Solar panels · Bernex

Solar panels in Bernex

Indicative price, tips, grants and companies for your project in Bernex (Geneva).
Solar panels – Bernex

At a glance

Typical budget
CHF 18'100 – CHF 32'900
Midpoint
CHF 24'800
Grants found
1
Nearby companies
4

Worked examples in Bernex

Small project

CHF 9'800 – CHF 18'500

Typical project

CHF 18'100 – CHF 32'900

Large project

CHF 31'400 – CHF 55'800

ProjectQuantityLowHigh
Small project5 kWcCHF 9'800CHF 18'500
Typical project10 kWcCHF 18'100CHF 32'900
Large project18 kWcCHF 31'400CHF 55'800

Computed with our estimator for Bernex (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'700 (35 %)
  • Materials : CHF 13'700 (55 %)
  • Other costs : CHF 2'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar PV — Geneva support

Variable additional grants; federal one-off payment by capacity.

Geneva strongly supports solar PV, with grants in addition to the federal one-off payment.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Bernex's housing stock in figures

The federal building register lists 1'611 residential buildings with 4'686 dwellings in Bernex. 55% were built before 1980, before serious insulation standards, and 63% are still heated with oil or gas.

Only 12.2% of residential buildings in Bernex report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

55 %built before 1980
63 %heated by oil or gas
7.6 %electric hot water
12.2 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–19454 %
  • 1946–19605 %
  • 1961–197013 %
  • 1971–198023 %
  • 1981–199015 %
  • 1991–200010 %
  • 2001–20109 %
  • Since 201112 %

Main heating energy

  • Heating oil39 %
  • Gas24 %
  • Heat pump22 %
  • District heating7 %
  • Electricity4 %
  • Wood4 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas24 %22.6 %
Heating oil39 %36.6 %
District heating7 %6 %
Heat pump22 %3.1 %
Electricity4 %7.6 %
Wood4 %2.1 %
Solar thermal0 %11.6 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)55 %
  • Heat pump22 %
  • Heat exchanger (district)6.6 %
  • Standard boiler5.5 %
  • Condensing boiler5.4 %
  • Central electric heating3.2 %
  • Direct electric heaters1.3 %
  • Stove0.6 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses64.9 %
  • Two-dwelling houses6.7 %
  • Apartment buildings (3+)28.4 %

7.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
117 m²
median dwelling area
92 m²

Renovations, heritage and volumes

For your renovation projects in Bernex, the federal building registry data shows partial coverage. Although the register lists 1611 buildings, specific details regarding renovation years, heritage protection status, and building volumes based on the SIA 416 standard are not currently recorded or available in our system. Due to this lack of specific RegBL figures, property owners should communicate directly with the local municipal authorities to obtain precise information about their property before starting any major work. Early coordination with the municipality ensures that you address all relevant planning requirements and local building regulations for your renovation project.

0
buildings flagged as protected
status known for 35 of 1'611 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

OHM Electricité Sàrl

1288 Aire-la-Ville · about 2.4 km

General electrical contractor in Aire-la-Ville providing installations, technical studies, and consulting for high and low voltage systems.

ohmelectricite.ch

CNK Connect Sàrl

1258 Perly · about 2.8 km

CNK Connect Sàrl is a company specializing in electrical installations, home automation, charging stations, and new energies throughout French-speaking Switzerland.

cnkconnect.ch

Ardizio Toitures SA

1213 Petit-Lancy · about 3.5 km

Ardizio Toitures SA, active for 100 years in Geneva, specializes in roofing, tinsmithing, waterproofing, insulation, and solar energy.

ardizio-toitures.ch

eControl SA

1213 Petit-Lancy · about 3.5 km

Geneva-based company specializing in high/low voltage electrical installations, NIBT inspections, photovoltaics, and maintenance.

econtrolsa.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève