Indicative price, tips, grants and companies for your project in Bernex (Geneva).
At a glance
Typical budget
CHF 1'500 – CHF 5'600
Midpoint
CHF 3'200
Grants found
0
Nearby companies
4
Worked examples in Bernex
Small project
CHF 1'000 – CHF 3'900
Typical project
CHF 1'500 – CHF 5'600
Large project
CHF 2'200 – CHF 8'200
Project
Quantity
Low
High
Per unit
Small project
2
CHF 1'000
CHF 3'900
CHF 1'100
Typical project
4
CHF 1'500
CHF 5'600
CHF 800
Large project
7
CHF 2'200
CHF 8'200
CHF 700
Computed with our estimator for Bernex (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 2'100(65 %)
Materials :CHF 800(25 %)
Other costs :CHF 300(10 %)
What the price covers
Included
Supply and installation
VAT
Protection, preparation and chosen work per floor
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Lift, fire-rated unit doors, asbestos
Tips before you start
In condominiums, the assembly decides and the renovation fund often pays.
Plan fire-safety requirements (doors, emergency lighting) early.
Phasing floor by floor keeps the building occupied during works.
Your project in 5 steps
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Grants and subsidies
No specific grant listed for this work. Maintenance tax deductions may still apply.
Bernex's housing stock in figures
The federal building register lists 1'611 residential buildings with 4'686 dwellings in Bernex. 55% were built before 1980, before serious insulation standards, and 63% are still heated with oil or gas.
70% of buildings were built before 1990: an asbestos survey is then required before any demolition. A typical dwelling here measures 92 m².
55 %built before 1980
63 %heated by oil or gas
7.6 %electric hot water
12.2 %with declared solar thermal
Age of residential buildings
Before 191910 %
1919–19454 %
1946–19605 %
1961–197013 %
1971–198023 %
1981–199015 %
1991–200010 %
2001–20109 %
Since 201112 %
Main heating energy
Heating oil39 %
Gas24 %
Heat pump22 %
District heating7 %
Electricity4 %
Wood4 %
Houses or apartment buildings?
Single-family houses64.9 %
Two-dwelling houses6.7 %
Apartment buildings (3+)28.4 %
7.9 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
2
median footprint
117 m²
median dwelling area
92 m²
Renovations, heritage and volumes
For your renovation projects in Bernex, the federal building registry data shows partial coverage. Although the register lists 1611 buildings, specific details regarding renovation years, heritage protection status, and building volumes based on the SIA 416 standard are not currently recorded or available in our system. Due to this lack of specific RegBL figures, property owners should communicate directly with the local municipal authorities to obtain precise information about their property before starting any major work. Early coordination with the municipality ensures that you address all relevant planning requirements and local building regulations for your renovation project.
0
buildings flagged as protected
status known for 35 of 1'611 buildings; check with the municipality
VLP Peinture Sàrl is a Geneva-based company specializing in interior painting, surface renovation, and high-end finishing for residential and commercial clients across French-speaking Switzerland.
LEAD CONSTRUCTIONS SA is a general contractor based in Geneva specializing in the renovation and transformation of functional and residential buildings.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Geneva
These rules apply across the whole canton, not only in this town.
Permits
Competent authority : Office de l'urbanisme
Solar panels : Soumise à autorisation de construire, mais avec une procédure simplifiée si certaines conditions sont remplies (conformité au droit des zones, intégration paysagère et patrimoniale satisfaisante, puissance totale inférieure à 100 kVA). Procédure simplifiée possible par le biais d'une déclaration préalable, si les installations sont sur des toits en pente conformes ou sur des toits plats non visibles, ou dans certains périmètres d'aménagement (zone 4B, 5, 5A, 5B, 6).
Heat pump : Les pompes à chaleur air-eau ou air-air nécessitent une autorisation de construire si leur puissance dépasse 10 kW. Si elles sont installées à l'intérieur, elles sont soumises à la LCI (Loi sur les constructions et les installations) et non à la LALPT (Loi sur l'aménagement du territoire et les constructions). Pour les pompes à chaleur de puissance inférieure ou égale à 10 kW, une déclaration préalable est nécessaire, accompagnée d'une attestation de conformité acoustique. Des exigences en matière de bruit sont mentionnées pour les installations extérieures, avec des valeurs limites d'immissions fixées par l'Ordonnance sur la protection contre le bruit (OPB) et des règles spécifiques du règlement d'application de la LCI (rLCI). Un bureau spécialisé en acoustique est souvent requis pour les projets complexes.