Roof renovation · Bernex

Roof renovation in Bernex

Indicative price, tips, grants and companies for your project in Bernex (Geneva).
Roof renovation – Bernex

At a glance

Typical budget
CHF 29'700 – CHF 65'400
Midpoint
CHF 44'900
Grants found
1
Nearby companies
4

Worked examples in Bernex

Small project

CHF 16'400 – CHF 37'600

Typical project

CHF 29'700 – CHF 65'400

Large project

CHF 49'600 – CHF 107'200

ProjectQuantityLowHigh
Small project70 m²CHF 16'400CHF 37'600
Typical project140 m²CHF 29'700CHF 65'400
Large project245 m²CHF 49'600CHF 107'200

Computed with our estimator for Bernex (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 22'500 (50 %)
  • Materials : CHF 18'000 (40 %)
  • Other costs : CHF 4'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Covering, scaffolding, insulation and removal according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • New roof structure, asbestos, roof windows and structural reinforcement

Tips before you start

  • Insulating the roof together with the covering is often eligible for the Buildings Programme.
  • Existing solar panels must be removed and refitted: budget for it.
  • At altitude, snow loads and frost influence material choice.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Facade insulation — Geneva

Amounts based on area and target performance.

Geneva support for energy renovation of the building envelope.

www.ge.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Bernex's housing stock in figures

The federal building register lists 1'611 residential buildings with 4'686 dwellings in Bernex. 55% were built before 1980, before serious insulation standards, and 63% are still heated with oil or gas.

Only 12.2% of residential buildings in Bernex report a solar thermal system in the register, so most roofs are still free. Photovoltaics are not recorded there; check the solar cadastre for your roof.

55 %built before 1980
63 %heated by oil or gas
7.6 %electric hot water
12.2 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–19454 %
  • 1946–19605 %
  • 1961–197013 %
  • 1971–198023 %
  • 1981–199015 %
  • 1991–200010 %
  • 2001–20109 %
  • Since 201112 %

Main heating energy

  • Heating oil39 %
  • Gas24 %
  • Heat pump22 %
  • District heating7 %
  • Electricity4 %
  • Wood4 %

Heating and hot water: which energies?

EnergyHeatingHot water
Gas24 %22.6 %
Heating oil39 %36.6 %
District heating7 %6 %
Heat pump22 %3.1 %
Electricity4 %7.6 %
Wood4 %2.1 %
Solar thermal0 %11.6 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)55 %
  • Heat pump22 %
  • Heat exchanger (district)6.6 %
  • Standard boiler5.5 %
  • Condensing boiler5.4 %
  • Central electric heating3.2 %
  • Direct electric heaters1.3 %
  • Stove0.6 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses64.9 %
  • Two-dwelling houses6.7 %
  • Apartment buildings (3+)28.4 %

7.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
117 m²
median dwelling area
92 m²

Renovations, heritage and volumes

For your renovation projects in Bernex, the federal building registry data shows partial coverage. Although the register lists 1611 buildings, specific details regarding renovation years, heritage protection status, and building volumes based on the SIA 416 standard are not currently recorded or available in our system. Due to this lack of specific RegBL figures, property owners should communicate directly with the local municipal authorities to obtain precise information about their property before starting any major work. Early coordination with the municipality ensures that you address all relevant planning requirements and local building regulations for your renovation project.

0
buildings flagged as protected
status known for 35 of 1'611 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Tapernoux SA

1233 Bernex · about 0 km

Tapernoux SA in Bernex provides sanitary installations, bespoke bathrooms, architectural sheet metal work and technical installations for laboratories, industry and medical fluid distribution, supported by an in-house engineering office.

tapernoux-sa.ch

SAFECO SARL

1233 Bernex · about 0 km

Based in Bernex, SAFECO Sàrl specializes in sanitary installations, plumbing, tinware, and roofing works.

safeco.ch

SANIFLOTTE SA

1233 Bernex · about 0 km

Based in Bernex, SANIFLOTTE SA specializes in sanitary installations, tinsmithing, and technical emergency repairs for buildings.

saniflotte.ch

Tous Travaux Habitat SA

1233 Bernex · about 0 km

Tous Travaux Habitat SA is a general construction company providing building, renovation, and exterior landscaping services.

tthsa.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève