Local housing stock
In Luzern, the federal building register lists 7'159 residential buildings and 47'600 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
Age of residential buildings
76 % built before 1980
- Before 191917 %
- 1919–194521 %
- 1946–196019 %
- 1961–197010 %
- 1971–19809 %
- 1981–19905 %
- 1991–20007 %
- 2001–20107 %
- Since 20116 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
50 % · Gas
- Gas50 %
- Heating oil23 %
- Heat pump17 %
- District heating6 %
- Wood3 %
- Electricity1 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 50 % | 44.1 % |
| Heating oil | 23 % | 18.1 % |
| District heating | 6 % | 5 % |
| Heat pump | 17 % | 12.2 % |
| Electricity | 1 % | 16.6 % |
| Wood | 3 % | 1.8 % |
| Solar thermal | 0 % | 2 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
- Boiler (unspecified)71.6 %
- Heat pump16.8 %
- Heat exchanger (district)6.3 %
- Condensing boiler3.3 %
- Stove1.2 %
- Central electric heating0.5 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
- Single-family houses25.3 %
- Two-dwelling houses7.7 %
- Apartment buildings (3+)67.1 %
16.4 % of buildings mix housing with shops or offices.
The typical building
- storeys (median)
- 4
- median footprint
- 180 m²
- median dwelling area
- 80 m²
Dwellings by number of rooms
Dwellings per building
- 1 dwelling25.3 %
- 2 to 425.5 %
- 5 to 927.6 %
- 10 to 1917.2 %
- 20 or more4.6 %
Renovations, heritage and volumes
For your renovation plans in Lucerne, RegBL figures provide essential benchmarks, though coverage remains partial. With 1253 out of 7159 buildings identified as protected, you must contact the municipality early to address specific heritage requirements. Regarding building volume, the median of 1247 m3 according to SIA 416 helps determine the scale of potential heating or insulation improvements. As these volume metrics are based on only a small sample of the total building stock, we recommend a thorough site-specific assessment. Always verify these structural details early in your planning to ensure accurate budgeting for your upcoming renovation project.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Renovating in Luzern: what to know
Planning works in Luzern, canton of Lucerne? Before requesting quotes, local context helps: climate drives the value of insulation and heating, cantonal rules govern boiler replacement, and tax deductions can noticeably reduce the bill.
Choose your works in Luzern
- Kitchen renovation cost in Luzern
- Bathroom renovation cost in Luzern
- New flooring cost in Luzern
- Interior painting cost in Luzern
- Window replacement cost in Luzern
- Roof renovation cost in Luzern
- Facade insulation cost in Luzern
- Heat pump installation cost in Luzern
- Solar panels cost in Luzern
- Home solar battery cost in Luzern
- Solar water heating cost in Luzern
- Terrace construction cost in Luzern
- Fence installation cost in Luzern
- Stairwell renovation cost in Luzern
- Elevator installation or upgrade cost in Luzern
Nearby municipalities : Emmen · Kriens · Horw · Ebikon · Sursee · Hochdorf · Willisau · Malters
