Facade insulation · Bernex

Facade insulation in Bernex

Indicative price, tips, grants and companies for your project in Bernex (Geneva).
Facade insulation – Bernex

At a glance

Typical budget
CHF 36'800 – CHF 73'000
Midpoint
CHF 52'800
Grants found
1
Nearby companies
4

Worked examples in Bernex

Small project

CHF 20'000 – CHF 41'400

Typical project

CHF 36'800 – CHF 73'000

Large project

CHF 62'100 – CHF 120'400

ProjectQuantityLowHigh
Small project110 m²CHF 20'000CHF 41'400
Typical project220 m²CHF 36'800CHF 73'000
Large project385 m²CHF 62'100CHF 120'400

Computed with our estimator for Bernex (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 26'400 (50 %)
  • Materials : CHF 21'100 (40 %)
  • Other costs : CHF 5'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Scaffolding, finish and insulation according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Structural damp, asbestos and balcony alterations

Tips before you start

  • A grant application must usually be filed before work starts.
  • External insulation changes the building's look and often needs a permit.
  • Scaffolding is a big share of the cost: bundle facade, windows and roof.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Facade insulation — Geneva

Amounts based on area and target performance.

Geneva support for energy renovation of the building envelope.

www.ge.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Bernex's housing stock in figures

The federal building register lists 1'611 residential buildings with 4'686 dwellings in Bernex. 55% were built before 1980, before serious insulation standards, and 63% are still heated with oil or gas.

With 55% of buildings dating from before 1980, the envelope is often the biggest saving. 71.6% are one- or two-dwelling houses where the owner decides alone; in apartment buildings, plan for a co-owners' decision. Have asbestos and PCB checked first.

55 %built before 1980
63 %heated by oil or gas
7.6 %electric hot water
12.2 %with declared solar thermal

Age of residential buildings

  • Before 191910 %
  • 1919–19454 %
  • 1946–19605 %
  • 1961–197013 %
  • 1971–198023 %
  • 1981–199015 %
  • 1991–200010 %
  • 2001–20109 %
  • Since 201112 %

Main heating energy

  • Heating oil39 %
  • Gas24 %
  • Heat pump22 %
  • District heating7 %
  • Electricity4 %
  • Wood4 %

Houses or apartment buildings?

  • Single-family houses64.9 %
  • Two-dwelling houses6.7 %
  • Apartment buildings (3+)28.4 %

7.9 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
117 m²
median dwelling area
92 m²

Renovations, heritage and volumes

For your renovation projects in Bernex, the federal building registry data shows partial coverage. Although the register lists 1611 buildings, specific details regarding renovation years, heritage protection status, and building volumes based on the SIA 416 standard are not currently recorded or available in our system. Due to this lack of specific RegBL figures, property owners should communicate directly with the local municipal authorities to obtain precise information about their property before starting any major work. Early coordination with the municipality ensures that you address all relevant planning requirements and local building regulations for your renovation project.

0
buildings flagged as protected
status known for 35 of 1'611 buildings; check with the municipality

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Companies in the area

Niklaus peinture

1233 Bernex · about 0 km

Geneva-based company specializing in interior and exterior painting, surface renovation, and decorative resin applications.

niklauspeinture.ch

EP Peinture, Eltschinger Philippe

1233 Bernex · about 0 km

Founded in 1962 and based in Bernex, EP Peinture carries out painting, surface covering and decorating work for interiors and exteriors.

ep-peinture.ch

Atelverre SA

1258 Perly · about 2.8 km

Based in Perly-Certoux, Atelverre Imperatori SA provides building glazing and mirror work, as well as blind replacement and maintenance.

atelverre.ch

Atelverre Impératori SA

1258 Perly · about 2.8 km

Based in Perly-Certoux, Atelverre Impératori SA provides architectural glazing and mirror work, as well as the supply, replacement and maintenance of blinds.

atelverre.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Useful local data

Rules of the canton of Geneva

These rules apply across the whole canton, not only in this town.

Permits

  • Competent authority : Office de l'urbanisme
  • Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
  • Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.
  • Procedure : l'autorisation de construire

Source : Guide Installations Solaires et Thermopompes - Canton de Genève

Other works in Bernex

Facade insulation in nearby towns