800 – CHF 18'800
Midpoint
CHF 12'600
Grants found
1
Nearby companies
4

Worked examples in Villeneuve

Small project

CHF 5'100 – CHF 12'700

Typical project

CHF 7'800 – CHF 18'800

Large project

CHF 14'100 – CHF 32'900

ProjectQuantityLowHigh
Small project4 unitsCHF 5'100CHF 12'700
Typical project7 unitsCHF 7'800CHF 18'800
Large project13 unitsCHF 14'100CHF 32'900

Computed with our estimator for Villeneuve (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 4'400 (35 %)
  • Materials : CHF 6'900 (55 %)
  • Other costs : CHF 1'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Frames, glazing and blinds according to answers, per window size; standard making good

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Sliding doors, roof windows, changes to openings

Tips before you start

  • Count your windows by size (small, standard, French doors, bays) for a fairer price.
  • Windows alone are rarely subsidised: grants usually target a full envelope renovation.
  • In protected areas or visible facades, frame shape and colour may be imposed.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Window replacement — Buildings Programme (VD)

Usually included in envelope renovation contributions (per m² or flat rate).

Window replacement can be subsidised when part of an energy renovation of the envelope.

www.leprogrammebatiments.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Villeneuve's housing stock in figures

The federal building register lists 850 residential buildings with 2'950 dwellings in Villeneuve. 64% were built before 1980, before serious insulation standards, and 73% are still heated with oil or gas.

With 64% of buildings dating from before 1980, the envelope is often the biggest saving. 68.4% are one- or two-dwelling houses where the owner decides alone; in apartment buildings, plan for a co-owners' decision. Have asbestos and PCB checked first.

64 %built before 1980
73 %heated by oil or gas
8.1 %electric hot water
11.8 %with declared solar thermal

Age of residential buildings

  • Before 191926 %
  • 1919–19459 %
  • 1946–196012 %
  • 1961–197012 %
  • 1971–19805 %
  • 1981–19908 %
  • 1991–20009 %
  • 2001–20105 %
  • Since 201114 %

Main heating energy

  • Gas52 %
  • Heating oil21 %
  • Heat pump11 %
  • District heating8 %
  • Wood7 %
  • Electricity1 %

Houses or apartment buildings?

  • Single-family houses55.9 %
  • Two-dwelling houses12.5 %
  • Apartment buildings (3+)31.6 %

11.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
3
median footprint
113 m²
median dwelling area
78 m²

Renovations, heritage and volumes

For renovation projects in Villeneuve, the official building register figures provide vital context. With 39 buildings under heritage protection, contacting the municipality early is essential to navigate permit requirements. The median house volume stands at 750 m3 according to the SIA 416 standard, which is critical for estimating the scope of heating and insulation upgrades. Please note that data coverage is partial, as building volumes are measured for 309 out of 475 houses. Furthermore, renovation year data is currently unavailable in the register, which should be considered when assessing the current condition of your property.

39
buildings flagged as protected
status known for 138 of 850 buildings; check with the municipality
750 m³
median house volume (SIA 416)
measured for 309 of 475 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

MENUISERIE VOUARDOUX SARL

1844 Villeneuve VD · about 0 km

Family-run carpentry business specializing in custom interior fittings, window installation, and wooden outdoor structures.

vouardouxsarl.com

Uka Menuiserie Sàrl

1844 Villeneuve VD · about 0 km

Uka Menuiserie Sàrl, based in Villeneuve, specializes in interior and exterior carpentry, including the installation of windows and parquet flooring.

uka-menuiserie.ch

Aubry Menuiserie Sàrl

1820 Montreux · about 4.4 km

Aubry Menuiserie specializes in custom carpentry, timber framing, wood structures, and staircases.

aubry-menuiserie.com

HBF Solutions SA

1847 Rennaz · about 5.1 km

Family business specializing in metal construction, locksmithing, and working with steel, stainless steel, and aluminum for various projects.

hbf-sa.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Tax deductions

  • Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
  • Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
  • Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
  • Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.

Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)

Other works in Villeneuve

Window replacement in nearby towns